Download Duramax Building Products 80211 Use and Care Manual
Transcript
A L L P U R P O S E P O L Y S T O R A G E S H E D S Greenhouse OWNER’S MANUAL / Instructions for Assembly Size 10’ x 8’ Ver: 1.0 Customer Service Hotline (800) 483-4674 www.uspolymersinc.com Requires two people and takes 2-3 hours for Installation. • Tall Walk in Shed • Quick & Easy Assembly • Ridge Reinforced Walls • Wide Double Doors • Available in Various Sizes Call us for any missing or damaged parts. Do not return to the store. Duramax Storage Shed Limited Ten Year Warranty U.S. Polymer Inc. will send a replacement part free of charge, in the event of material defects and or workmanship for a period of ten years from the date of purchase. This warranty is extended only to the original purchaser. A purchase receipt or other proof of date of original purchase will be required before warranty service is rendered. In no event shall we pay the cost of flooring, labor, installation or any other costs related thereto. This warranty only covers failures due to defects in material or workmanship which occurs during normal use and does not extend to color change arising due to normal weathering or to damage resulting from misuse or neglect, commercial use, failure to follow assembly instructions and the owner’s manual (including proper anchoring of the shed), painting, forces of nature and other causes which is beyond our control. Claims under this warranty must be made within the warranty period by calling 1-800-483-4674 or mail in a dated sales slip and clear photograph of the part to: U.S. Polymers, Inc. 6915 Slauson Avenue Commerce, CA 90040 We reserve the right to discontinue or change components. If a component has been discontinued or is not available, U.S. Polymers, Inc. reserves the right to substitute a component of equal quality as may be compatible. Limits and Exclusions There are no express warranties except as listed above. The warrantor shall not be liable for incidental or consequential damages resulting from the use of this product, or arising out of any breach of this warranty. All express warranties are limited to the warranty period set forth above . Some states do not allow the exclusion or limitation on how long an implied warranty lasts, so the above limitations may not apply to you. This warranty gives you specific legal rights and you may also have other rights which vary from state to state or country to country. IMPORTANT: USE HAND GLOVES TO PREVENT INJURY. PROFILES Parts List Note: Check all parts prior to installation. CODE DESCRIPTION QTY FC1AP FOUNDATION ‘U’ CHANNEL 2 FC2AP FOUNDATION ‘U’ CHANNEL 2 FC3AP FOUNDATION ‘U’ CHANNEL 2 FC4AP FOUNDATION ‘U’ CHANNEL 2 FCCP FOUNDATION ‘U’ CHANNEL 4 BLAP BASE BAR BACK LEFT 1 BRAP BASE BAR BACK RIGHT 1 BS1AP BASE BAR SIDE FRONT LEFT / BACK RIGHT 2 BS2AP BASE BAR SIDE FRONT RIGHT / BACK LEFT 2 BBFP BASE BAR FRONT 2 ECAP ENTRANCE TAPER CHANNEL 1 COLP COLUMN LONG 16 COSP COLUMN SHORT 2 DCLP DOOR COLUMN PROFILE LEFT 1 DCRP DOOR COLUMN PROFILE RIGHT 1 CS COLUMN SUPPORT 4 CB1P CENTER BAND FRONT 2 CB2P CENTER BAND SIDE FRONT 2 CB3P CENTER BAND SIDE FRONT 2 CB4P CENTER BAND MIDDLE 9 SLAP SLIDING CHANNEL LEFT 1 SRAP SLIDING CHANNEL RIGHT 1 SJP SLIDING CHANNEL JOINT 1 SCAP SLIDING CHANNEL COVER 2 AS1AP TOP ANGLE SIDE FRONT LEFT / BACK RIGHT 2 AS2AP TOP ANGLE SIDE FRONT RIGHT / BACK LEFT 2 ABLAP TOP ANGLE BACK LEFT 1 ABRAP TOP ANGLE BACK RIGHT 1 SB1AP SUPPORT BRACKET FRONT RIGHT/BACK LEFT 2 SB2AP SUPPORT BRACKET FRONT LEFT/BACK RIGHT 2 SB3AP SUPPORT BRACKET LONG FRONT RIGHT/BACK LEFT 2 SB4AP SUPPORT BRACKET LONG FRONT LEFT/BACK RIGHT 2 FBS FACIA BRACKET SUPPORT 8 FSLAP FACIA SUPPORT LEFT 2 FSRAP FACIA SUPPORT RIGHT 2 RS1AP ROOF SUPPORT 4 RS2AP ROOF SUPPORT 4 RS4AP ROOF STRUCTURE 6 RF1AP ROOF FLASHING FRONT RIGHT/BACK LEFT 2 RF2AP ROOF FLASHING FRONT LEFT/BACK RIGHT 2 RFSAP ROOF FLASHING SIDE 4 DSTAP DOOR PANEL STRIP TOP 2 DSBAP DOOR PANEL STRIP BOTTOM 2 DMSAP DOOR PANEL MIDDLE SUPPORT 2 DVSP DOOR PANEL VERTICAL SUPPORT 2 DSP DOOR STOPPER VERTICAL 2 HS HINGES SUPPORT 1 HAS HIGHT ADJUSTABLE SUPPORT 1 WP1A FRONT WALL PANEL LEFT 1 WP2A FRONT WALL PANEL RIGHT 1 WP3A CORNER WALL PANEL 4 WP4A WALL PANEL 9 FLAP FACIA PANEL LEFT 2 FRAP FACIA PANEL RIGHT 2 RP1AP ROOF PANEL 2 RP2AP ROOF PANEL 1 RP3AP ROOF PANEL 2 RP4AP ROOF PANEL 2 RP2AG ROOF PANEL 1 RPWG ROOF PANEL WINDOW 1 RC1P RIDGE COVER 1 RC2P RIDGE COVER 3 DL1AP DOOR PANEL LEFT 1 DL2AP DOOR PANEL LEFT 1 DR1AP DOOR PANEL RIGHT 1 DR2AP DOOR PANEL RIGHT 1 VBCS1 VENTILATION BLOCKING COVER SIDE-1 6 VBCS2 VENTILATION BLOCKING COVER SIDE-2 2 VBCF VENTILATION BLOCKING COVER FRONT/BACK 7 ACCESSORIES CODE DESCRIPTION FCFP FRONT COLUMN FITTING CCFP CORNER COLUMN FITTNG CFP COLUMN FITTING DCBFP DOOR COLUMN BOTTOM FITTING CBFP CENTER BAND FITTING BS BOTTOM SLIDER DH DOOR HANDLE FC RIDGE END CAP TC TOP CORNERS TS TOP SLIDER PPG ROOF PLUG WITH WASHER PIN ROOF PIN PW PLASTIC WASHERS PC PLASTIC SCREW COVER WHG HOOK EDP