Download iNSTALLATioN AND SERViciNg
Transcript
general 1boiler dimensions, services & clearances The boiler connections are made on the boiler connection tails. Refer to Frame 23. The following minimum clearances must be maintained for operation and servicing. Additional space will be required for installation, depending upon site conditions. Side and Rear Flue a. Provided that the flue hole is cut accurately, e.g. with a core drill, the flue can be installed from inside the building where 2.5 from case 2.5 all dimensions in mm wall thicknesses do not exceed 600mm (24”). Where the space into which the boiler is going to be installed is less than the length of flue required the flue must be fitted from the outside. Installation from inside ONLY b. If a core boring tool is to be used inside the building the space in which the boiler is to be installed must be at least wide enough to accommodate the tool. 395 Side flue dim. A 700 43 122 38 104 Front clearance The minimum front clearance when built in to a cupboard is 5mm from the cupboard door but 450mm overall clearance is still required, with the cupboard door open, to allow for servicing. * Bottom clearance Gas Inlet 10 Bottom clearance after installation can be reduced to 5mm. This must be obtained with an easily removable panel, to enable the consumer to view the system pressure gauge, and to provide the 100mm clearance required for servicing. Ideal Logic + System - Installation and Servicing