Download Hills FD51038 Installation Guide

Transcript
Clothesline Installation Guide
How to install your clothesline
Folding Head Hoists
1.6ft
Folding Frame Clotheslines
CHECK
FOR LEVEL
LOCKING
COLLAR
Engage in
Ground
Socket
Rotate to
Lock
SOCKET
MAXIMUM
.24in (6mm)
Above
Ground
Level
8.3 in.
(210mm)
Dry Gravel
GROUND
SOCKET
POSTS ARE
CONCRETED
INTO THE GROUND
25.6 in.
(650mm)
CLOSE
TABS TO
KEEP
CLEAR OF
CONCRETE
17.3 in.
(210mm)
Concrete
MAIN
STANDARD
POST MOUNTED
NOTE: POST
MOUNTING KIT IS AN
OPTIONAL EXTRA
WALL MOUNTED
**Masonry anchors are supplied. Consult a Hardware
Specialist if you need fasteners to suit your particular
application.
9.8 in
250mm
Retracting Clotheslines
POST MOUNT ILLUSTRATED
WALL MOUNT ILLUSTRATED
MOUNTING
BAR
RECEIVING BRACKET
POST MOUNTED
TWO PIECE POST
ONE PIECE POST
AVAILABLE
CEMENT
29.5in
(750mm)
5.9in
(150mm)
GRAVEL
7.9in (200mm) Diameter
1
POST INSTALLATION DETAILS
Optional Ground Socket Available
21ft (6.5m) maximum
13ft (4.0m) minimum
MOUNTING CONFIGURATIONS
AND ACCESSORIES REQUIRED
WALL TO WALL
No additional accessories required**
POST TO WALL
1 X MOUNTING BAR
1 X POST REQUIRED
Most Fasteners Included**
WALL TO POST
1 X POST REQUIRED
Most Fasteners Included***
POST TO POST
1 X MOUNTING BAR
2 X POSTS REQUIRED
Most Fasteners Included***
**Masonry anchors are supplied. Consult a Hardware
Specialist if you need fasteners to suit your particular
application.