EDGING PROFILE S1 SHEET METAL SCREW DIA. 4.2mm.x16.0mm. (5/32”x5/8”) S3 MACHINE SCREW with NUTS M4x10.0mm. (5/32”x3/8”) S7 SHEET METAL SCREW DIA. 4.2mm.x10.0mm. (5/32”x3/8”) ‘U’ CHANNEL (FC1AP, 2AP, 3AP, 4AP FCCP) FACIA BRACKET SUPPORT (FBS) COLUMN SUPPORT (CS) CENTER BAND FITTING (CBFP) QTY 2 4 18 2 10 4 2 2 4 4 54 54 318 109 1 1 548 BASE BAR (BLAP, BRAP, BS1AP, BS2AP) BASE BAR FRONT (BBFP) ENTRANCE TAPER CHANNEL (ECAP) 84 76 DOOR COLUMN PROFILE LEFT (DCLP) HOOK (WHG) BOTTOM SLIDER (BS) SLIDING CHANNEL COVER (SCAP) SLIDING CHANNEL (SLAP, SRAP) DOOR COLUMN BOTTOM FITTING (DCBFP) DOOR COLUMN PROFILE RIGHT (DCRP) TOP ANGLE SIDE (AS1AP, AS2AP) SLIDING CHANNEL SUPPORT (SJP) ROOF SUPPORT BRACKET (SB1AP, SB2AP) CORNER COLUMN FITTING (CCFP) PLASTIC SCREW COVER FRONT COLUMN FITTING (PC) (FCFP) TOP ANGLE BACK (ABLAP, ABRAP) DOOR HANDLE (DH) ROOF SUPPORT (RS1AP, RS2AP) ROOF FLASHING (RF1AP, RF2AP, RFSAP) ROOF SUPPORT (RS4AP) (HAS) RIDGE END CAP (FC) COLUMN FITTING (CFP) TOP CORNERS (TC) DOOR PANEL VERTICAL SUPPORT (DVSP) DOOR STOPPER VERTICAL (DSP) DOOR PANEL STRIP (DSTAP, DSBAP) MACHINE SCREW WITH NUT (S3) ROOF PLUG (PPG) TOP SLIDER (TS) DOOR PANEL MIDDLE SUPPORT (DMSAP) COLUMN (COLP, COSP) SHEET METAL SCREW (S1, S7) ROOF PIN (PIN) PLASTIC WASHER (PW) FACIA SUPPORT (FSLAP, FSRAP, SB3AP, SB4AP) CENTER BAND (CB2P, CB3P, CB4P) (HS) CENTER BAND FRONT (CB1P) IMPORTANT: USE HAND GLOVES TO PREVENT INJURY. Exploded View RC1P RC2P RC2P RFSAP RF1AP RC2P RP4AP RP3AP RFSAP RPWG RP2AP RF2AP RP1AP RP1AP RP2AG RF2AP RP4AP RF1AP RFSAP RS4AP RS2AP FSLAP RFSAP RP3AP FSRAP FRAP SB4AP RS1AP SB1AP RS1AP SB3AP SB4AP FRAP VBCS2 VBCS1 AS2AP HS HAS FLAP SB2AP FSRAP RS2AP RS4AP ABLAP WP3A AS1AP WP4A FLAP FSLAP SB1AP FBS SB3AP VBCF ABRAP VBCS1 SLAP AS1AP VBCS2 SJP CB4P AS2AP SRAP WP4A WP4A CB3P CB4P WP4A WP4A WP4A COLP CB2P BLAP VBCF COSP VBCF DCLP COLP BS2AP CB1P WP1A BS1AP BBFP ECAP BS1AP BRAP BS2AP CB1P SCAP COLP COSP SCAP DCRP WP2A FC4AP BBFP CB3P FC1AP WP3A FC2AP FC3AP WP3A LEFT DOOR RIGHT DOOR CB2P CB4P FCCP FC3AP FC2AP FC4AP FC1AP IMPORTANT: USE HAND GLOVES TO PREVENT INJURY. WP4A A. Foundation & Base Frame Note: It is important that these instructions are followed step by step. Note Before Assembling Foundation make sure that the floor level should be perfect flat. Parts needed: (2) Foundation ‘U’ Channel (2) Foundation ‘U’ Channel (2) Foundation ‘U’ Channel (2) Foundation ‘U’ Channel (4) Foundation ‘U’ Channel (1) Base bar back left (1) Base bar back right (2) Base bar side (2) Base bar side (2) Base bar front (1) Entrance taper channel (16) Sheet metal screws (72) Sheet metal screws (FC1AP) (FC2AP) (FC3AP) (FC4AP) (FCCP) (BLAP) (BRAP) (BS1AP) (BS2AP) (BBFP) (ECAP) (S7) (S1) 1. Assemble the channel (FC1AP) & (FC2AP) together using (S1) screws. Make 2 sets. FC2AP FC1AP S1 2. Assemble the channel (FC3AP) & (FC4AP) together using (S1) screws. Make 2 sets. FC3AP FC4AP S1 1 IMPORTANT: USE HAND GLOVES TO PREVENT INJURY. 3. Make a frame with the sub assemblies as shown below. Note FC4AP Make sure while assembling the channel position should be same as shown. FC1AP FC3AP FC2AP FC2AP FC3AP FC1AP FC4AP Channel Position 4. Fix the channel (FCCP) to all the four corners to make a perfect frame. See Fig. FCCP FCCP FCCP FCCP 5. Assemble base bar back left (BLAP) and base bar back right (BRAP) with four (S7) screws. See fig. 1 & 2. Note BLAP Take care of sharp edges. S7 BLAP BRAP BRAP Fig.1 Fig.2 2 IMPORTANT: USE HAND GLOVES TO PREVENT INJURY. 6. Assemble base bar side (BS1AP) and (BS2AP) together with four (S7) screws. See fig. 1 & 2. Make two sets BS2AP S7 BS2AP BS1AP BS1AP Fig.1 Fig.2 7. Place the base bar assembly on top of the foundation. Use (S1) screws to fix the assembly to foundation. BLAP Left S1 Back BRAP Front 8. Insert the base bar side assembly on left side. Insert the edge of (BS2AP) into the back base bar (BLAP) and Secure with (S7) screws see fig. 1 . Place the base bar side assembly on right side. Insert the edge of (BS1AP) into the back base bar (BRAP) and secure with (S7) screws. Right 1 BS2AP BLAP BS1AP BRAP S7 Step 1 BLAP BS1AP BS2AP BS2AP Fig.1 Step 2 S7 BRAP 3 BS1AP Fig.2 IMPORTANT: USE HAND GLOVES TO PREVENT INJURY. 2 9. Using a carpenter square, line up the corners. Secure the base bar side assembly to the foundation with (S1) screws. See blowup. BS2AP S1 BS1AP BS1AP BS2AP 10. Place the base bar (BBFP) on top of base bar side on both side. Secure the with (S7) screw. BS2AP BS1AP BBFP BBFP BBFP BS1AP BS2AP BBFP BS2AP Fig.1 S7 Fig.2 11. Using the carpenter square, line up the corners. Secure the base (BBFP) to the foundation with (S1) screws. S1 BBFP BBFP 4 IMPORTANT: USE HAND GLOVES TO PREVENT INJURY. BS2AP 12. Place the entrance taper channel (ECAP) on top of the (BBFP). Secure with (S1) screws to the foundation. See fig. 1 & 2. S1 BBFP ECAP ECAP BBFP BBFP Fig.1 Note Fig.2 After completing the assembly of the base bar fill the concrete or sand upto the foundation top suraface B. Walls & Columns