Download Intellinet 19'', 42U Rack
Transcript
DOUBLE-FRAME RELAY RACK ASSEMBLY INSTRUCTIONS Double Frame_ass_instrux.indd 1 10/26/06 9:17:49 AM Double Rack Parts List iSO 2768-m TOLERANCE D D C D M6X15 M6 M8 D Liner dim. Deviation Shorter side Broken edges < >= Degrees 0.5 3 - 10˚ ± 1˚ 6 ± 0.1 ± 0.1 ± 0.2 3 ± 0.5 10˚ 50˚ ± 0˚30' 6 30 ± 0.2 ±1 50˚ 120˚ ± 0˚20' 30 120 ± 0.3 ±1 120˚ 400˚ ± 0˚10' 120 400 ± 0.5 ±1 400˚ - ± 0˚5' 400 1000 ± 0.8 ±1 1000 2000 ± 1.2 ±1 M6 M8 E >= < M8X15 C Deviation Basic dimension ASSEMBLY HARDWARE M6 M8 E E E PART NO. A B C D E LEVELING FEET F M8X15 M8 M8 M8 M6X15 M6 M6 M6 B (LEFT) F A (RIGHT) D D A (RIGHT) LEVELING FEET F PART DESCRIPTION Base, Right Side Base, Left Side Vertical Support Horizontal Support Vertical Rack Rail Leveling Feet Extension Kit Channel Screw Nut Washer Spring Washer Screw Nut Washer Spring Washer QUANTITY INCLUDED 2 2 2 8 4 4 2 66 66 66 66 8 8 8 8 REV 00 ITEM NO. B (LEFT) D D LEVELING FEET NOMENCLATURE OR DESCRIPTION PART OR IDENTIFYING NO. PARTS MATERIAL: QTY. RQD. MATERIAL SPECIFICATION LIST FINISH CRS1110 (A1) CAD-GENERATED DRAWING DO NOT MANUALLY UPDATE DO NOT SCALE DRAWING APPROVALS DRAWN DATE SIZE DWG NO. SHEET OF REV : 00 CHECKED : Double Frame_ass_instrux.indd 2 10/26/06 9:17:50 AM Step 1 — Assemble the Base M8 NUT iSO 2768-m TOLERANCE WASHER AND SPRING WASHER Basic dimension M8X15 CHANNEL SCREW >= < 3 ± 0.1 3 6 6 30 30 0.5 MOUNTING WAY Deviation Liner dim. Deviation Shorter side Broken edges < >= Degrees - 10˚ ± 1˚ ± 0.1 ± 0.2 ± 0.5 10˚ 50˚ ± 0˚30' ± 0.2 ±1 50˚ 120˚ ± 0˚20' 120 ± 0.3 ±1 120˚ 400˚ ± 0˚10' 120 400 ± 0.5 ±1 400˚ - ± 0˚5' 400 1000 ± 0.8 ±1 1000 2000 ± 1.2 ±1 M8 SPRING WASHER A (RIGHT) M8 NUT MOUNTED SITUATION F (EXTENSION) 1 B (LEFT) M8 WASHER M8 CHANNEL SCREW DETAIL 1 SCALE 2 : 1.5 REV 00 ITEM NO. NOMENCLATURE OR DESCRIPTION PART OR IDENTIFYING NO. PARTS 1) Join one piece of right base A with one piece of extension kit F and left base B using the M8X15 screws, washers, spring washers and nuts as shown in Detail 1. Repeat the process for the other set of A, B & F. MATERIAL: FINISH CRS1110 (A1) CAD-GENERATED DRAWING DO NOT MANUALLY UPDATE DOUBLE FRAME RELAY RACK ASSEMBLY INSTRUCTION DO NOT SCALE DRAWING APPROVALS DRAWN CHECKED : Double Frame_ass_instrux.indd 3 QTY. RQD. MATERIAL SPECIFICATION LIST DATE SIZE DWG NO SHEET OF REV : STEP_1 00 10/26/06 9:17:52 AM Step 2 — Assemble the Left and Right Side Vertical Rail Racks iSO 2768-m TOLERANCE LEFT AND RIGHT BASE GROUP Basic dimension >= < PROFILE < >= Degrees 