Download Operating Instructions Rotation Viscometer PCE
Transcript
OPERATING INSTRUCTIONS www.industrial-needs.com 3 Putting Viscometer into Operation 3.1 Unpacking the Viscometer After receiving the Viscometer, proceed as follows: 3.2 Check the Viscometer packaging for possible transport damages If the packaging is damaged, contact the responsible transport before opening the packaging. After the equipment has been unpacked, check for any visible signs of damage and if any is found contact your supplier. Remove all the packaging items and transport safety, recyclable material should be disposed in the intended containers, the main reason. Delivery Content 7 Portable rotation viscometer PCE-RVI 3 Standard spindle set (R2-R7) Spindle guard Tools 4 x additional alkaline battery AA / LR6 (6V)