Note All panels are clearly marked and care should be taken to use the correct one. Parts Needed: (2) Column short (16) Column long (4) Column support (1) Wall panel front left (1) Wall panel front right (4) Wall panel corner (9) Wall panel side (1) Sliding channel right (1) Sliding channel left (1) Sliding channel joint (2) Sliding channel cover (2) Top angle side front left / back right (2) Top angle side front right / back left (1) Top angle back left (1) Top angle back right (2) Center band front (COSP) (COLP) (CS) (WP1A) (WP2A) (WP3A) (WP4A) (SRAP) (SLAP) (SJP) (SCAP) (AS1AP) (AS2AP) (ABLAP) (ABRAP) (CB1P) (2) Center band side front (2) Center band side back (9) Center band middle (1) Door column profile left (1) Door column profile right (4) Corner column fitting (10) Center band fitting (2) Door column bottom fitting (2) Front column fitting (18) Column fitting (4) Top slider (158) Plastic washer (7) Ventilation Blocking Cover front/back (292) Sheet metal screw (18) Sheet metal screw (CB2P) (CB3P) (CB4P) (DCLP) (DCRP) (CCFP) (CBFP) (DCBF) (FCFP) (CFP) (TS) (PW) (VBCF) (S1) (S7) 1. Place the corner column fitting (CCFP) on top of the base bar (BBFP & BS1AP). Secure with the three (S1) screws to the base bar. Follow the same at the other corner. BACK BS1AP S1 CCFP BS2AP CCFP BBFP BS1AP BS2AP BBFP BS1AP BBFP BBFP 5 IMPORTANT: USE HAND GLOVES TO PREVENT INJURY. BS2AP 2. Insert the column (COSP) & (COLP) in to corner column fitting and secure with (S1) screws from inside. Insert the column (COSP) at the top of base (BBFP) and column (COLP) at the top of (BS2AP) Note Make sure the direction of the column opening and arrow up as per blow up. S1 S1 BBFP BS1AP BBFP COSP BS2AP COLP Fig.1 Fig.2 3. Fix the column support (CS) to the column with two (S1) screws. cs S1 4. Insert the column (COSP) & (COLP) in to corner column fitting and secure with (S1) screws from inside. Insert the column (COSP) at the top of base (BBFP) and column (COLP) at the top of (BS1AP) Make sure the direction of the column opening and arrow up as per blow up. Note BS1AP COLP S1 BBFP COSP Fig.1 BS2AP Fig.2 S1 6 Fig.3 IMPORTANT: USE HAND GLOVES TO PREVENT INJURY. 5. Fix the column support (CS) to the column with two (S1) screws. cs S1 6. Assemble the sliding channel (SLAP & SRAP) together with sliding channel joint (SJP). Secure with 8 screws (S7) SLAP SLAP SRAP SRAP SJP SJP S7 7. Insert the front column fitting at the top of front column (COSP) and secure with (S1) screws from inside. Continue the same at the other side. 1 S1 2 FCFP Fig.1 FCFP S1 COSP Fig.2 COSP 7 IMPORTANT: USE HAND GLOVES TO PREVENT INJURY. 8. Place the sliding channel assembly (SLAP & SRAP) on the top of front column fitting at the both ends. Secure with (S1) screws. SLAP SRAP FCFP S1 9. Insert 4 nos of top slider (TS) into the sliding channel as per the direction shown. SRAP TS 10. Place the wall panel (WP3A) on the base bar (BS2AP) front right side of the shed. Line up the holes with base bar. Secure with (S1) screws with washers from out side. Tip WP3A First fix the middle screws then go to the edges. BS2AP FRONT S1 8 IMPORTANT: USE HAND GLOVES TO PREVENT INJURY. 11. Place the wall panel (WP2A) on the base bar (BBFP). Line up the holes with base bar. Secure with (S1) Screws. Tip First fix the middle screws then go to the edges. WP2A WP2A BBFP BBFP S1 12. Insert the Ventilation Blocking Cover (VBCF) in between the sliding channel (SRAP) and the wall panel (WP2A). Lineup the holes with the sliding channel & secure with (S1) screws. Tip First fix the middle screws then go to the edges. WP2A VBCF SRAP WP2A WP3A S1 13. Fix to door column bottom fitting (DCBFP) on the base bar (BBFP) with (S1) screws. S1 ECAP WP2A BBFP 9 DCBFP IMPORTANT: USE HAND GLOVES TO PREVENT INJURY. 14. Place the right Door column (DCRP) on top of the base bar (BBFP) and insert into the wall panel (WP2A). Line up the holes with wall panel and secure with (S1) screws. Make sure the door column bottom fitting to be inside the door column. 3 SRAP Note 2 DCRP BBFP DCRP WP2A WP2A 1 Fig.1 SRAP DCRP S1 S1 Fig.2 Fig.3 15. Fix the door column bottom to the fitting (DCBFP) with (S1) screws. DCRP WP2A BBFP S1 BBFP 16. Assemble the center band (CB1P) with column fitting (CFP). Secure with (S1) screw at one end. Make 2 Sets. S1 CB1P CFP 10 Fig.1 Fig.2 IMPORTANT: USE HAND GLOVES TO PREVENT INJURY. CB1P 17. Fix the column fitting (CFP) to the front column (COSP) with (S1) screws from inside, fix the other end to the Door Column (DCRP) through the wall panel with (S1) screw from inside. CB1P COSP 1 DCRP 2 S1 S1 CB1P Fig.1 Fig.2 18. Secure the wall panel (WP2A) to the center band (CB1P) with (S7) screws from outside. S7 WP2A 19. Place the wall panel (WP3A) on the base bar (BS1AP) front left side. Line up the holes with base bar. Secure with (S1) screws with washers from out side. First fix the middle screws then go to the edges. Tip WP3A BS1AP S1 Fig.1 11 IMPORTANT: USE HAND GLOVES TO PREVENT INJURY. FRONT 20. Place the wall panel (WP1A) on the base bar (BBFP). Line up the holes with base bar. Secure with (S1) screws. Note Make sure the overlapping position of panels is as shown in fig. 2. Tip First fix the middle screws then go to the edges. WP1A WP1A BBFP BBFP Fig.1 S1 21. Insert the Ventilation Blocking Cover (VBCF) in between the sliding channel (SLAP) and the wall panel (WP1A). Lineup the holes with the sliding channel & secure with (S1) screws. WP1A VBCF SLAP WP1A WP3A S1 22. Fix to door column bottom fitting (DCBFP) on the base bar (BBFP) with (S1) screws. S1 ECAP WP1A BBFP DCBFP 12 IMPORTANT: USE HAND GLOVES TO PREVENT INJURY. 