Download NOTE - ECOLAB Engineering
Transcript
1. General Information This manual contains all the important information about the function, operation, setting as well as the troubleshooting and repair of the AQUANTA CONTROL II (Software Version = V2.00). NOTE The German sections of this manual constitute the ORIGINAL OPERATING MANUAL and take legal precedence. All other languages are translations of the ORIGINAL OPERATING MANUAL. The safety Notes and emphases must be observed at all times! The AQUANTA CONTROL II is a fully programmable measuring and control unit for detergent, additive and two rinse aid pumps. In software version V2.00 and above, an external switch can be used to switch between two detergent metering pumps, e.g. detergent 1 alkaline and detergent 2 acidic. The apparatus contains an operating data and alarm memory as well as an interface (RS485) for connecting to a PC. ) The apparatus is designed for use in commercial crate washers with automatic crate transport. In connection with the “AquantaGet“ (Version ≥ V2.00) PC software it is possible to transmit operating, alarm and configuration data with parameter settings. NOTE The visualization of operating states and measured values on a PC is possible in 1.1 Information on the unit designs connection with the “Lab View” (Version ≥ V2.00) PC visualization software. The unit is set to Aquanta Basic (OEM) on delivery. In conjunction with the PC software AquantaGet (version ≥V2.00), Aquanta Basic can only be used to read the configuration data. No other data transfers are possible. Unrestricted data transfer is only available with Aquanta Control. The only way to upgrade to Aquanta Control in conjunction with the PC software AquantaGet (version ≥ V2.00) is by changing the configuration of the basic settings. 1.2 Warranty Scope The manufacturer provides a warranty concerning operational safety, reliability, and capacity of the metering unit only if the following conditions apply: • Assembly, installation, connection, configuration, maintenance, and repair are carried out by authorized and trained service technicians. • The metering unit must be used in accordance with the instructions of the technical manual. • Only original spare parts are used for repairs. • Only use the approved ECOLAB products. The general warranty and service terms and conditions of the company ECOLAB Engineering GmbH are always applicable as well. 1.3 Transport Damages Do not install the equipment if transport damage is detected after unpacking the unit. 417101386_AquantaControl_II.doc - 51 - Rev. 4-2/10