Download OPERATING INSTRUCTIONS
Transcript
OPERATING INSTRUCTIONS Corrosion Testing System S 400 M-SC S 1000 M-SC S 2000 M-SC Type No. 4401 6101 Type No. 4501 7101 Type No. 4601 7101 FN: Gebr. Liebisch GmbH & Co. KG Postfach 14 06 06 D-33626 Bielefeld Eisenstraße 34 D-33649 Bielefeld Telefon +49 / 521 / 9 46 47-0 Fax +49 / 521 / 9 46 47-90 [email protected] www.liebisch.de Conformitation Gebr. Liebisch GmbH & Co. KG declares under sole responsibility that the testing unit S 1000 M-SC (FN-No xxxxxx) is in conformity with the Council Directives on the approximation of the laws of the EEC member states relating to: l l l Electromagnetic compatibility 89/336/EWG Electrical equipment designed for use within certain voltage limits 2006/95/EG Pressure equipment directive 97/23/EG ____________________________________________________________________________________________ Gebr. Liebisch GmbH & Co. KG - P.O. Box 140606 - D-33626 Bielefeld - Fon +49 (0)521 9 46 47-0 Fax +49 (0)521 9 46 47-90 - E-Mail: [email protected] - www.liebisch.com -1Contents Contents General remarks General view S 400 M-SC / S 1000 M-SC General view S 2000 M-SC 1 2 3 4 1. 1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8 Safety Safety instructions and advice Instrument safety Use as prescribed Hazards associated with accessories Approved operators Safety measures at the point of installation Protective equipment Conduct in the event of an emergency 5 5 5 5 6 6 6 7 7 2. 2.1 2.2 2.3 Transport / Installation Technical data S 400/1000/2000 M-SC (Table 2) Transport/Storage Installing and connecting the instrument 2.3.1 Demands expected of the installation room 2.3.2 Installing and levelling the diagnostic instrument 2.3.3 Electrical safety 8 8 9 9 9 10 12 3. 3.1 3.2 3.3 Operation Key to the control panel (left side) fig, 6 Key to the control panel (right side) fig, 7 Test preparation 3.3.1 General test preparation 13 13 14 15 15 4. 4.1 4.2 4.3 Testing methods Saline mist tests with cont. atomization Saline mist tests with periodic atomization Testing cabinet with cycle counter / test duration (opt.) 15 15 19 23 5. 5.1 5.2 5.3 5.4 5.5 5.6 Care and maintenance Maintenance plan Cleaning the testing chamber Checking the condition of the silicone seal Checking the door seal for tightness Checking the performance of the vacuum valve Check the quick-action couplings for tightness 25 25 25 25 25 26 26 6. ANNEX Annex: Survey of the pictographs Annex: Spare parts list Annex: Functional diagram Annex: Chest dimensions Annex: Options / Main circuits 25 25 27 32 33 36 ____________________________________________________________________________________________ Gebr. Liebisch GmbH & Co. KG - P.O. Box 140606 - D-33626 Bielefeld - Fon +49 (0)521 9 46 47-0 Fax +49 (0)521 9 46 47-90 - E-Mail: [email protected] - www.liebisch.com -2- General Remarks This series of corrosion diagnostic instruments was specifically developed for saline mist test according to DIN EN ISO 9227 or ASTM B117. Instrument type Standard S 400 M-SC DIN EN ISO 9227 (formerly DIN 50021), ASTM B117 S 1000 M-SC DIN EN ISO 9227 (formerly DIN 50021), ASTM B117 S 2000 M-SC DIN EN ISO 9227 (formerly DIN 50021), ASTM B117 Table 1: Examples for corresponding standards For details please check the corresponding standards. Please study these Operating Instructions carefully before setting up and operating the instrument! Knowledge of the relevant chapters of these Operating Instructions is an imperative precondition for the operator to ensure the safe operation of the corrosion diagnostic instrument in keeping with its intended purpose. Operators are duty bound to familiarise themselves with the safety instructions and operating conditions in order to avoid injury and damage. All liability and guarantee claims become null and void if the instrument is damaged as a result of incorrect operation and/or if it was not used in keeping with its intended purpose. All maintenance and repairs must be completed by personnel of Gebr. Liebisch GmbH & Co. KG or specialists authorised by Liebisch. This information is based on our current standards of knowledge. The operator is responsible for the observation of the pertinent statutory rules and regulations. The illustrated instruments and details may be equipped with optional accessories. Subject to technical alterations. ____________________________________________________________________________________________ Gebr. Liebisch GmbH & Co. KG - P.O. Box 140606 - D-33626 Bielefeld - Fon +49 (0)521 9 46 47-0 Fax +49 (0)521 9 46 47-90 - E-Mail: [email protected] - www.liebisch.com -3- Exhaust-air connection (d 50) Mains plug Cap/compressed air Control/ Panel/compressed air Flow measuring and control unit (optional) Glass door of testing chamber Door lock NaCl socket Control panel left Deionized water socket Steering castor Adjustable foot Adjustable foot Additional NaCl supply (optional) Deionized water connection Steering castors Adjustable foot Condensate drain d 32 Fig. 1: General view of S 400 M-SC/ S1000 M-SC ____________________________________________________________________________________________ Gebr. Liebisch GmbH & Co. KG - P.O. Box 140606 - D-33626 Bielefeld - Fon +49 (0)521 9 46 47-0 Fax +49 (0)521 9 46 47-90 - E-Mail: [email protected] - www.liebisch.com -4- Mist outlet connection Mains plug Cap/ Compressed air Flow measuring and control device (optional) NaCl socket Adjustable foot Adjustable foot steering castors Deionized water socket Adjustable foot Additional NaCl supply (optional) Deionized water connection Control panel Compressed air Control panel left Steering castor Steering castor Adjustable foot Glass door of testing chamber Condensate drain (d 32) Steering castor Adjustable foot Fig. 2: General view of S 2000 M-SC ____________________________________________________________________________________________ Gebr. Liebisch GmbH & Co. KG - P.O. Box 140606 - D-33626 Bielefeld - Fon +49 (0)521 9 46 47-0 Fax +49 (0)521 9 46 47-90 - E-Mail: [email protected] - www.liebisch.com -5- 1 SAFETY 1.1 Safety instructions and advice The following symbols are used in these Operating Instructions: DANGER! Indicates an imminent hazard. Non-observation of the warning can result in death or severe injury! IMPORTANT! Draws attention to important operating and application instructions and other useful information. 1.2 Instrument safety The instruments feature electrical and mechanical safety devices. They were subjected to a strict safety and acceptance test. Incorrect operation or use can l threaten life and limb of the operator, l damage the instrument and the operator's property, and l diminish the instrument's operating efficiency. All persons concerned with the installation, commissioning, operation, maintenance and repair of the instrument must be l correspondingly qualified, and l be familiar with these Operating Instructions. Human safety is at stake! 1.3 Use as prescribed The instruments are intended exclusively for the performance of saline mist tests (e.g. DIN EN ISO 9227, ASTM B 117). The instruments were specifically developed for this purpose and must not be operated in a manner in which they were not intended to be used! Never drop heavy test specimens in the testing chamber as this can damage the base plate. ____________________________________________________________________________________________ Gebr. Liebisch GmbH & Co. KG - P.O. Box 140606 - D-33626 Bielefeld - Fon +49 (0)521 9 46 47-0 Fax +49 (0)521 9 46 47-90 - E-Mail: [email protected] - www.liebisch.com -6Do not allow the test specimens to knock against the inside walls of the instrument as this can damage the walls. Unauthorised instrument conversions and changes are prohibited for safety reasons. IMPORTANT! The operating, maintenance and repair conditions prescribed in these Operating Instructions must be strictly observed. 1.4 Hazards resulting from the accessories Peripheral units must not nullify the safety devices of the test instrument. 1.5 Approved operators l l l l Only experts or instructed persons are allowed to operate these instruments. The minimum age of operators is 18. The operator is responsible for third parties within the working area. The areas of responsibility for the different activities in connection with the instrument must be clearly defined and observed. Ambiguous areas of competence are a safety risk! The owner must l Make these Operating Instructions accessible to the operator; l Check that operators have read and understood these Operating Instructions. 