23. Place the left Door Column (DCLP) on top of WP1A the base bar (BBFP) and insert in to the wall panel (WP1A). Line up the holes with wall panel and secure with (S1) screws. SLAP Make sure the door column fitting to be inside the door column. 3 Note bottom DCLP 2 DCLP WP1A DCLP BBFP 1 Fig.2 Fig.1 SLAP S1 S1 24. Fix the door column bottom to the fitting (DCBFP) with (S1) Screws. DCLP S1 25. Fix the Column fitting (CFP) to the front Column (COSP) with (S1) screw from inside. Fix other end to the Door Column (DCLP) through the wall panel with (S1) screw from inside. S1 WP1A CFP DCLP 1 S1 Fig.1 CB1P Fig.2 13 IMPORTANT: USE HAND GLOVES TO PREVENT INJURY. 2 26. Secure the wall panel (WP1A)to the centre band (CB1P) with (S7) screws from outside. 27. Place the Corner Column fitting (CCFP) on top of the base bar at the back side on both corners. Secure with (S1) screws. 1 S1 S1 BACK CCFP Fig.2 Fig.1 CCFP 28. Insert the column (COLP) into the Corner Column 1 fitting (CCFP) and secure with (S1) screws. Note 2 Make sure the direction of the Column opening and arrow up as per blowup COLP COLP 4 2&3 COLP Fig.2 Fig.1 5 S1 COLP COLP COLP S1 14 Fig.3 Fig.4 Fig.5 IMPORTANT: USE HAND GLOVES TO PREVENT INJURY. 29. Fix the Column Support (CS) to the columns with two (S1) screws at both corners. COLP CS COLP Fig.1 S1 30 Place the wall panel (WP3A) on the base bar FRONT side (BS2AP) at back left. Line up the hole with base bar and secure with (S1) screws with washers from out side. Tip First fix the middle screws then go to the edges. BS2AP WP3A BACK S1 BS2AP 31. Place the wall panel (WP4A) on the base bar back left (BLAP). Line up the holes with base bar and secure with (S1) screws. See the blow up Note Make sure the overlapping position of panels is as shown in fig. 2. 2 WP4A BLAP 1 S1 WP4A Fig.1 WP3A Fig.2 Tip First fix the middle screws then go to the edges. 15 IMPORTANT: USE HAND GLOVES TO PREVENT INJURY. 32. Place the wall panel (WP3A) on the base bar (BS1AP). Line up the holes with base bar and secure with (S1) screws with washer from out side. First fix the middle screws then go to the edges. Tip WP3A BS1AP S1 Fig.1 BSBP 33. Place the wall panel (WP4A) on the base bar (BRAP). Line up the hole with base bar and secure with (S1) screw with washer from out side. Note Make sure the overlapping position of panels is as shown in fig. 2. Tip First fix the middle screws (top or bottom) then go to the edges. WP4A BRAP DCL BBF BRAP Fig.1 S1 WP3A Fig.2 WP4A 34. Assemble the top back angle left & right (ABLAP & ABRAP) together with (S7) screws. See the blow up ABLAP ABLAP ABRAP ABRAP S7 16 IMPORTANT: USE HAND GLOVES TO PREVENT INJURY. 35. Place the assembled top angle back in between the column and back wall panel top side. Then insert the Ventilation Blocking Cover (VBCF) in between the top angle and the wall panel. Line up the holes with panel and secure with (S1) screws from outside. 2 ABLAP ABRAP VBCF ABRAP 1 S1 Fig.1 ABLAP VBCF S1 Fig.2 36. Assemble the top angle side front and back (AS1AP & AS2AP) together with (S7) screws. Make 2 Sets. AS1AP AS1AP S7 AS2AP AS2AP 37. Place the top angle side assembly on top of back top angle (ABLAP) and top of sliding channel (SLAP). Secure with (S1) screws from top. 2 S1 AS2AP AS1AP 1 Fig.1 AS2AP S1 AS1AP 17 Fig.2 IMPORTANT: USE HAND GLOVES TO PREVENT INJURY. 38. Secure the wall panel to the top angle with (S1) screws. S1 39. Place the top angle side assembly on top of sliding channel (SRAP) and back top angle (ABRAP) secure with (S1) screws. See Details. AS2AP S1 1 AS2AP SRAP 2 AS1AP Fig.1 AS1AP S1 ABRAP Fig.2 40. Secure the Wall Panel to the top angle with (S1) screws. 1 2 S1 Fig.1 Fig.2 18 IMPORTANT: USE HAND GLOVES TO PREVENT INJURY. 41. Assemble the Column fitting (CFP) with all columns (COLP) with (S1) screw. Note 1 Make sure the direction of arrow (Fig. 1) and opening of the Column (Fig. 2) as Shown COLP S1 Fig.1 CFP Fig.2 2 42. Fix one column fitting with columns to the base bar (BS1AP) with (S1) screws from inside. Fr CFP on t BS1AP Fig.1 S1 Ba 43. Place the Wall Panel (WP4A) on the base bar side (BS1AP). Line up the holes with base bar and top angle. Fr o 1. Secure the Panel at bottom with (S1) screws to the base bar from out side. 2. Secure the Panel at top with (S1) screw through the top angle to the Column (COLP) First fix the middle screws (top or bottom) then go to the edges. 