Download User Manual - Computer Restore
Transcript
6) When utility and solar are presented, battery charged from solar, ICHG=ISC, load powered from utility, Max. ISC goes up to 25Amp if solar panel with enough energy. Charger source will be turned to utility side in case solar panel without enough energy. Priority Setting Combinations: Charger Priority Output Source Priority solar utility 7