Download A.O. Smith Custom Commercial Solar Water Heating Systems Technical Documents

Transcript
Date:
CONTACT
Project name:
Customer \ Company :
Contact person:
Customer Address:
Phone:
Fax:
E-mail:
Project location:
FACILITY INFORMATION
Project Description:
Solar Contribution Requirements (if any):
 New building /new system installation
 Old Building /integration with existing system
If integrating, describe existing system:
Intended collector placement:
Intended tank placement::
Roof slope:
Direction of slope:
Area available for collectors:
Dimensions of tank location/access:
Distance between collectors and storage tank:
Max:
Limiting factors for collectors tilt angle or tank placement:
Is shading an issue (include sketch):
Page 1 of 4
Min:
SOLAR SYSTEM APPLICATION
Please check all that apply and fill in the corresponding details:
 DOMESTIC / SANITARY HOT WATER
Gallons
0
LO(US)
F
Sanitary hot water daily consumption:
Sanitary hot water required temperature:
Additional Details:
 SOLAR ASSISTED SPACE HEATING
0
F
2
LO(U
ft
S)
floors
ft
Desired Room Temperature:
Area to be Heated:
Number of Floors to be Heated:
Average Height of Ceilings:
Additional Details:
 SOLAR POOL HEATING
0
Desired Pool Temperature:
Pool Dimensions: Length:
ft
Pool Environment (indoor / outdoor):
Pool Seasonal Usage:
Width:
 OTHER HEAT DEMAND
Description:
 CENTRAL KITCHEN
Description:
Average Depth:
LO(U
From _____/______/______ To _____/______/______.
S)
Additional Details:
 LAUNDRY FACILITY
ft
F
LO(Uft
S)
Additional Demand:
Page 2 of 4
AUXILIARY ENERGY SOURCE





Natural Gas
Propane
Electricity
Oil
Other______________
*Heat Demand (if known):
3
gallons of oil/ ft Gas/
Oil/ Gas/ Other:
other
Min/ month:
Max /month:
WATER QUALITY
Please specify if there are any water quality problems that might affect the system.
USAGE PROFILES
Please trace a graph below indicating usage profile with PEAK = 100% and everything else being a
percentage of peak. Please LABEL your trace lines for DHW, Process Heating and Space Heating.
NOTE: The daily usage graph is for a 24 HOUR period.
Daily Usage Graph
(Daily Peak:
)
100
75
%
Of
Peak
50
25
0
Midnight
6 am
Noon
Page 3 of 4
6 pm
Midnight
Weekly Usage Graph
(Weekly Peak:
)
100
75
%
Of
Peak
50
25
0
Mon
Tue
Wed
Thu
Fri
Monthly Usage Graph
Sat
Sun
(Monthly Peak:
Mon
)
100
75
%
Of
Peak
50
25
0
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
GENERAL




Please attach project overview drawing if possible.
Please attach roof layout drawing if possible
Please attach pictures if possible.
Please Indicate on the drawings North \ South
Page 4 of 4
Sep
Oct
Nov
Dec
Jan