2 nt Tip WP4A 1 Ba 19 Fig.1 S1 Fig.2 ck S1 IMPORTANT: USE HAND GLOVES TO PREVENT INJURY. ck 44. Fix two column fitting with column to the base bar (BS2AP) with (S1) screws from inside. CFP BS2AP S1 45. Place the Wall Panel (WP4A) on the base bar side (BS2AP). Line up the holes with base bar and top angle. 1. Secure the Panel at bottom with (S1) screws to the base bar from out side. 2. Secure the Panel at top with (S1) screw through the top angle to the Column (COLP) First fix the middle screws (top or bottom) then go to the edges. Fr o 2 nt Tip WP4A Ba Fig.1 S1 Fig.2 ck S1 46. Fix the Center band fitting (CBFP) to the Column with (S1) screw. S1 CBFP 20 IMPORTANT: USE HAND GLOVES TO PREVENT INJURY. 1 47. Fix the Column fitting (CFP) to the Column with (S1) screw as shown. Fr on t CFP S1 Ba ck 48. Fix the Center band (CB2P) to the Column fitting (CFP) with (S1) screw. See the Fig 1. Fix the other end of the Center band to the Center band fitting (CBFP) with (S1) screw. See the fig. 2 CB2P Fr on t 2 Fig.1 CFP 1 S1 CB2P Fig.2 Ba S1 ck CBFP 49. Fix the Center band (CB4P) to the Center band fitting with (S1) screws. See fig. CB4P o Fr CBFP nt S1 CB4P S1 21 CBFP IMPORTANT: USE HAND GLOVES TO PREVENT INJURY. Ba ck 50. Fix the Column fitting (CFP) to the Column with (S1) screw as shown. Ba CFP S1 Fr on t 51. Fix the Center band (CB3P) to the Center band fitting (CBFP) with (S1) screw. See fig.1 Fix the other end to the Column fitting (CFP). 2 1 CB3P Fig.1 S1 CBFP CB3P Fr on t Fig.2 CFP S1 52. Secure the Panels to the Center bands with (S1) screws with washer from out side. 22 IMPORTANT: USE HAND GLOVES TO PREVENT INJURY. Ba ck ck 53. Fix one Column fittings (CBF) with Columns to the other side of base bar (BS2AP) with (S1) screws from inside. BS2AP BS2AP CBF S1 54. Place the Wall Panel (WP4A) on the base bar side (BS2AP) Line up the holes with base bar and top angle. 1. Secure the Panel at bottom with (S1) screws to the base bar from out side. 2. Secure the Panel at top with (S1) Screw through the top angle to the Column (COLP). Tip 2 First fix the middle screws (top or bottom) then go to the edges. COLP WP4A WP4A 1 S1 Fig.1 BS2AP S1 Fig.2 55. Fix one Column fittings (CBF) with Columns to the other side of base bar (BS1AP) with (S1) screws from inside. BS1AP BS1AP CBF S1 23 IMPORTANT: USE HAND GLOVES TO PREVENT INJURY. 56. Place the Wall Panel (WP4A) on the base bar side (BS1AP) Line up the holes with base bar and top angle. 1. Secure the Panel at bottom with (S1) screws to the base bar from out side. 2. Secure the Panel at top with (S1) Screw through the top angle to the Column (COLP). Tip 2 First fix the middle screws (top or bottom) then go to the edges. WP4A COLP WP4A 1 S1 Fig.1 BS1AP Fig.2 S1 57. Fix the Center band fitting (CBFP) to the Column with (S1) screws. See Fig. CBFP S1 58. Fix the Center band fitting (CFP) to the Column with (S1) screws. See Fig. CFP S1 24 IMPORTANT: USE HAND GLOVES TO PREVENT INJURY. 59. Fix the Center Band (CB3P) to the Column fitting with (S1) Screws. See Fig. 1 Fix the other end to the center band fitting (CBFP) with (S1) screw. See Fig. 2 1 2 CB3P Fig.1 CFP S1 CB3P Fig.2 S1 CBFP 60. Fix the Center Band (CB4P) to the Center Band fitting with (S1) screws. See Fig. CB4P S1 CB4P S1 61. Fix the Column fitting (CFP) to the Column with (S1) screws as shown in blow up. Ba S1 ck CFP Fr 25 IMPORTANT: USE HAND GLOVES TO PREVENT INJURY. on t 62 Fix the Center Band (CB2P) to the Center Band fitting (CBFP) with (S1) screw . See fig. 1 Fix to other end to the Column fitting (CFP) See fig. 2 2 CB2P 1 Fig.1 S1 CBFP CB2P Fig.2 S1 CFP 63. Secure Panel to the Center Bands with (S1) screws with washer from out side. 64. Fix the Column fitting with Column to the back base bar with (S1) screws from inside. CFP S1 26 IMPORTANT: USE HAND GLOVES TO PREVENT INJURY. 65. Place the Wall Panel (WP4A) on the back base bar. Line up the holes with base bar. Secure the Panel at bottom with (S1) screws to the base bar from out side. Tip First fix the middle screws then go to the edges. WP4A S1 66. Insert the Ventilation Blocking Cover (VBCF) in between the top angle and the wall panel. Line up the holes with the top angle & secure with (S1) screws. VBCF COLP S1 67. Fix the Column fitting with Column to the back base bar with (S1) screws. CFP S1 27 IMPORTANT: USE HAND GLOVES TO PREVENT INJURY. 68. Place the Wall Panel (WP4A) on the base bar back. Line up the holes with base bar and top angle.Secure the Panel at bottom with (S1) screws to the base bar from out side. Tip First fix the middle screws then go to the edges. WP4A S1 69. Insert the Ventilation Blocking Cover (VBCF) in between the top angle and the wall panel. Line up the holes with the top angle & secure with (S1) screws. VBCF COLP WP4A S1 70. Fix two Column fittings (CBF) with Columns to the back base bar with (S1) screws from inside. S1 28 IMPORTANT: USE HAND GLOVES TO PREVENT INJURY. 