3 ± 0.1 ± 1˚ ± 0.1 ± 0.2 ± 0.5 10˚ 6 10˚ 50˚ ± 0˚30' 6 30 ± 0.2 ±1 50˚ 120˚ ± 0˚20' 30 120 ± 0.3 ±1 120˚ 400˚ ± 0˚10' 120 400 ± 0.5 ±1 400˚ - ± 0˚5' 400 1000 ± 0.8 ±1 1000 2000 ± 1.2 ±1 - B Deviation Shorter side Broken edges 3 0.5 E Deviation Liner dim. PROFILE PROFILE M8X15 CHANNEL SCREW WASHER EXTENSION KIT SPRING WASHER NUT 2 1 DETAIL 1 SCALE 1 : 5 DETAIL 2 SCALE 1 : 2 A/B/F GROUP REV 00 ITEM NO NOMENCLATURE OR DESCRIPTION. PART OR IDENTIFYING NO. PARTS 1) Join the two left-side vertical rack rails (E) with the left base group (A/B/F) using the M8x15 screws, washers, spring washers and nuts as shown in Details 1 & 2. The square mounting holes should face out as shown in Detail 1. Repeat the process for the right-side vertical rack rails. MATERIAL: FINISH CRS1110 (A1) CAD GENERATED DRAWING DO NOT MANUALLY UPDATE DOUBLE FRAME RELAY RACK ASSEMBLY INSTRUCTION DO NOT SCALE DRAWING APPROVALS DRAWN CHECKED : Double Frame_ass_instrux.indd 4 QTY RQD MATERIAL SPECIFICATION LIST : DATE SIZE DWG NO SHEET OF STEP_2 REV 00 10/26/06 9:17:53 AM Step 3 — Assemble the Horizontal Support Rails iSO 2768-m TOLERANCE Basic dimension >= < HORIZONTAL SUPPORT (D) E Deviation Liner dim. Deviation Shorter side Broken edges < >= Degrees 0.5 3 ± 0.1 10˚ ± 1˚ 6 ± 0.1 ± 0.2 ± 0.5 - 3 10˚ 50˚ ± 0˚30' 6 30 ± 0.2 ±1 50˚ 120˚ ± 0˚20' 30 120 ± 0.3 ±1 120˚ 400˚ ± 0˚10' 120 400 ± 0.5 ±1 400˚ - ± 0˚5' 400 1000 ± 0.8 ±1 1000 2000 ± 1.2 ±1 M5X15 CHANNEL SCREW 2 DETAIL 2 SCALE 1 : 4 1 DESK LEVELING FEET DETAIL 1 SCALE 1 : 5 PROFILE 3) Attach four horizontal support rails (D) to the top right-side rack assembly using the M8x15 screws, washers, spring washers and nuts as shown in Detail 2. A/B/F GROUP LEFT BASE REV 00 ITEM NO. NOMENCLATURE OR DESCRIPTION PART OR IDENTIFYING NO. PARTS 1) Attach four horizontal support rails (D) to the bottom right-side rack assembly using the M8x15 screws, washers, spring washers and nuts as shown in Detail 1. 2) Attach the leveling feet to the bottom of the rack assembly using the M8 washer and nut as shown in Detail 1. MATERIAL: FINISH CRS1110 (A1) CAD-GENERATED DRAWING DO NOT MANUALLY UPDATE DOUBLE FRAME RELAY RACK ASSEMBLY INSTRUCTION DO NOT SCALE DRAWING APPROVALS DRAWN CHECKED : Double Frame_ass_instrux.indd 5 QTY. RQD. MATERIAL SPECIFICATION LIST DATE SIZE DWG NO SHEET OF REV : STEP_3 00 10/26/06 9:17:55 AM Step 4 — Assemble the Open Rack LEVELING FEET Basic dimension PROFILE >= < RIGHT BASE GROUP E 1 Deviation Liner dim. 3 ± 0.1 3 6 6 30 30 0.5 2 iSO 2768-m TOLERANCE