1.6 Safety measures at the point of installation Install the test instrument in its own room. Any saline mist that may be emitted as a result of incorrect operation can result in corrosion damage in the area around the instrument. ____________________________________________________________________________________________ Gebr. Liebisch GmbH & Co. KG - P.O. Box 140606 - D-33626 Bielefeld - Fon +49 (0)521 9 46 47-0 Fax +49 (0)521 9 46 47-90 - E-Mail: [email protected] - www.liebisch.com -7The installation room must have a drain in the floor near the instrument. To ensure complete stability, the instrument must be set up on a level and firm base. An instrument that topples over is hazardous to life! IMPORTANT! Corresponding in-house instructions and checks must ensure that the area around the workplace is always clear and uncluttered. 1.7 Protective equipment The instruments are fitted with the following safety devices: l Lockable test room door l Electromechanical overtemperature protection for the test room l Electromechanical overtemperature protection for the humidifier l Mechanical overpressure valve for the humidifier l Mechanical overpressure valve in the compressed-air line l Main switch with thermal overcurrent protection The safety devices: l Have been installed for the safety of the operating personnel and to protect the surrounding area. l Must, under no circumstances, be changed or removed, nor must they be bypassed as a result of changes to the instrument. Consult the Maintenance Plan in the Care and Maintenance chapter to check the safety devices. IMPORTANT! Attention is drawn to the possible existence of additional statutory requirements of national institutions responsible for the health and safety of the operating personnel. 1.8 Conduct in the event of an emergency In an emergency immediately turn the main switch to the O setting and disconnect the mains plug. ____________________________________________________________________________________________ Gebr. Liebisch GmbH & Co. KG - P.O. Box 140606 - D-33626 Bielefeld - Fon +49 (0)521 9 46 47-0 Fax +49 (0)521 9 46 47-90 - E-Mail: [email protected] - www.liebisch.com -8- 2 Transport/ Installation 2.1 Technical data Instrument type Article number Weight Cabinet dimensions outside (w x d x h) [mm] Inside dimensions test room (w x d x h) [mm] Door opening (w x d x h) [mm] S 400 M-SC S 1000 M-SC S 2000 M-SC 4401 6101 4501 7101 4601 7101 appr. 380 kg appr. 400 kg appr. 750 kg 1550 x 860 x 2100 1780 x 1080 x 2140 2920 x 1150 x 2190 680 x 550 950 x 850 x 1065 (1350) 887 x 875 2100 x 810 x 1060 (1300) 1995 x 875 60 kg 120 kg 240 kg 12 pc. à 5 kg 12 pc. à 10 kg 24 pc. à 10 kg appr. 400 appr. 1.000 appr. 2.000 AC 230 V +6/-10% AC 400 V +6/-10% AC 400 V +6/-10% 2600 W 3400 W 4400 W Control range test room SAL up to 50°C up to 50°C up to 50°C Control range humidifier SAL up to 70°C up to 70°C up to 70°C 50/60 Hz 50/60 Hz 50/60 Hz Fuse in main switch 12 A 8A 12 A Temperature control el. PID el. PID el. PID Interface temp. controller option option option yes yes yes yes yes yes Max. loading test room Number and loading of sample holders Volume test room [litre] Operating voltage Connected load SAL Frequency Overtemperature protection for test room Overtemperature protection for humidifier 705 x 720 x 730 Operating resources Pressure demin. water Water quality Supply test solution Consumption demin. water humidifier Consumption demin. water humidifier. 2,5-3,0 bar 2,5-3,0 bar 2,5-3,0 bar conf. to standard conf. to standard conf. to standard 100 litre 300 litre 100 litre appr. 0,4-0,8 litre appr. 80-120 ml/hr 3 appr. 0,4-0,8 litre appr. 80-120 ml/hr 3 appr. 1-1,4 litre appr. 80-120 ml/hr 3 Consumption compr. air / hr. appr. 2,5 m /hr appr. 2,5 m /hr appr. 2,5 m /hr Compressed air connection 3-4 bar 3-4 bar 3-4 bar Disposal Exhaust -air hose d50 mm (hose) d50 mm (hose) d75 mm (hose) Condensate draining hose d32 mm (hose) d63 mm (hose) d63 mm (hose) Table 2: Technical data ____________________________________________________________________________________________ Gebr. Liebisch GmbH & Co. KG - P.O. Box 140606 - D-33626 Bielefeld - Fon +49 (0)521 9 46 47-0 Fax +49 (0)521 9 46 47-90 - E-Mail: [email protected] - www.liebisch.com -92.2 Transport/Storage The corrosion diagnostic instrument is delivered in a transport crate of corresponding size. If the instrument is to be transported with a fork-lift truck, then the fork must carry the instrument on at least two opposing points of the instrument base. The fork of the truck must at least 1000 mm long. The following points must be observed for the storage/transportation of the instrument: l Use a dry room for temporary instrument storage. l Use an adequately strong packaging/transport container for dispatch. l Prior to dispatch clean the instrument to remove all harmful substances and residues. 