Download TracVision 4 Technical Manual
Transcript
Installation 2 Installation TracVision 4 is designed for simple installation and setup. Just follow these easy steps: Step Refer to Section... 1. Choose the hardware locations 2.1 2. Mount the Antenna Unit 2.2 3. Set the skew angle (Europe only) 2.2.1 4. Wire system components 2.3 5. Program the IRD (Europe only) 2.4 6. Install selected satellite pair 2.5.1 7. Load any user-selected satellites 2.5.2 8. Check out system 2.6 Materials and Equipment Required for Installation • Electric drill • 3 • Socket wrenches • Flat tip and Phillips screwdrivers • RG-6 (75 ohms) cable for a second RF signal cable (if necessary) • Crimp tool (LRC #L3011B or equivalent) • Light hammer; center punch; tape; scriber/pencil • Terminal lug crimping tool; wire strippers • A PC with terminal emulation software such as PROCOMM, Windows Terminal, or Windows 95/98 Hyperterminal ⁄8" (10 mm) drill bit and 3" (80 mm) hole saw 54-0150 Rev. F Table 2-1 Installation Process Plan the entire installation before proceeding! Take into account antenna unit placement, running cable distances between units, and accessibility to the equipment after installation. Cable lengths are detailed in Table 2-2. KVH recommends the use of RG-6 (75 ohms) cable for RF wiring. Use of non-RG-6 (75 ohms) cables will result in degraded performance. The KVH warranty does not cover degraded performance due to improper wiring. 2-1