Download Installation Guide
Transcript
Installation Guide SEGA www.gigateraled.com 031-370-8822 [email protected] (445 - 813) 183-6, Yeongcheon-ro, Dongtan-myeon, Hwaseong-si, Gyeonggi-do, Korea LED Bay Lighting Precaution Electric works must be carried out by workers qualified for electric works. Wiring works should be carried out after powering off lightings. Do not disassemble or modify the product. Do not drop the product or do not allow it to experience a strong impact. Keep the installation guide safely for the purpose of maintenance. The manufacturer or the seller will not be held responsible for what could be caused due to mistakes by the users. 1. 2. 3. 4. 5. 6. Product Configuration A : Tempered Glass B : Reflector D : Cable gland C : LED module E : Eyebolt F : Heat sink AC Power Cable The information in this document is subject to change without notice. Document Revision V 0.52 2014.03.11 1 Installation Guide SEGA www.gigateraled.com 031-370-8822 [email protected] (445 - 813) 183-6, Yeongcheon-ro, Dongtan-myeon, Hwaseong-si, Gyeonggi-do, Korea LED Bay Lighting Installation method ! Shut off the main power before installing the product. ! Install the ceiling fixing bracket by using screws (Standard of the screw is 4.2mm) ! Place the AC power cable onto the bracket. ! Fix the chain to the bracket. ! Fix the chain to the eyebolt. ! Connect the AC power cable to the main power supply. (Refer to Page 1 "AC Power Cable") ! Finish by fixing the AC power cable to the chain. ! Check whether the lighting system keeps the level. ! Connect the product to the main power supply and check whether it operates correctly. ! Contact the manufacturer or the seller for inquiry when there is a problem with the product. The information in this document is subject to change without notice. Document Revision V 0.52 2014.03.11 2