Download INSTALLATION MANUAL
Transcript
501028-UIM-C-1209 ACCESSORY CONNECTIONS The furnace control will allow power-switching control of various accessories. ELECTRONIC AIR CLEANER CONNECTION Two 1/4” (6.4 mm) spade terminals (EAC and NEUTRAL) for electronic air cleaner connections are located on the control board. The terminals provide 115 VAC (1.0 amp maximum) during circulating blower operation. HUMIDIFIER CONNECTION Two 1/4” (6.4 mm) spade terminals (HUM and NEUTRAL) for humidifier connections are located on the control board. The terminals provide 115 VAC (1.0 amp maximum) during heating system operation. Condensate must be disposed of properly. Follow local plumbing or wastewater codes. The drain line must maintain a 1/4" per foot (20 mm/m) downward slope to the drain. If an external vent tee is being installed, then it must have its own condensate trap before it is disposed into an open or vented drain. This is not to be considered as a second trap as referenced elsewhere in this document. A mounting hole is provided on the control panel next to the furnace control board for mounting a humidifier transformer if required. TWINNING These furnaces are not to be twinned. If more than one furnace is needed in an application, each furnace must have its own complete duct system and its own wall thermostat. SECTION VI: CONDENSATE PIPING AND FURNACE VENTING CONFIGURATION CONDENSATE DRAIN LOCATION As shipped from the factory: • • Open Stand Pipe (Anti-siphon air vent) For all 060 & 080K input furnaces the main drain is plumbed through the casing right-side opening when viewed from the front of the furnace. For all 100 & 120 input furnaces the main drain is plumbed through the casing left-side opening when viewed from the front of the furnace. 5” Min. Tee NOTICE The Figures 22 - 25 show the condensate drain arrangement for the various possible furnace and vent blower positions. To Open Or Vented Drain The condensate hoses must slope downwards at all points. The furnace condensate pan is self priming and contains an internal trap to prevent flue gas leaking. Do not install an external condensate trap. When drain hose routing changes are required (shown in Figures 2225), be sure to cap all un-used openings. If rerouting hoses - excess length should be cut off so that no sagging loops will collect and hold condensate - which will cause the furnace to not operate. No hose clamps are needed for connecting to the condensate pan. FIGURE 20: Typical. Condensate drain, vertical installation The condensate will flow to the drain better if an open stand pipe is installed in the drain line. See Figure 20. If evaporator coil or humidifier drains are combined with the furnace drain, then the open stand pipe could be raised higher, above the 5” minimum. NOTICE A loop has been added to the pressure switch vacuum hose. However, ensure that all pressure switch hoses are routed such that they prevent any condensate from entering the pressure switch. The furnace, evaporator coil, and humidifier drains may be combined and drained together. The evaporator coil drain may have an external, field-supplied trap prior to the furnace drain connection to prevent conditioned air leakage. All drain connections (furnace, evaporator coil, or humidifier) must be terminated into an open or vented drain as close to the respective equipment as possible. Regular maintenance is required on condensate drainage system. Johnson Controls Unitary Products It is possible for condensation to form inside the combustion air (intake) pipe in the summer months if significant length of combustion air pipe passes through conditioned space. This problem can be averted by the addition of a simple drain tee, or a drain tee with a drain on the combustion air pipe as close to the furnace as possible, as shown in Figure 21. This is true for all long horizontal venting in any furnace configuration. This will prevent the condensate from entering the furnace. 15