Download Data Centre for High Performance Computing

Transcript
BOQ-HT
2
2.1
2.2
2.3
3
3.1
3.2
Excavation of cable trenches upto a depth of
1000mm refilling and reinstating the trenches and
removing excess soil after proper 4" sand bedding/
coushioning above & below cables with bricks as per
specifications & IS standards.
Excavation in soil, soft murm & Hard murm.
Excavation in soft Rock.
Excavation in Hard Rock.
Supply, laying of following different types of Hume
pipes/pipes in trenches for road crossing for
electrical, telephone cables etc. complete as
required including excavation of trench in all types of
strata except hard rock and refilling, leveling of
trench, shifting of extra earth or debris to dump
yard complete as required.
300 mm dia. RCC Pipe.
200 mm dia. Half round RCC hume Pipe.
Total Of Section-II
M3
M3
M3
1.00
1.00
1.00
Mtr
Mtr
1.00
1.00
0
54 of 77
0
Indian Institute of Tropical Meteorology, Pune