Download User Guide - Cheminee Pty Ltd
Transcript
INSTALLATION Check the appliance is electrically safe and gas sound when you have finished. Gas Connection ��� ��� Must be in accordance with the relevant standards. The gas supply needs to terminate with a down facing bayonet. � Fig.7-14 ��� Because the height of the cooker can be adjusted and each connection is different it is difficult to give precise dimensions. The hose should be fitted so that both inlet and outlet connections are vertical so that the hose hangs downwards in a ‘U’ shape (Fig.7-14). ��� The connector is located just below the hotplate level at the rear of the cooker. A flexible connection is supplied with the cooker. If it is necessary to use another hose it must be to A.S. 1869 class B and be suitable for your gas type. If in doubt contact your supplier. Screw connect the threaded end of the hose into the gas inlet. ArtNo.090-0027 - 90 Elan gas connections After completing the gas connection, check the cooker is gas sound with a pressure test. A - Position of gas supply connector, B - Appliance gas inlet Pressure Testing The pressure test point is accessible on the inlet pipe at the rear. Remove the test nipple screw and fit a pressure gauge to the test point. Turn on and light two of the hotplate burners. For Natural Gas cookers the pressure should be 1kPa. For Propane X cookers the pressure should be 2.54kPa. Electrical Connection This appliance must be installed by a qualified electrician to comply with the relevant regulations (AS/NZS 60335.2.6:2002) and also the local electricity supply company requirements. Ensure that the mains characteristics (voltage, nominal, power, etc.) match the ratings indicated on the data plate affixed to the cooker. The cooker is preset for a single-phase earthed electrical connection. It is essential to install a multi-pole circuit breaker that completely disconnects the appliance from the mains, with a minimum contact break distance of 3mm. WARNING: THIS APPLIANCE MUST BE EARTHED The appliance must be connected to an efficient earthing circuit. If the electricity network is not equipped with an earth connection, then it must be installed separately in compliance with local regulations. Earthing is a safety measure required by law, and must be performed with particular care by a qualified technician, who must also check that the electricity supply characteristics are correct. 27