71. Place the Wall Panel (WP4A) on the base bar back. Line up the holes with base bar and top angle. Secure the Panel at bottom with (S1) screws to the base bar from out side. Tip First fix the middle screws then go to the edges. WP4A S1 72. Insert the Ventilation Blocking Cover (VBCF) in between the top angle and the wall panel. Line up the holes with the top angle & secure with (S1) screws. VBCF COLP WP4A S1 73. Fix the Center band fitting (CBFP) on the Columns with (S1) screw. CBFP S1 29 IMPORTANT: USE HAND GLOVES TO PREVENT INJURY. 74. Fix the Column fittings (CFP) to the Column as shown. 2 CFP 1 S1 Fig.1 Fig.2 S1 75. Fix the Center Band (CB4P) with (S1) screws to the Center Band fitting and column fitting. CB4P CFP CB4P CBFP 76. Secure the Panels to the Center bands with (S1) screws with washer from out side. 30 IMPORTANT: USE HAND GLOVES TO PREVENT INJURY. 77. Place the sliding channel cover (SCAP) on sliding channel and secure with (S7) screws at both ends. S7 SCAP 78. Place the another half of sliding channel cover (SCAP) on sliding channel and secure with (S7) screws at both ends. 31 IMPORTANT: USE HAND GLOVES TO PREVENT INJURY. C. Roof Note All parts are clearly marked and care should be taken to use the correct one. Parts Needed: (2) (2) (2) (2) (8) (2) (2) (4) (4) (6) (2) (1) (2) (2) (1) (1) (1) (3) (2) Support bracket front right / back left Support bracket front left / back right Support bracket long - front right / back left Support bracket long - front left / back right Facia bracket support Facia support left Facia support right Roof support Roof support Roof structure Roof panel Roof panel Roof panel Roof panel Roof panel Roof panel window Ridge cover Ridge cover Roof flashing (SB1AP) (SB2AP) (SB3AP) (SB4AP) (FBS) (FSLAP) (FSRAP) (RS1AP) (RS2AP) (RS4AP) (RP1AP) (RP2AP) (RP3AP) (RP4AP) (RP2AG) (RPWG) (RC1P) (RC2P) (RF1AP) (2) Roof flashing (4) Roof flashing (2) Facia panel left (2) Facia panel right (4) Top corner (2) Ridge end cap (134) Plastic washer (54) Roof plug with washer (54) Roof pin (6) Ventilation Blocking Cover Side-1 (2) Ventilation Blocking Cover Side-2 (174) Sheet metal screw (66) Machine screw with nut (RF2AP) (RFSAP) (FLAP) (FRAP) (TC) (FC) (PW) (PPG) (PIN) (VBCS1) (VBCS2) (S1) (S3) SB2AP 1. Assemble the support bracket (SB1AP & SB2AP) with Facia bracket support. Use (S3) bolt & nut. Make 2 Sets SB1AP S3 S3 FBS FBS 2. Assemble the roof support (RS1AP) & (RS2AP) together with (S3) bolt & nut. Make 2 Sets RS1AP RS1AP RS2AP RS2AP S3 32 IMPORTANT: USE HAND GLOVES TO PREVENT INJURY. 3. Assemble the roof support bracket with Roof support assembly at both ends as shown. Use (S3) bolt & nut. Make 2 Sets RS1AP RS2AP SB1AP SB2AP S3 Fig.1 S3 Fig. 2 4. Place the Roof support assembly on top of sliding 2 channel and back top angle. Use (S1) screws to secure. Make 2 Sets. S1 4 1 Fig.1 S1 Fig.2 3 S1 S1 Fig.4 Fig.3 5. Assemble the Support bracket (SB3AP & SB4AP) together with Facia bracket support (FBS). Use (S3) bolt & nut. Make 2 Sets SB4AP SB3AP FBS FBS 33 S3 IMPORTANT: USE HAND GLOVES TO PREVENT INJURY. 6. Assemble the roof Support (RS1AP) & (RS2AP) together with four (S3) bolt & nut. RS1AP RS2AP RS2AP S3 RS1AP 7. Assemble the Support bracket with Roof support 2 assembly as shown. Use (S3) bolt & nut. RS2AP RS1AP S3 1 Fig.1 S3 RS1AP RS2AP Fig.2 8. Place the Roof support assembly on top of the sliding channel and back top angle. Use (S1) screw to secure. 2 S1 1 Fig.1 Fig.2 34 IMPORTANT: USE HAND GLOVES TO PREVENT INJURY. 9. Place the Facia support right (FSRAP) on top of Roof support as shown. Secure with (S1) screws to support bracket and top angle side. S1 1 FSRAP S1 2 Fig.1 Fig.2 SB2AP S1 3 FSRAP Fig.3 10. Place the Facia support left (FSLAP) on the top of Roof support as shown. Secure with (S1) screw to Support bracket and top angle side. FSLAP 3 S1 2 FSLAP 1 S1 Fig.1 Fig.2 SB1AP AS1AP S1 FSLAP FSLAP Fig.3 11. Place the Facia support left (FSLAP & FSRAP) on the top of Roof support as shown. Secure with (S1) screws to Support bracket and top angle side. AS1AP S1 Fig.1 2 3 FSRAP FSLAP FSLAP 1 FSLAP 4 S1 S1 Fig.2 FSRAP Fig.3 AS2AP FSRAP S1 35 Fig.4 Fig.5 IMPORTANT: USE HAND GLOVES TO PREVENT INJURY. 5 12. Place the Roof Structure (RS4AP) on the top of Roof support and top angle side. Secure with (S1) screws to the top angle and Roof support as shown in Fig. 1,2,3 & 4. S1 S1 1 3 RS4AP 2 RS4AP 3 S1 Fig.1 Fig.2 RS4AP 4 S1 RS4AP RS4AP Fig.4 Fig.3 13. Place the Hinges Support (HS) to the roof structure (RS4AP) and secure with (S1) screws. See fig. S1 HS RS4AP RS4AP HS 14. Place the Facia panel (FRAP) on Facia support at right side. Line up the holes with Facia support and fix the Roof plug with washer use a hammer (rubber mallet) to drive in roof pin. First insert all roof plugs with washers (Left & Right) then drive in the roof pins. TIP PPG PIN FRAP 36 IMPORTANT: USE HAND GLOVES TO PREVENT INJURY. RS4AP 15. Place the Facia panel (FLAP) at left side and continue the same. FLAP 16. Place the Facia panel (FLAP) on back side left facia support and fix the Roof plugs with washer and drive in roof pins. FLAP 17. Place the Facia panel (FRAP) on back side right Facia support and fix the roof plugs with washer and drive in roof pins. FRAP 37 IMPORTANT: USE HAND GLOVES TO PREVENT INJURY. 