Download 6.9 Pressure circulating system (DUS) (optional)

Transcript
Cleaning, maintenance and repair
12.4
Service plan – overview

Carry out maintenance work when the first interval is reached.

The times, continuous services or maintenance intervals of any
third party documentation shall have priority.
After the first working run
Component
Maintenance work
see
page
Wheels

Wheel nut check
190
Hydraulic system

Check for leak tightness
192
Spraying pump

Check the oil level
199
Workshop work
On a daily basis
Component
Maintenance work
Whole machine

Visual check for faults

Check the clogging indicator
Fluid filter (Profi-folding)
see
page
195
If necessary, replace
X
199
Spraying pump
164
Spray liquid tank
Line filter in the nozzle lines 
(if present)
Cleaning, flushing
206
205
Spraying nozzle
Brake
Workshop work

Drain air reservoir
187
Weekly / every 50 working hours
Component
Maintenance work
Hydraulic system

Wheels

BAG0021.5 11.11
see
page
Workshop work
Check for leak tightness
192
X
Check the air pressure.
190
181