Download Installation Manual. Ingecon Sun String Control
Transcript
Installation manual Ingeteam Energy, S.A. CAUTION Remember that the installation company should considered qualified workers to be those who at least meet with the requirements of Royal Decree 614/2001 for electrical work. CAUTION The unit must be voltage-free prior to any handling. As a minimum security measure in this operation, the so-called five golden rules should always be followed: 1. Disconnect. 2. Prevent any possible resupply. 3. Check there is no voltage. 4. Ground and short circuit 5. Protect from live elements, if any, and put up safety signs around the work zone. CAUTION Category III - 1000-Volt measuring instruments must be used. CAUTION Ingeteam Energy, S.A. is not liable for any damages caused by improper use of its equipment. 1.3. Task Description The work that qualified personnel can carry out on this model are as follows: • Inspection: Involves opening the enclosure for visual inspection tasks. • Control: Tasks such as loading software, checking the air cooling systems and corrective maintenance on the equipment, not including electrical panels, carried out via the display and man-machine interface. • Handling: Tasks involving the assembly and/or replacement of parts and configuring the protection system. The following warnings should be born in mind in any Inspection, Control and Handling task: CAUTION Ingecon® Sun String Control equipment can only be opened by qualified personnel for installation, commissioning and maintenance tasks. CAUTION There is serious risk of electric shock even after disconnecting the unit from the inverter and the solar panels. Wait 10 minutes to allow internal capacitances to discharge after disconnecting panels and inverter. AAS2002IKI01 5