Download Benutzerhandbuch
Transcript
INSTALLATION 3. Installation 3.1 Inspecting the shipment Keep the shipping cartons and the packaging material for the shipping company or the sales agency. If parts of the system were damaged during transport, please submit a transport damage claim to your supplier within 24 hours. Should you discover damage after accepting the equipment, please claim this as hidden damage. 3.2 Unpacking the UPS system CAUTION If the UPS system is unpackaged at low ambient temperatures, condensation may form on the outside and inside of the housing. Install the UPS system only when the inside and outside are completely dry (risk of an electric shock) The UPS system is heavy (see Technical Data). Use caution when unpacking and transporting the UPS system NOTE Move and open the packaged UPS system carefully. Leave the components in the packaging until these are installed. To unpack the housing and the accessories: 1. Open the outer carton, remove the accessory parts that are packaged with the UPS system. 2. Carefully lift the UPS system out of the outer carton. 3. Place the UPS system in a protected area that is sufficiently ventilated and free of moisture and flammable gases and corrosion. 84 / 222 XS700-XS3000_manual_ger_eng_it_V1.0.3.doc ........................................................... R. Kistler