Download Instruction Manual

Transcript
6.3
Cleaning the Optical System
1. Pull out the main plug!
2. Wait min. 20 minutes after the last operation to cool down the fixture.
3. Open the upper shell of the head casing by loosening the 4 Phillips screws.
Two on the front side and 2 on the back side of the head.
4. Do the work as explained in the list above.
5. Before you put the YPOC COLOR Basic into operation close the casing,
otherwise your retina can be hurt!
Brilliant
Blue
Blue
Red
Blue
Purple
Jade
Magenta
Turquoise
Italian
Blue
Pink
Orange
GLP Š German Light Production
(V1.0)
Canary
22