Download Hoefer SE400 / SE410
Transcript
2.4 Final assembly Note: Before the first use, disassemble the unit and wash with a dilute solution of a laboratory detergent and rinse thoroughly, first with water and then distilled water. Note: To help hold the gasket against the upper buffer chamber, dab a small amount of GelSeal at each end of the gasket only and then install. 1 inse both buffer chambers with water and distilled R water thoroughly before each use. 2 Install the gel sandwich in the lower buffer chamber Release the sandwich from the caster by removing both cams. Clean away any gel adhering to the exterior of the gel sandwich. Install the sandwich in the lower buffer chamber, clamp screws facing toward the leads. 3 Important! A smooth fit between the sandwich and gasket is essential for a good seal. Carefully fill each sample well with electrophoresis buffer, then underlay prepared sample into the wells using a fine-tipped microsyringe or gel loading pipet tip. 4 Attach the upper buffer chamber to the gel sandwich Invert the upper chamber and press the slotted gasket into the grooves for a precise fit. Proceed with care so that the samples are not disturbed: Lower the upper chamber onto the gel sandwich. Install the cams, ridge pointing down, into the cam holes as shown on page 17. Simultaneously turn one cam clockwise and the other counterclockwise a full 180° to secure the assembly. • p16