Download Instructions Manual
Transcript
CIR-e3 Report name: The user can enter the name of the file for identification purposes. This field is limited to 16 characters. For example, the user can enter the name of the place where the measurements are going to be taken. Register period: This field states the recording period. The value ranges from 1 to 120 minutes (2 hours) and it corresponds to a time interval during which we use to store the average of the records taken. The analyzer takes 128 samples per cycle of the signals measured. The registration period indicates the interval desired to take the weighted mean of all samples taken and it stores this value in the memory. For example, if the user select a recording period of 1 minute, the analyzer calculates the mean of all samples of the variables recorded during that minute and stores the results in the memory. From that period, the analyzer also stores the maximum and minimum values measured. Primary voltage: When using transformers to measure the voltage, enter the primary voltage value of the transformer. The information related to this feature of the transformer can be founded on a features label of the transformer. This label must indicate the primary ratio. In case you are not using voltage transformers and you are taking a direct measurement (up to 400 V p-n), the value entered must be 1. Secondary voltage: When using transformers to measure the voltage, enter the secondary voltage value of the transformer. The information related to this feature of the transformer can be found on a features label of the transformer. This label must indicate the secondary ratio. In case you are not using voltage transformers and you are taking a direct measurement, the value entered must be 1. The voltage transformer ranges and transformer ratio have certain limits given below: 1º. Primary voltage range between 1 and 220.000 2º. Secondary voltage range between 1 and 999 3º. Primary/secondary ratio between 1 and 10.000 6.3.2.2 Selection of the current transformer ratio. This option must be selected in case of using CP-5 current clamps which have a nominal secondary current of 5A and are designed to work with a shunt resistor giving 2V at the instrument input. Primary current: In this field, the user must program the rated primary current of the current transformer (CT). The maximum value in this field is limited to 10.000 (The user must check that the measured power limit is less than 70.000.000W). Secondary current: The default value for the CP5 current clamp is a secondary current of 5 A Nominal rated voltage (Ph-Neutral): In this field the user must introduce the nominal voltage between phase and neutral. The allowed range is 50…400V. In case of using a voltage transformer to measure the voltage (HV installations), the value introduced in this field must be the nominal value of secondary of the measuring transformer. Nominal Freq.: Enter the nominal value of the installation's frequency. The values allowed for this field are 50 or 60 Hz. Contracted power (kW): The contracted or “demand power” is usually employed to calculate a “Minimum Charge” in the electricity bill. The term has very different meanings in different countries and in the CIR-e3 is used only for information purposes and does not have any impact on the unit's configuration. After completing the configuration of CIR-e³, click on the button “Generate”. Pag 24 of 50 Instructions manual