Download Gronomics TNK 48-80 Instructions / Assembly
Transcript
Trellis Net Kit (48”W x 80”H) Assembly Instruction 1 Parts Identification TNK 48-80 2 Using the parts list, locate and count the individual pieces and verify that you have received the correct number of pieces. 1 If any pieces are missing or replacement parts are required, contact Gronomics at 1-855-299-6727. NOTE: Ground stakes (Item 2) and staples (Item 3) are located in the bag with the trellis net (Item 1). 3 ITEM 1 2 3 2 QTY. 1 4 4 PART # 8007 N/A N/A Parts List DESCRIPTION Trellis Net Ground Stakes Staples Net Placement Remove the upper side rail and weave the trellis net (Item 1) onto the side rail. 1 Stretch and secure trellis net across the side rail and lock net into notched ends on each end of the side rail. Trellis net locked in notched end of side rail. Packaged & Inspected by: Date: Continued www.gronomics.com East Bethel, MN USA 763-753-7374 3 Side Rail And Net Placement Install the side rail (with Logo facing the planter box) into the slots on the trellis posts and slide down. Logo NOTE: Make sure the net is seated in the notches on the ends of the side rail when installing side rail and trellis net onto the trellis posts. Stretch and secure the trellis net with staples to the garden bed side rail or secure the trellis net to the ground with ground stakes. Staple Staple Use ground stakes or staples (supplied in kit) to secure the trellis net. www.gronomics.com East Bethel, MN USA Ground Stakes 763-753-7374