Download CN8600
Transcript
CN8600 User Manual Note: Dual power operation is optional – the second power source is for back-up; a second power adapter requires a separate purchase 11. Power on the CN8600, then power on the server/KVM switch. Note: For safety reasons, we suggest you ground the switch using a grounding wire. Over-IP PDU 1 Over-IP devices 4 9 3 2 7 8 5 6 10 Network 2 DVI KVM Cable Connection 16