Download Ariel 801A Installation Guide
Transcript
Dra win g of wa ter connection As the“ ” from the picture,please make the connection according to the serial number v1,v2,etc. Top shower Switch valve Movable shower head Cold water connection (blue pipe) Hot water connection (red pipe) Cold/hot water switch WS-801A Nozzle Foot massage Steam generator Do not dispose this product as unsorted municipal waste. Collection of such waste separately for special treatment is necessary. Nozzle M6×25 M4×15 Dear Guest, Thank you very much for purchasing our sanitary ware. To enable you to use this product safely and effectively, please read this installation and operation manual carefully before use. CAUTIONS 1. Please ensure that the product installed reliable electric leakage protection device, the power plug contains earth line, and make sure it is reliable earth line. Check the protect system of leakage protection each time before use. 2.Do not turn on water pump, heat pump or air bubble pump without water. 3.Before turn on water pump, check if the water level over jets 10 to 20 mm or not, make sure regular usage of water pump otherwise it will be destroy because of water leakage. 4.People with Hypertension symptom, after drink or heart disease are not allowed to use the bathtub. Children have a bath must under adult's guidance. 5.During use please noticed that don't blocked the jets and avoiding the air adjustment valve overflowing. Also keep the bathtub clean and don't let it blocked by hair or mess. 6.During use, please firstly adjust the water temperature or it will be burned. 7.The bathtub is designed with ergonomic, rise and fall changes are quite big so during usage pay more attention of be slipped. 8.Please shut down the system when not to use. STE P 5 TECHNIQUE PARAMETER Vo l ta ge AC220V( ±10%) 01 F r eq u en c y 50/60H Z Water Volatge Power of steam 0.1~0.2Mpa 3KW generator STE P 6 06 SKETCH Chain wheel of glass door ST E P 3 Plastic pad M4×15 1 2 3 14 15 16 17 18 19 20 21 22 23 24 4 5 6 7 8 9 10 11 12 13 ST E P 4 05 1.ozone 2.top shower 3.roof lamp 4.speaker 5.decorated lamp 6.waist-shaped board 7.movable arm 8.switch 25 9.cold/hot water switch 10.handrail 11.nozzle 12.steam out 13.drainage 14.roof 15.mirror 16.exhaust fan 17.moveable shower 18.temperature sensor 19.decorated board 20.control panel 21.nozzle 22.seat 23.foot massage 24.room body 25.bottom 02 ILLUSTRATION OF INSTALLATION INSTALLATION SKETCH 1.Th e p ro d u ct s sh ou l d b e i n s ta ll ed b y te c h n i ca l guy who a r e g o t th e ce rt i f i c a t e or th os e tech ni ca l w ho are ass i g n b y de al er s. T h e m a i n powe r s wi t c h an d el ec t r o n i c le ak ag e de v i c e sho ul d be in st al l e d. 2.Th e p lu g of ele ct ro n i c s h o ul d be ins t a l l e d ab ov e the ste am g e n er at or a n d t h e le ng th of el e c t r o ni c wire n o t le s s the n 180 0 M M fr o m the ea rt h . 3.Th er e a r e sho ul d be w i t h m a i n po we r sw i t c h fo r hot and c o l d wa te r pip e of s t e a m ro om and t h e wate r p ip e sh ou ld be co n n e c t to dr ai na g e w a t e r pipe . 4.In st al l t he pro du c t s ac c o rd in g to th e di a g ra m of inst al la t i on Wh en f i x e d t h e pl ac e fo r th e p r o du ct s. INSTALLATION PROCESS SIZE:1060X1060X2160mm S T EP1 Specification 150 SP4x15 SP4x25 The socket of power and the socket of telephone Cold water pipe Hot water pipe Specification M6x25 1800 1250 Chain wheel of glass door 25 03 0 25 0 S T E P2 04