Download User Manual - SharePoint

Transcript
Operating and installation instructions │ Pro Thermetic │ Tilting boiling pan PBOT-E
4.5
ACCESS TO THE INSIDE OF THE APPLIANCE
4.5.1
Removing the panel front (F):
-
Remove the screws (S1) on the bottom of the panel front (F).
Pull on the underside to remove the control panel (F) and pull it downwards and out of the track.
4.5.2
Removing the panel cover (A/B):
-
Remove each of the two M5 nuts (M1) [located on the inside of the panel] for each panel cover (A/B).
Lift off the panel covers (A / B).
4.5.3
Removing the service cover (V):
-
Remove the service covers (V) by removing the screws (S3).
4.5.4
Removing the side walls (S):
-
First remove the control panels (F) and panel covers (A+B).
Remove the side walls (S) by removing the four M4 nuts (M2)
[located inside the panel].
4.5.5
Removing protective coverings (SA):
-
The installation connections (e.g. for electricity and water) are located under the protective coverings (SA)
(when wall-mounted).
Remove the protective coverings (SA) by removing the screws (SS).
4.5.6
Refitting all covers
-
This is done in reverse order to removing.
B
M2
M2
A
S
M2
F
S1
M2
S
F
S1
M1
M1
V
S3
SS
V
EN │ 10-2012
87.8020.01
SA
21