Download d-lab.2, d-lab.2plus, netlab.2plus - D
Transcript
Putting the Machine in Operation 7.7 d-lab.2, d-lab.2plus, netlab.2plus: Installation Brief Information for Operators during Warm-Up While the machine is heating up, the operator can be informed of the fundamentals of the operation and maintenance, as well as of errors, which can be removed by the operator. This brief information should only serve as refreshment of a previous operating training and cannot replace proper training! 7.8 Checking the Process The quality of the chemical solutions is checked by means of the chemical control strip test. For this test the preexposed chemical control strip is inserted in the machine, processed, and then analyzed. The evaluation of the chemical control strips shows if the chemicals are OK or not. If they are not OK, they must be replaced. Order number of the digital chemical control strips( 5x5): (ABC code) 5HWGX The following requirements must be met: – the machine must be ready for operation (working temperature reached), – and there is no order in process. Open the Printer front door: The control strip box is located in the lower part of the Lane Distributor, LD (d-lab.2) resp. Sheet Distributor, SD (d-lab.2plus, netlab.2plus). Open the lock of the control strip box and remove the box. G_SD701 68 2005-05-01 / PN 05034_00 AgfaPhoto