Download Reflectix BP48025 Installation Guide

Transcript
Installation Instructions
for Reflectix, Inc.
Double Reflective Insulation
Product consists of two, 96%
reflective layers of film bonded
to two internal layers of heavy
gauge polyethylene bubbles (5/16” thick).
The product is available in 16”, 24” and 48” widths
by 25’.
Products: Products that may be available in your area include:
ST16025 (16”x 25’ w/ staple tab)
BP24025 (24”x 25’)
BP48025 (48”x 25’)
Click here for additional product information.
Pdf Links: Click on the application below for the location of a
detailed Installation Instruction pdf:
Behind Hot Water Radiator Radiant Floor - Wood Joists
Cathedral Ceiling
Storage Building
Crawl Space R-21
Unique Applications
Duct Insulation R-4.2
Wall - 2”x 4’
Duct Insulation R-6.0
Wall - 2”x 6”
Garage Door
Wall - Masonry
Knee Wall
Water Heater
Pipe Wrap
Wine Room
Work Shop
DIY Craw
l
S
pace| (R
Reflectix ®
-21)
Installati
on Instru
ctions
1. Reflecti ®
x Insula
tion
2. Concr
ete Block
3. Band
Board
4. Sub-Flo
or
5. Floor
Joist
4
3
1
2
5
Tools Re
quired:
Safety Gl
asses
Staple Gu
n
Tape Me
asure
Utility Kn
ife/Scissors
Reflecti
Recomme
Staple Ta ve/Bubble/Bubble
nded Pro
b, Reflecti
/Reflecti
ducts:
ve
ve/Bubble
/Bubble/Re - Roll: BP24025
(24”x 25
flective ’), BP4802
Roll: ST1
Installat
5 (48”x
6025 (16
ion Instru
25’)
”x 25’),
ctions:
ST24025
• Inspect
(24”x 25
the crawl
’)
space an
product.
d make
any need
• For flo
ed repair
or joists
s before
that are
product.
installin
16” on-ce
g Reflecti ®
nter, the
• Determi
x Reflecti
installat
ne if the
ve/Bubble
ion is ea
re are wa
siest with
need to
ter pip
be insula
the Refle ®
ted. Refle ® es and heating
ctix Staple
There is
ctix Pipe
ducts wh
no need
Tab (ST)
ich
Wr
to
ap and Du
hang be
wrap wa
provide
low the flo
adequate
ter pipes
ct
Ins
ula
• Begin
or duct wo
tio
insulatin
or joists.
at one
g without
They will
rk that fal ns are designed
extra wr
sp
l betwee
the subflo end of the house
appin
n floor joi ecifically for thi
or (also
s use.
sts. Refle ®
terminatin and staple the fir g.
ctix will
st
g this cou
rse in thi course of product
s fashion).
to the top
of the ba
>
nd board
or