Download Spartan III System User Manual
Transcript
Section 3 - General Information: Maintenance 1. Inspect and lubricate Catalyst Slave Pump Linkage. GlasCraft recommends that you contact your gel-coat and/or resin supplier concerning material pot-life during extended periods of shut-down. The decision as to whether or not to leave material in your system should be based on information from your material suppliers as well as GlasCraft. 2. Inspect Pump Shafts on Material and Catalyst Consult your local authorized GlasCraft distributor for more information concerning system storage. Maintenance Sec. 3:3 It is recommended that the following service be performed on a weekly basis. (See Catalyst Slave Pump User Manual.) Pumps, making certain they are clean and free of foreign material. Clean and lubricate as required. For long term storage of your injection system, it is recommended that the following procedures be followed: 1. Place dry nitrogen in the material drums and secure drum. 2. Make certain all air and material valves are in their “OFF” position. 40