Download Siemens SIMATIC NET PROFIBUS Operating instructions
Transcript
Passive Components for RS-485 Networks Note Please make sure that the bus terminal is accessible for maintenance and installation work even during operation. To connect the LAN cable, follow the steps below (see Figure 4-32): 1. Open the LAN cable at the point at which the bus terminal will be inserted. 2. Strip approximately 33 mm of the outer sheath. Make sure when removing the sheath that the braid shield is not damaged. 3. Remove a length of approximately 12 mm of the braid shield and foil shield (the foil shield can be left somewhat longer). 10 mm 11 mm ÂÂÂ ÂÂÂ ÂÂÂ ÂÂÂ Figure 4-32 Foil shield 12 mm ÂÂÂÂ ÂÂÂÂ ÂÂÂÂ ÂÂÂÂ Fold braid shield back over outer sheath Preparing the LAN Cable for Connection to the Bus Terminal 4. Fold back the braid shield over the cable sheath. 5. Remove approximately the last 10 mm of insulation from the cores. 6. Fit the LAN cable to the terminal so that the braid shield is lying bare under the cable clamp. 7. Screw the ends of the cores to the corresponding terminals (if the cores are stranded, for example, the trailing cable, wire-end ferrules with 0.25 mm2 complying with DIN 46228 must be used). 8. If the bus terminal is at the start or end of a segment, the integrated terminating resistor must be turned on (switch set to “Terminator on”). 4-56 PROFIBUS Networks SIMATIC NET 6GK1970-5CA20-0AA1 Release 2 05/2000
Related documents
SIMATIC NET
SIMATIC NET - Service, Support
PROFIBUS-Netze SIMATIC NET - Service
Siemens RS-485 Technical data
Manuale di rete PROFIBUS - Service, Support
Visualizza
Siemens SIMATIC NET Operating instructions
Moby E Configuration, Installation and Service Manual Nov 2000
Sistema di periferia decentralizzata ET 200
S7-400 Configurazione e installazione - Service, Support
Siemens S7-400 Network Router User Manual