18. Place the Roof panel (RP4AP) on top of the Roof support and Facia support. Line up the holes and secure with (S1) screws with washer. S1 RP4AP RP4AP 19. Place the Roof panel (RP3AP) on the Roof support. Secure with (S1) screws with washer. Note Make sure the overlapping position for roof panel is as shown in blow up RP3AP RP3AP RP4AP 20. Place the Roof panel (RP2AG) on the Roof support. Secure with (S1) screws with washer. Note Make sure the overlapping position for roof panel is as shown in blow up RP2AG RP3AP 38 IMPORTANT: USE HAND GLOVES TO PREVENT INJURY. RP2AG 21. Place the Height Adjustable Support (HAS) to the roof structure (RS2AP) and secure with (S1) screws. see fig. S1 RS2AP HAS 22. Place the Roof Panel Window (RPWG) on top of the Roof Panel (RP2AG). Fix the hinges through the roof panel to Hinges Support (HS) with (S1) screws see fig. S1 RPWG RPWG RP2AG 23. Insert the Hook (WHG) to the Roof Panel Window (RPWG) see fig. 1. For open the window, lift the Hook (WHG) and insert the Height Adjustable Support (HAS) see fig. 2. For Locking the window, insert the Hook (WHG) to the roof structure (RS2AP) see fig. 3. RPWG WHG HAS WHG Fig.1 Fig.2 RS2AP WHG 39 Fig.3 IMPORTANT: USE HAND GLOVES TO PREVENT INJURY. 24. Place the Roof panel (RP1AP) on top of the Roof support and Facia support. Line up the holes and secure with (S1) screws with washer. RP1AP RP1AP RP2AG 25. Place the Roof panel (RP4AP) on the Roof support and secure with (S1) screws with washers RP4AP 26. Place the ridge cover (RC1P) on top of Roof panel and fix with Roof plug with washer and drive in Roof Pins. RC1P RC1P PIN PPG 40 IMPORTANT: USE HAND GLOVES TO PREVENT INJURY. 27. Place the Roof panel (RP3AP) by sliding under the Ridge cover (RC1P) to Roof support. Use (S1) screws with washer to secure. RC1P RP3AP RC1P RP3AP 28. Place the Ridge cover (RC2P) on top of Roof panel and fix with Roof plugs with washer and drive in Roof pins. RC2P PPG RC2P PIN 29. Place the Roof panel (RP2AP) by sliding under the Ridge cover (RC2P) to Roof support. Use (S1) screw with washer to secure. RP2AP RC2P Fig.1 RP2AP Fig.2 41 IMPORTANT: USE HAND GLOVES TO PREVENT INJURY. 30. Place the ridge cover (RC2P) on top of Roof panel RC2P and fix with Roof plugs with washer and drive in roof pins. PPG RC2P PIN 31. Place the Roof panel (RP1AP) by sliding under the Ridge cover (RC2P) to Roof support. Use (S1) screw with washer to secure. RP1AP RP1AP RC2P Fig.1 Fig.2 32. Place the ridge cover (RC2P) on top of Roof panel and fix with Roof plugs with washer and drive in roof pins. PPG RC2P RC2P PIN 42 IMPORTANT: USE HAND GLOVES TO PREVENT INJURY. 33. Insert the Ventilation Blocking Cover Side (VBCS1) VBCS2 & (VBCS2) in between the roof pannel and the top angle side (ASBP). Line up the holes and secure (S1) screws with washer. VBCS1 VBCS1 RP3AP VBCS1 RP4AP RP4AP RP1AP RP2AP RP1AP RP4AP VBCS2 ASBP RP3AP VBCS1 VBCS1 VBCS1 S1 VBCS2 VBCS1 RP4AP VBCS2 Fig.1 RP2AG VBCS2 Fig.2 34. Insert the Roof flashing (RF1AP & RF2AP) under RF1AP the ridge cover. See fig. 1 Line up the holes and fix the roof plug with washer from ridge cover through roof flashing to roof panel drive in the roof pins. See fig. 2 & 3. Use (S3) bolt & nut with washers to fix the Roof flashing & Roof panel. PPG See fig. 4 RF2AP RC2P RF2AP RF1AP RF2AP PIN Fig.1 Fig.2 RF1AP S3 Fig.4 Fig.3 35. Fix the Roof flashing (RFSAP) at the edge of roof panel with (S3) bolt & nut with washers at both side, see the overlapping on the blow up. RFSAP RFSAP RFSAP S3 RFSAP 43 IMPORTANT: USE HAND GLOVES TO PREVENT INJURY. 36. Place the Top corner (TC) on the Roof flashing joint and secure with (S3) bolt & nut. S3 TC 37. Insert the Ridge end cap to the front & back top of the roof and secure with (S1) screws with washer. S1 FC 44 IMPORTANT: USE HAND GLOVES TO PREVENT INJURY. D. Door Parts Needed: (1) (1) (1) (1) (2) (2) Door panel Door panel Door panel Door panel Door panel strip top Door panel strip bottom (DL1AP) (DL2AP) (DR1AP) (DR2AP) (DSTAP) (DSBAP) DMSAP DL1AP DL2AP DVSP DR1AP DR2AP DVSP DSTAP DSTAP DMSAP DSP DSP DSBAP DSBAP (2) Door panel middle support (2) Door stopper vertical (2) Door panel vertical support (2) Door handle (4) Bottom Slider (4) Sheet metal screw (38) Sheet metal screw (18) Machine screw (26) Plastic washer (26) Plastic screw cover (DMSAP) (DSP) (DVSP) (DH) (BS) (S1) (S7) (S3) (PW) (PC) 45 IMPORTANT: USE HAND GLOVES TO PREVENT INJURY. Right Door Assembly DR1AP 1. Assemble the door panel (DR1AP & DR2AP) and Door panel middle support (DMSAP) together with (S3) bolt and nut from inside. DR2AP DR1AP S3 Outside