2.3 Installing and connecting the instrument 2.3.1 Demands expected of the installation room l l l l l l The instrument must be placed and practiced at room temperature (ambient temperature +18°C to +28°C) in a room without corrosive atmosphere. There must be a drain in the floor of the installation room. Take information about the diameter of the tap water hose from table 2, page 8. There must be a clean atmosphere in the installation room. The instrument must be protected from wide and rapid temperature fluctuations, direct exposure to the sun and draughts. This could influence the instrument's temperature control systems. The instrument should be set up in its own room that can be permanently ventilated. The instrument's compressed-air humidifier must be continuously supplied with demineralized water. The instrument is fitted with a connection for demineralized water. ____________________________________________________________________________________________ Gebr. Liebisch GmbH & Co. KG - P.O. Box 140606 - D-33626 Bielefeld - Fon +49 (0)521 9 46 47-0 Fax +49 (0)521 9 46 47-90 - E-Mail: [email protected] - www.liebisch.com -10· The necessary pressure for the alimentation for the humidifier system is approx. 2.5-3.0 bar (pressure of water). · The exhaust-air hose (maximum length 5 m) must be conducted free of counter-pressure to the outside or to the vicinity of a suitable extractor. Technical details must be explained individual for each customer, it isn’t possible to inform about it generally. Take information about the diameter of the exhaust-air hose from table 2, page 8. WARNING! The exhaust air of the instrument can promote corrosion. 2.3.2 Installing and levelling the diagnostic instrument IMPORTANT! The diagnostic instrument must be installed absolutely level to ensure proper performance. Position the instrument at its point of installation. Use a spirit level for this purpose, and observe the reference points indicated in fig. 3 and fig. 4 . IMPORTANT! Tooling requirements have resulted in instrument housing conicity so that only the indicated reference points (side and front) (see fig. 3/4) must be used for levelling. Reference point (front) Reference point (side) Fig. 3: Reference points for the spirit level 400/1000 M-SC ____________________________________________________________________________________________ Gebr. Liebisch GmbH & Co. KG - P.O. Box 140606 - D-33626 Bielefeld - Fon +49 (0)521 9 46 47-0 Fax +49 (0)521 9 46 47-90 - E-Mail: [email protected] - www.liebisch.com -11- Reference point (front) Reference point (side) Fig. 4: Reference points for the spirit level 2000 M-SC Adjust the feet as follows: Use a suitable screwdriver, push it through the bore hole and turn the threaded pin to the left or right (see fig. 5). Carefully level the instrument. Bore hole for threaded pin Threaded pin Adjustable foot Fig. 5 Adjustable foot ____________________________________________________________________________________________ Gebr. Liebisch GmbH & Co. KG - P.O. Box 140606 - D-33626 Bielefeld - Fon +49 (0)521 9 46 47-0 Fax +49 (0)521 9 46 47-90 - E-Mail: [email protected] - www.liebisch.com -12Establish the connection with the compressed-air supply. The compressed-air line installed by the customer is linked with the instrument's plug-in connection for compressed air (fig. 1/2, page 3/4). Compressed-air requirements: min. 3.0 bar; max. 4.0 bar Use only oil- and water-free compressed air! You can get a compressed air cleaning device as an option. Install the exhaust-air hose and conduct it in such a manner that it is free of counter-pressure. The liquid subsequently precipitating in this hose must be able to flow back freely. It is essential to prevent points of water accumulation and hose loops! Install the condensate draining hose and conduct it in such a manner that it is free of counter-pressure. It is essential to prevent points of water accumulation and hose loops! 