d. Remove bolt (10) securing synchronizing pushpull tube (9) to drive pulley (16) in right wing and
lower RIGHT flap.
carefully
push-pull
e. Remove bolt securing synchronizing
tube to drive pulley in left wing.
f.
Disconnect
outboard
rods from
flap push-pull
belleranks
in both wings.
tube (8) from drive pulley
g. Disconnect
actuating
(16).
align RIGHT drive pulley so that the centerline
of bolt
rod is 4.20 inches aft of
hole for inboard push-pull
fuel well bulkhead (refer to figure 7-5). Tighten setscrew (7) in accordance
with procedures
outlined in
the following note and secure actuating tube to drive
pulley with bolt (20).
NOTE
Thru Aircraft
setscrew
(7).
Ensure that the 3/32 inch retract
cable is
connected
to the forward side of the right
drive pulley and to the aft side of the left
drive pulley and that the 1/8 inch direct
to the aft side of the
cable is connected
right drive pulley and to the forward side
of the left drive pulley.
Ensure that the
right drive pulley rotates
when
clockwise,
viewed from below, as the flaps are ex_
tended. ( Refer to figure 7-5.)
push-pull
h. Adjust synchronizing
tube (9) in RIGHT
wing to 48.69 inches between centers
of rod end holes,
tighten jam nuts and connect to bellerank and drive
pulley.
THRU AIRCRAFT
SERIALS P20600648 AND
i.
U20601673 WHEN NOT MODIFIED
IN ACCORDANCE
WITH SK150-37
AND WHEN NOT MODIFIED
IN
ACCORDANCE
WITH FIGURE 7-2, SHEET 3. (Refer
to figure 7-2, sheet 1.) Screw actuating tube (8) IN
toward transmission (4) by hand to its shortest length
(flaps full up position).
Loosen setscrew (7) securing
actuating
tube to nut and ball assembly
(6), hold nut
and ball assembly
so that it will not move and adjust
tube IN or OUT as necessary
actuating
to position the
RIGHT drive pulley so that the centerline
of bolt hole
push-pull
rod attachment
for the inboard
is 4.20
inches aft of fuel well bulkhead
(refer to figure 7-5).
Tighten
setscrew
(7) and secure actuating tube to
drive pulley with bolt (20).
SERIALS P20600648 AND
j. THRU AIRCRAFT
U20601673 WHEN MODIFIED
WITH
IN ACCORDANCE
SK150-37 AND WHEN NOT MODIFIED
IN ACCORDANCE WITH FIGURE 7-2, SHEET 3. Operate flap
motor until actuating
tube (8) is IN to its shortest
length (flaps full up position).
Loosen setscrew
(7)
securing
actuating
tube to nut and ball assembly
(6) '
hold nut and ball assembly
so that it will not move
and adjust actuating tube IN or OUT as necessary
to
position
the RIGHT drive pulley so that the centerline
of bolt hole for the inboard push-pull
rod attachment
(refer to figure
is 4. 20 inches aft of fuel well bulkhead
7-5). Tighten setscrew
(7) and secure actuating tube
to drive pulley with bolt (20).
k. BEGINNING WITH AIRCRAFT
SERIAL U20601674 AND ALL AIRCRAFT
MODIFIED
IN ACCORDANCE WITH FIGURE 7-2, SHEET 3. Screw actuating tube (8) IN toward transmission (4) by hand to
12±.05 inches between
collar (32)
switch actuating
and transmission as illustrated
in figure 7-2, VIEW
A-A. Loosen setscrew
(7) securing actuating collar
and
collar to maintain
(32). Hold actuating
adjust actuating tube (8) IN or OUT as necessary
to
.
.12±.05"
Serial
U20602223:
Tighten
Aircraft
Serials
U20602224
thru U20602376: Apply grade CV sealant
to setscrew
(7) threads and torque to 45
lb-in.
with Aircraft
Beginning
Serial
U20602377:
Apply grade CV sealant to
setscrew (7) threads and torque to 60 lb-in.
NOTE
1. Manually
holding RIGHT flap full up, adjust
push-pull
rods to align with drive pulley and bellcrank attachment
Connect push-pull
rods
holes.
and tighten locknuts.
NOTE
The right flap and actuator
MUST be correctly
rigged before cables and left flap can be rigged.
m. Mount
flap.
an inclinometer
on
trailing
.
edge of RIGHT
NOTE
An inclinometer
for measuring
control surface
from the Cessna Service
is available
Parts Center.
Refer to figure 6-4.
travel
n. THRU AIRCRAFT
SERIALS P20600648 AND
U20601673 AND ALL AIRCRAFT
NOT MODIFIED
IN ACCORDANCE
WITH FIGURE 7-2, SHEET 3.
1. With RIGHT flap in full UP position,
adjust
UP-LIMIT
switch (23) to operate
and shut-off electrical power to motor at degree of travel specified
in figure 1-1.
2. Run RIGHT flap to DOWN position
and adjust
DOWN-LIMIT
switch (22) to operate
and shut-off
electrical
power to motor at degree of travel specified in figure 1-1.
o. BEGINNING WITH AIRCRAFT
SERIAL U20601674 AND ALL AIRCRAFT
MODIFIED IN ACCORDANCE WITH FIGURE 7-2, SHEET 3.
1. With RIGHT flap in full UP position,
loosen
setscrew
(29) and slide UP-LIMIT
switch (31) adjustelecment block (30) to operate
switch and shut-off
trical power to motor at degree of travel specified in
figure 1-1. Tighten setscrew (29).
2. Run RIGHT flap to DOWN position and adjust
DOWN-LIMIT
switch (34) adjustment
block (30) to
operate
switch and shut-off electrical
power to motor
at degree of travel specified in figure 1-1. Tighten
setscrew
(29).
p. Run RIGHT flap to full UP position.
push-pull
q. Complete step "h" for synchronizing
tube in LEFT wing.
r. Connect control cables at turnbuckles (index 10
figure 7-1).
Adjust turnbuckles to position left drive
pulley so that the centerline
of bolt hole for the in.
Change 2