DR2AP DMSAP DMSAP ins ide 2. Place the Door panel vertical support (DVSP) to the Door panel (DR1AP) from inside. Secure the panel to the (DVSP) Use (S7) screws with washer from outside. DR1AP S7 DR1AP DVSP DVSP Outside DR2AP ins 46 IMPORTANT: USE HAND GLOVES TO PREVENT INJURY. ide 3. Assemble the Door stopper vertical (DSP) to the Door panel (DR2AP) make sure the side edge of the panel to be inserted into the door stopper profile (DSP). Secure the stopper with Door panel with (S7) screw as shown in fig. DR2AP DR2AP DSP S7 DSP 4 DSTAP 4. Assemble the Door panel strip top (DSTAP) with Door panel. Make sure the Door panel top edge to be inserted into the (DSTAP). See fig. 1. Secure the Door panel strip top (DSTAP) with door stopper (DSP) with (S7) screw. See fig. 2. Secure the Door panel with DSTAP use (S7) screws with washer. See fig. 3. Secure the DMSAP with DSTAP use (S7) screw. See fig. 3 3 1&2 DVSP DSTAP DSP DSTAP DSP S7 S7 Fig.1 Fig.2 DSTAP DMSAP 47 Fig.3 S7 Fig.4 S7 IMPORTANT: USE HAND GLOVES TO PREVENT INJURY. 5. Assemble the Door panel strip bottom (DSBAP) with Door panel. Make sure the Door panel bottom edge to be inserted into the (DSBAP). See fig. 1 Secure the strip (DSBAP) with Door stopper (DSP) with (S7) screws. See fig. 2 Secure the Door panel with (DSTBP) use (S7) screws with washer from outside. See fig. 3 Secure the (DMSAP) with (DSBAP) use (S7) screw. See fig. 3. Secure (DSBAP) with (DVSP) use (S7) screws. See fig. 4 DSP S7 DVSP DSP DMSAP DSBAP DSBAP Fig.1 Fig.2 DMSAP DVSP 4 3 DSBAP DSBAP S7 Fig.3 S7 1&2 Fig.4 6. Assemble to bottom slider (BS) to the Door panel. Bottom side at both edge with (S3) bolt and nut with washers. BS DSBAP 48 IMPORTANT: USE HAND GLOVES TO PREVENT INJURY. 7. Fix the Door handle (DH) with Door panel from front side with bolt & nut. S3 DH DL1AP Left Door Assembly 8. Assemble the door panel (DL1AP & DL2AP) and DL2AP Door panel middle support (DMSAP) together with (S3) bolt and nut from inside. DL1AP DL2AP DMSAP DMSAP DMSAP 49 IMPORTANT: USE HAND GLOVES TO PREVENT INJURY. 9. Place the door panel vertical support (DVSP) to the Door panel (DL1AP) from inside secure the panel to the (DVSP). Use (S7) screws with washer from out side. DL1AP DL2AP DVSP DL1AP S7 DL1AP DVSP 10. Assemble to Door stopper vertical (DSP) to the DL1AP Door panel (DL2AP). Make sure the side edge of the panel to be inserted into the Door stopper profile (DSP). Secure the stopper with Door panel with (S7) screws as shown in fig. DL2AP DL2AP DSP S7 DSP 50 IMPORTANT: USE HAND GLOVES TO PREVENT INJURY. 4 11. Assemble the Door panel strip top (DSTAP) DSTAP with Door panel. Make sure the Door panel top edge to be inserted into the (DSTAP). Secure the Door panel strip top (DSTAP) with Door stopper (DSP) with (S7) screws. See fig. 1&2. Secure the Door panel with (DSTAP) use (S7) screws with washers from out side. See fig. 3. Secure the (DMSAP) with (DSTAP) use (S7) screws from inside. See fig. 3 Secure the other end of (DSTAP) with (DVSP) use (S7) screws. See fig. 4. 3 1&2 DVSP DSTAP DSP S7 S7 Fig.1 Fig.2 DMSAP S7 Fig.3 Fig.4 12. Assemble the Door Strip bottom (DSBAP) with Door panel. Make sure the Door bottom edge to be inserted into the (DSBAP). Secure the Door panel strip bottom (DSBAP) with Door stopper (DSP) with (S7) screws. See fig. 1& 2. Secure the Door panel with (DSBAP) use (S7) screws with washers from out side. See fig. 3. Secure the (DMSAP) with (DSBAP) use (S7) screws from inside. See fig. 3 Secure the other end of (DSBAP) with (DVSP) use (S7) screws. See fig. 4. DSP DVSP S7 DSTAP DSTAP DMSAP Fig.1 S7 Fig.2 DSP DVSP 4 3 DSBAP S7 51 Fig.3 DSBAP Fig.4 DSBAP IMPORTANT: USE HAND GLOVES TO PREVENT INJURY. 1&2 13. Assemble to bottom slider (BS) to the Door panel bottom side at both edge with (S3) bolt and nut with washers. S3 BS 14. Fix the Door handle (DH) with Door panel from front side with bolt & nut. S3 DH 52 IMPORTANT: USE HAND GLOVES TO PREVENT INJURY. 15. Slide the Door panel assembly into the base bar front (BBFP). Make sure the bottom slider (BS) should slide inside the base bar front. See fig. 1. Fix the Door panel top to the top slider (TS) with (S1) screws. See fig. 2 & 3. TS BBFP BS S1 Fig.1 TS Fig.2 S1 Fig.3 15 a. To get proper alignment of the Door re-align the holes with Door panel. See fig. TS IMPORTANT 16. Fix the plastic screw cover (PC) to the screws and bolts edge from inside to prevent injury. PC PC 53 IMPORTANT: USE HAND GLOVES TO PREVENT INJURY. 17. Cut the Edging Profile (EDP) to the required length and insert to the Sliding Channel joint (SJP) to prevent injury. See fig. SJP EDP 18. Cut the Edging Profile (EDP) to the required length 1 and insert to the Facia Bracket Support (FBS) to prevent injury. See fig. 1 FBS 2 1 2 FBS EDP Fig.1 Fig.2 EDP 19. Cut the Edging Profile (EDP) to the required length and insert to the Support Bracket (SB3AP & SB4AP)to prevent injury. See fig. SB4AP SB3AP EDP 54 IMPORTANT: USE HAND GLOVES TO PREVENT INJURY. 1