Perform the following checks after installing the measuring device in the pipe:
Endress+Hauser
Device condition and specifications
Notes
Is the device damaged (visual inspection)?
-
Does the device correspond to specifications at the measuring point, including
process temperature and pressure, ambient temperature, minimum fluid
conductivity, measuring range, etc.?
→ ä 100
Installation
Notes
Does the arrow on the sensor nameplate match the actual direction of flow
through the pipe?
-
Is the position of the measuring electrode plane correct?
→ ä 15
Is the position of the empty pipe detection electrode correct?
→ ä 15
Were all screws tightened to the specified torques when the sensor was installed?
Promag D → ä 23
Promag L → ä 25
Promag W → ä 26
Promag P → ä 32
Were the correct seals used (type, material, installation)?
Promag D → ä 21
Promag L→ ä 24
Promag W → ä 26
Promag P → ä 31
Promag H → ä 36
Are the measuring point number and labeling correct (visual inspection)?
-
Process environment / process conditions
Notes
Were the inlet and outlet runs respected?
Inlet run ≥ 5 × DN
Outlet run ≥ 2 × DN
Is the measuring device protected against moisture and direct sunlight?
-
Is the sensor adequately protected against vibration (attachment, support)?
Acceleration up to 2 g by
analogy with IEC 600 68-2-8