Download Ver/Abrir
Transcript
109(4) 107(3) 203(3) 203(8) Cuadro 26. Presupuesto diseño MOPT (Carpeta asfaltica y TS-3) SUMARIO DE CANTIDADES DESCRIPCION UNIDAD CANTIDADES Precio Unitario TRABAJO A COSTO DE PORCENTAJE glo 5% SUMINISTRO EQUIPO MATERIALES Y MANO DE OBRA PARA MARCAR LA VIA Km 4.3 1,185.00 ₡ EXCAVACION NO CLASIFICADA m3 62002.385 ₡9,057.00 EXCAVACION DE PRESTAMO CASO 2 m3 18095.94 ₡11,016.00 Precio Total ¢ ₡88,872,376.31 ₡5,095.50 561,555,600.95 ₡ ₡199,344,875.04 1$=¢565,11 $157,265.62 $9.02 $993,710.25 $352,754.11 206(1) 206(3) EXCAVACION PARA ESTRUCTURAS RELLENO PARA FUNDACION m3 m3 591.2 24.4 ₡8,935.00 ₡11,946.00 ₡5,282,372.00 ₡291,482.40 $9,347.51 $515.80 204(1) 207(1) 304(3) 408(3) SUB BASE GRADUACION D CONFORMACION DE SUBRAZANTE CONSTRUIDA ANTERIORMENTE BASE DE AGREGADOS MEDIDOS EN SITIO GRADUACION B ASFATO EMULSIONADO PARA IMPRIMACION BASE GRANULAR PAVIMENTO BITUMINOSO EN CALIENTE AGREGADOS PARA TRATAMIENTO BITUMINOSO SUPERFICIAL TIPO TS-3 ASFALTO EMULSIONADO PARA TRATAMIENTO BITUMINOSO SUPERFICIAL TIPO TS-3 HORMIGON ESTRUTURAL CLASE A DE 225 KG/M2 HORMIGON ESTRUTURAL CLASE X DE 160 KG/M2 CORDON Y CUNETA DE HORMIGON DE CEMENTO PORTLAND 20 CM DE ALTURA TUBO DE HORMIGON REFORZADO CLASE III DE 0,80 m ∅ LIMPIEZA Y CONFORMACION DE CANALES ZAMPEADO REVESTIDO CUNETA REVESTIDA CON TOBA CEMENTO m3 Km m3 Lt 13046.5 0.6 10961 24250 5577.5 490 66348 24.76 22.12 650 305 19 385 7800 ₡15,912.00 ₡1,142,230.86 ₡25,459.00 ₡714.00 26,551.88 ₡ ₡20,704.00 ₡714.00 210,905.00 ₡ ₡206,611.00 ₡15,132.10 ₡114,380.00 ₡8,346.67 ₡26,516.21 ₡18,840.00 ₡207,595,908.00 ₡685,338.52 ₡279,056,099.00 ₡17,314,500.00 ₡148,093,110.70 ₡10,144,960.00 ₡47,372,472.00 ₡5,222,007.80 ₡4,570,235.32 ₡9,835,865.00 ₡34,885,900.00 ₡158,586.73 ₡10,208,740.85 ₡146,952,000.00 $367,354.87 $1,212.75 $493,808.46 $30,639.17 $262,060.68 $17,952.19 $83,828.76 $9,240.69 $8,087.34 $17,405.22 $61,732.94 $280.63 $18,065.05 $260,041.41 $0.00 $3,145,312.46 REGLON DE PAGO 403(1) 410(1) 410(3) 602A(1) 602A(6) 609(3) 603(21)3B 618(5) 619B(2) 622A(3) Ton m3 Lt m3 m3 ml m m m3 m TOTAL TIPO DE CAMBIO DEL 01/02/10 Página 56 ₡1,777,447,526.11 Diseño geométrico, de drenajes y pavimentos de la Ruta Cantonal 3-01-033