STEP 17 Install Permanent Guard Following completion of platform boards ascend to lift and install permanent rails as steps 12 to 15. Either remove Fast Guard couplers to transport bag or raise the temporary rail for use in next lift (Step 13). STEP 18 Complete lift STEP 19 Store Couplers On completion of the scaffold remove all FAST GUARD couplers and using the transport bag store safely ready for use at the next job. NOTE: When not in use, ALWAYS store couplers with cradle locks in ’Tube Slide’ position. This will ensure continued correct operation of the coupler cradle. TIP When not in use, ALWAYS store couplers with cradle locks in ’Tube Slide’ position. This will ensure continued correct operation of the coupler cradle. 27