Transcript
QUICK SET-UP GUIDE Mattress Pad & Blanket STEP 4 Twin/Full Single control set-up STEP 1 Place on bed with label at foot of bed facing out Plug Power Cord into wall Power Cord Left Side Control Right Side STEP 2 Connect the Control Cord connector and module securely Module Label Control Cord Connector STEP 3 Run Control Cord under the bed Flag Tag BASE UNIT for REMOTE CONTROL SET-UP 4 1 Module 2 3 Run Base Unit Cord under the bed QUEEN/KING/CALIFORNIA KING DUAL control set-up STEP STEP 1 2 Place on bed with label at foot of bed facing out STEP 4 Plug Power Cord into wall Left (Secondary) Control Connect the Control Cord connector and module securely Power Cord Left Side Right Side (Label on back of control) Module Label Control Cord Connector Flag Tag STEP 3 Run Control Cord under the bed 4 Right (Primary) Control For questions or support, please visit www.sunbeambedding.com.