Horizontal End Suction, Heavy Duty, Single Stage ANSI Chemical Process Pump, ASME B73.1 - 2001
Installation, Operation, and Maintenance Manual – CPP
Figure 3.1. Correct position of the lifting ropes or chains, side view without and with C-Frame.
3.4 STORING
If the pump is not installed immediately (within one month after shipping date), it should be safely stored prior
to installation in a dry location free of dirt and grit. Furthermore, the pump unit (pump, driver, etc.) should not
be subject to sudden temperature changes or vibrations.
Observe the following steps:
1. Remove pump from shipping crate, but do not damage the crate because the unit is to be reboxed.
2. Remove all instruments and mechanical seal; store them safely.