Download BAAN IV - Baan Implementation Help, Consulting and Tutorials

Transcript
List of sessions
The Setups will have to be attached to each Operation in the Routing, although
this process is not mandatory.
The user must maintain the Operation Relationships.
A record must exist for each manufactured item in the Maintain Routing codes
by Item (tirou1102m000) session.
BaanSync Scheduler 6.0 Interface User Manual
5-31
Related documents