Download Manual 10

Transcript
UPS Adira (10kVA, 20kVA 3/1 phase)
7.2.1
Operation
Switching the UPS on / off
Turning on the UPS with connected appliances:

Before turning on the UPS, make sure all appliances are connected correctly.

Turn on the UPS.
The UPS is started up, as the fan turns on and the LCD-display shows a
welcome message. The UPS conducts a self-test.

Press the "ON / OFF" button for more than one second until an acoustic
signal sounds.
The UPS is now turned on. A few seconds later the UPS will switch to
regular operating mode and is now ready for operation.

If a fault is present at the UPS, it switches to battery mode and all outputs
are deactivated.
Turning on the UPS without connected appliances:

Check all connections before turning on the UPS.

Turn on the UPS.
The UPS is started up, as the fan turns on and the LCD-display shows a
welcome message. The UPS conducts a self-test.

Press the "ON / OFF" button for more than one second until an acoustic
signal sounds. The UPS is turned on after this procedure.
Turning-off the UPS

Adira series
Push the "ON / OFF" button for more than three seconds. The system
switches into bypass mode. Disconnect the UPS from the mains input, to
switch it off completely.
51