Download Data Centre for High Performance Computing
Transcript
BOQ-HT 2 2.1 2.2 2.3 3 3.1 3.2 Excavation of cable trenches upto a depth of 1000mm refilling and reinstating the trenches and removing excess soil after proper 4" sand bedding/ coushioning above & below cables with bricks as per specifications & IS standards. Excavation in soil, soft murm & Hard murm. Excavation in soft Rock. Excavation in Hard Rock. Supply, laying of following different types of Hume pipes/pipes in trenches for road crossing for electrical, telephone cables etc. complete as required including excavation of trench in all types of strata except hard rock and refilling, leveling of trench, shifting of extra earth or debris to dump yard complete as required. 300 mm dia. RCC Pipe. 200 mm dia. Half round RCC hume Pipe. Total Of Section-II M3 M3 M3 1.00 1.00 1.00 Mtr Mtr 1.00 1.00 0 54 of 77 0 Indian Institute of Tropical Meteorology, Pune
Related documents
VIA30P Installation Instructions
Liebert® eXL™ Uninterruptible Power System
manual técnico de aplicações sanitárias e de aquecimento
DIVISION 16 - ELECTRICAL PAGES Section 16000: Electrical
Tender Document
SDI7984P16
Anexo XVII- LOTE 01
HOME - INSPECTION sarl Rapport d`Inspection PRÉ
ARIA ITALIANO
GPPC - GSPC
608DA07_relazione elettrica R01
TLB 425T User Manual/IFU