Download Analysis Control - Documents & Reports
Transcript
HDM Manager 15 Data Bank - ConstructionPoLicies Page 1/3 Description CONSTRUCTION ConstructionDuration (y) Annual Cost Stream (% of total cost): Salvage Value (% of totaL cost) Cost Factor ,GEOMETRY P Road Type (Paved/Unpaved) 1.0 Road Length (km) One ShoulderWidth (m) 0.0 Rise & Fall (m/km) 0.0 Superelevation(X) 1 ConstructionYear 1 ConstructionYear 2 ConstructionYear 3 ConstructionYear 4 ConstructionYear 5 0.0 0.0 0.0 0.0 0.0 0.0 0.00 Road Width (m) EffectiveNumber of Lanes Curvature (deg/km) 2.5 0.0 Next Page Edit Print Save Retrieve Exit For detailedinformationon the informationrequestedat the Paved MaintenancePolicies, UnpavedMaintenance,and ConstructionPolicies options, refer to the HDM manuals. The HDM manuals describe each input item, the units used, and the valid range. STEP3 - Define Stratezies The HDM Manager evaluatesand compares five road agency strategies at a time. Each strategyis composedof one or more than one road agency policy that is valid for a certain period. The program always analyzes five strategies. Therefore, you always have to define five strategies even if you are interestedin the results of only one or two strategies. You could use the other strategies to do some sensitivityanalysis. When you select the Define Strategiesoption, the screen below appears. The Definitionof Strategiesmenu is similar to the AnalysisControl menu. Use the Edit option to edit the information,the Print option to print the information,the Keen option to store the informationinto a data set file for future use, the Get option to retrieve a data set information, and the Save/Exitoption to save the current informationand return to the previous menu. To define the strategies enter the descriptionof the set of strategies and for each strategy definesthe policies that compose the strategy. For each strategy, define at least the followinginformation: - The description of the strategy - The starting year of the first policy - The descriptionof the first policy