Download Operating Instructions Rotation Viscometer PCE

Transcript
OPERATING INSTRUCTIONS
www.industrial-needs.com
3
Putting Viscometer into Operation
3.1
Unpacking the Viscometer
After receiving the Viscometer, proceed as follows:




3.2
Check the Viscometer packaging for possible transport damages
If the packaging is damaged, contact the responsible transport before opening the packaging.
After the equipment has been unpacked, check for any visible signs of damage and if any is
found contact your supplier.
Remove all the packaging items and transport safety, recyclable material should be disposed in
the intended containers, the main reason.
Delivery Content





7
Portable rotation viscometer PCE-RVI 3
Standard spindle set (R2-R7)
Spindle guard
Tools
4 x additional alkaline battery
AA / LR6 (6V)