DETAIL 1 SCALE 1 : 5 PROFILE Deviation Shorter side Broken edges < >= Degrees - 10˚ ± 1˚ ± 0.1 ± 0.2 ± 0.5 10˚ 50˚ ± 0˚30' ± 0.2 ±1 50˚ 120˚ ± 0˚20' 120 ± 0.3 ±1 120˚ 400˚ ± 0˚10' 120 400 ± 0.5 ±1 400˚ - ± 0˚5' 400 1000 ± 0.8 ±1 1000 2000 ± 1.2 ±1 CHANNEL SCREW HORIZONTAL SUPPORT (D) HORIZONTAL SUPPORT (D) 3 LEFT BASE GROUP HORIZONTAL SUPPORT (D) LEFT BASE 2 DETAIL SHOWS MOUNTING OF LEVELING FEET 1) Join the left-side rack assembly to the right-side rack assembly by attaching the right-side support rails to the left using the M8x15 screws, washers, spring washers and nuts as shown in Details 1 & 2. 2) Attach the leveling feet to the bottom of the left-side rack assembly using the M8 washer and nut as shown in Detail 3. 3) Stand the rack upright on the leveling feet and firmly tighten all nuts and bolts. REV 00 ITEM NO. DETAIL 3 SCALE 1 : 3 PARTS MATERIAL: DOUBLE FRAME RELAY RACK ASSEMBLY INSTRUCTION DO NOT SCALE DRAWING APPROVALS DRAWN CHECKED : Double Frame_ass_instrux.indd 6 QTY. RQD. MATERIAL SPECIFICATION LIST FINISH CRS1110 (A1) CAD-GENERATED DRAWING DO NOT MANUALLY UPDATE DETAIL 2 SCALE 1 : 5 NOMENCLATURE OR DESCRIPTION PART OR IDENTIFYING NO. DATE SIZE DWG NO SHEET OF REV : STEP_4 00 10/26/06 9:17:57 AM Step 5 — Attach the Vertical Support Rails iSO 2768-m TOLERANCE Basic dimension >= < 3 ± 0.1 3 6 6 30 30 0.5 M6X15 SCREW VERTICAL SUPPORT (C) COMBINED VIEW Deviation Liner dim. Deviation Shorter side Broken edges < >= Degrees - 10˚ ± 1˚ ± 0.1 ± 0.2 ± 0.5 10˚ 50˚ ± 0˚30' ± 0.2 ±1 50˚ 120˚ ± 0˚20' 120 ± 0.3 ±1 120˚ 400˚ ± 0˚10' 120 400 ± 0.5 ±1 400˚ - ± 0˚5' 400 1000 ± 0.8 ±1 1000 2000 ± 1.2 ±1 1 D E DETAIL 1 SCALE 1 : 5 1) Attach the vertical supports rails (C) to the top of the rack by using the M6x15 screws, washers, spring washers and nuts as shown in Detail 1. REV 00 ITEM NO. NOMENCLATURE OR DESCRIPTION PART OR IDENTIFYING NO. PARTS MATERIAL: QTY. RQD. MATERIAL SPECIFICATION LIST FINISH CRS1110 (A1) CAD-GENERATED DRAWING DO NOT MANUALLY UPDATE DOUBLE FRAME RELAY RACK ASSEMBLY INSTRUCTION DO NOT SCALE DRAWING APPROVALS DRAWN CHECKED : Double Frame_ass_instrux.indd 7 DATE SIZE DWG NO SHEET OF REV : STEP_5 00 10/26/06 9:17:59 AM www.intellinet-network.com Are you completely satisfied with this product? Please contact your INTELLINET NETWORK SOLUTIONS™ dealer with comments or questions. Copyright © INTELLINET NETWORK SOLUTIONS All products mentioned are trademarks or registered trademarks of their respective owners. Double Frame_ass_instrux.indd 8 10/26/06 9:18:01 AM