Download Notice - AstralPool

Transcript
This operation only applies to models fitted with
an electrolyser.
A more detailed installation guide is supplied
with the chamber.
Note: water flows in a single direction within the
chamber.
ELECTROLYSER (E)
OR EXTERNAL
CHLORINE PUMP
(PCL)*
ENGLISH
2.4 - Connecting the chamber
220V
50/60 Hz
4A max
4A-AM
pH- injection
(Selwatch T ype 3-04,
3-05, 3-06 and 3-07)
pipe 1
Earth
Thermalmagnetic
circuit
breaker
Water sampling
(Selwatch T ype 3-03,
3-04 and 3-05)
pipe 2
N
Flow detector
Single-phase
220V
The direction of flow is indicated by an arrow.
2.5 - Electrical connections
The electrical connection must be carried
out by a qualified electrician in conformity
with the NFC I5-100 (Edition 2002) standard.
See diagram opposite.
If using electrolysers other than Energys, or a chlorine meter pump :
-check if it is a class II device: there should be a
symbol on the device.
-if it is a class II device (
symbol, no earth): the
connection is identical to that for an Energys.
-if it is a class I device (no
symbol, presence
of earth wires): the equipotential bonding (earth
wire) must be connected directly between the
device’s box and the filtration box. The earth
cable must not pass via the Selwatch box.
SWITCH
2
1
4
3
6
5
CONTACTOR
Pump
2
1
4
3
6
5
14
13
A2
A1
CLOCK
M
.A
Manual
turn-on
18