Download OPERATING INSTRUCTIONS FOR "LOTUS EASY" SYSTEM

Transcript
REACTOR PRIMING
Within main screen press the wheel and enter ADMINISTRATOR password. Select “REACTOR PRMING”. Confirm
changes by moving cursor to “OK” and pressing the wheel.
This function allows to test “Acid” and “Chlorite” dosing pumps while filling main reactor. Set seconds required based
on pumps capacity and reactor tank size. Press start to begin procedure and STOP when reactor is full (liquid within
hose connected to injection valve). If not press STOP and increase seconds to fully accomplish reactor priming.
23