Download 11890169 service

Transcript
Boom sections, installation
49
Grease the thrust washers, use the adhesitivity from the
grease and fix them on the inner side of the main frame.
V1014802
Fig. 70
Boom section 1, installation
50
Secure boom section 1 with two lift slings and lift into place
in the main frame. Drive the main pin in and secure with
locking screws.
51
Lower the boom till the upper supports for the slave cylinders are in line with the holes in the main frame. Attach the
slave cylinders and drive the pins in. Secure the pins with
locking screws.
V1014803
Fig. 71
V1014821
Fig. 72
31