Download Manual - Phase Matrix
Transcript
6/OPERATIONAL VERIFICATION TESTS TEST SETUP 1 PROCEDURE 1. Connect equipment as shown in Figure 6-1. FREQUENCY SYNTHESIZER 10 MHz IN 10 MHz OUT 585C/588C COUNTER BAND 0 INPUT OSCILLOSCOPE 50 Ω TERMINATION Figure 6-1. Band 0 Range and Sensitivity Test Setup (100 Hz to 10 MHz) 2. Set the 585C/588C counter to Band 0 and select resolution 2. 3. Set the output frequency from the synthesizer to 100 Hz. 4. Using the oscilloscope, set the output signal level from the synthesizer to 0.063 V p-p (–20 dBm). 5. Apply the 100 Hz signal to the counter, verify proper reading, and record the results. 6. Repeat steps 3, 4, and 5 at 1 kHz, 10 kHz, 100 kHz, 1 MHz, and 10 MHz. TEST SETUP 2 PROCEDURE 1. Connect equipment as shown in Figure 6-2. 585C/588C COUNTER SYNTHESIZED SWEEPER POWER METER BAND 0 INPUT POWER SENSOR Figure 6-2. Band 0 Range and Sensitivity Test Setup (100 MHz to 250 MHz) 2. Set the 585C/588C counter to Band 0 and select resolution 3. 3. Set the synthesized sweeper to 100 MHz. 4. Using the power meter, set the output signal level from the synthesized sweeper to –20 dBm. 5. Apply the 100 MHz signal to the 585C/588C counter, verify proper reading, and record the results. 6. Repeat steps 3, 4, and 5 at 200 MHz and 250 MHz. 6-3