Download Instruction Manual
Transcript
6.3 Cleaning the Optical System 1. Pull out the main plug! 2. Wait min. 20 minutes after the last operation to cool down the fixture. 3. Open the upper shell of the head casing by loosening the 4 Phillips screws. Two on the front side and 2 on the back side of the head. 4. Do the work as explained in the list above. 5. Before you put the YPOC COLOR Basic into operation close the casing, otherwise your retina can be hurt! Brilliant Blue Blue Red Blue Purple Jade Magenta Turquoise Italian Blue Pink Orange GLP German Light Production (V1.0) Canary 22