Download BAAN IV - Baan Implementation Help, Consulting and Tutorials
Transcript
List of sessions The Setups will have to be attached to each Operation in the Routing, although this process is not mandatory. The user must maintain the Operation Relationships. A record must exist for each manufactured item in the Maintain Routing codes by Item (tirou1102m000) session. BaanSync Scheduler 6.0 Interface User Manual 5-31