Download Eaton POWERWARE 9315 Installation manual

Transcript
Installing the UPS
ÓÓÓ
ÓÓÓÓÓ
ÓÓÓÓÓÓÓÓ
ÓÓÓÓ
ÓÓÓ
ÓÓÓ
ÓÓ
ÓÓÓ
ÓÓÓ
ÓÓ
ÓÓÓÓÓÓÓÓÓÓÓÓÓÓ
ÓÓÓÓÓÓÓÓÓÓÓÓÓÓ
ÓÓÓÓÓÓÓÓÓÓÓÓÓÓ
ÓÓÓ
ÓÓÓ
ÓÓÓ
ÓÓÓ
ÓÓ
ÓÓÓÓÓÓÓÓÓÓÓÓÓÓ
ÓÓÓÓÓÓÓÓÓÓÓ
ÓÓÓÓÓÓÓÓ
ÓÓÓÓÓÓÓÓ
ÓÓÓÓÓ
ÓÓÓÓÓ
ÓÓ
Left Hand Door
2
(8 Places)
I/O Wireway
Rear Support
Side
Support
1
(16 Places)
Front
Support
3
(4 Places)
Foam
Cushion
(4 Places)
Figure 3-2. Removing Front and Rear Supports
5. Pull the foam cushions from under the UPS cabinet. Discard or recycle them in a
responsible manner.
6. Carefully lower the cabinet until the UPS cabinet base contacts the floor.
7. Repeat Steps 1 through 6 for each cabinet you are preparing to install.
EATON Powerware® 9315 UPS (300–500 kVA) Installation Manual S 164201118 Rev H www.powerware.com
3−3