2.3.3 Electrical safety Set up the instrument in the vicinity of an electrical connection. The instrument must only be electrically connected by a qualified electrician. The instrument's operating voltage must conform with the mains voltage. For maximum electrical safety it is advisable to install a residual current protection circuit with a tripping current of 30 mA. Establish the electrical connection, but do NOT switch on the instrument. First read the entire Operating Instructions! ____________________________________________________________________________________________ Gebr. Liebisch GmbH & Co. KG - P.O. Box 140606 - D-33626 Bielefeld - Fon +49 (0)521 9 46 47-0 Fax +49 (0)521 9 46 47-90 - E-Mail: [email protected] - www.liebisch.com -13- 3 Operation Have these Operating Instructions, particularly Chapter 1, been read and clearly understood? The instrument must not be operated beforehand! 3.1 Key to the control panel (left side) Main switch Interior light switch (optional) Fault check lights Selector switch spraying / ventilation Heater temperature control test chamber Selector switch cont. / period. Spraying (optional) Heater temperature control humidifier Check lights heating systems Dosing pump test solution (optional) Check lights level control supply tank Fault light dosing pump Selector switch nozzle cleaning / wall cleaning (optional) Timer test duration / periodic operating mode (optional) Key switch timer Fig. 6: Control panel (left-hand side) ____________________________________________________________________________________________ Gebr. Liebisch GmbH & Co. KG - P.O. Box 140606 - D-33626 Bielefeld - Fon +49 (0)521 9 46 47-0 Fax +49 (0)521 9 46 47-90 - E-Mail: [email protected] - www.liebisch.com -143.2 Key to the control panel elements (right-hand side) Changeover switch Humidifier pressure/Nozzle pressure Pressure gauge Compressed air Pressure controller Flow measuring and control unit (optional) Filling opening for test solution Fig. 7: Control panel (right-hand side) ____________________________________________________________________________________________ Gebr. Liebisch GmbH & Co. KG - P.O. Box 140606 - D-33626 Bielefeld - Fon +49 (0)521 9 46 47-0 Fax +49 (0)521 9 46 47-90 - E-Mail: [email protected] - www.liebisch.com -153.3 Test preparations 3.3.1 General test preparations l Open the testing chamber door. l Place the part that is to be tested in the testing chamber. IMPORTANT! Do not place the test specimen on the floor of the testing chamber. l Lock the testing chamber door. l Fill the NaCl supply tank with NaCl test solution (e.g. acc. to DIN EN ISO 9227). l Use the drum pump supplied with the instrument. l Open the filling opening for the test solution on the right-hand control panel and connect the filling hose of the pump to the filling connection. l Fill the depot completely and observe the filling-level indicator for the depot test solution on the left-hand control panel. l Remove the pump and close the connection. 4 Testing methods 4.1 Saline mist with continuous atomization (e.g. DIN EN ISO 9227) l Switch on the testing cabinet by actuating the main switch (fig. 6). The green pilot light integrated in the main switch lights up. The temperature controllers become activated and complete a self-test. l Setting the temperature controller: Termination of the self-test is followed by the presentation of the standard display of the normal operating mode. The temperature controller for Heating/Testing chamber SAL controls the temperature prevailing in the testing chamber during the saline mist testing process. The temperature controller for Heating/Humidifier controls the compressed-air humidifier temperature during the saline mist testing process. ____________________________________________________________________________________________ Gebr. Liebisch GmbH & Co. KG - P.O. Box 140606 - D-33626 Bielefeld - Fon +49 (0)521 9 46 47-0 Fax +49 (0)521 9 46 47-90 - E-Mail: [email protected] - www.liebisch.com -16Indication of output states GEFRAN Out1 Out2 600 Out3 Out4 Actual value display PV Function indicators L1 L2 L3 Setpoint display SV F Autom. / manual adjustment selection Function key Setpoint setting 'Down' Setpoint setting 'Up' Fig. 8: Controller Important! The temperature controller has been configured and parameterised by the manufacturer. Use of the functional key is not necessary for operation. Only use the UP and DOWN arrow keys for setpoint entry for the controller. Important! Do not actuate the UP and DOWN keys simultaneously. Increase the setpoint (arrow key 'UP'). Diminish the setpoint (arrow key 'DOWN'). The testing cabinet is usually operated at a chamber temperature of 35°C/50°C (e.g. DIN EN ISO 9227 /ASTM B117). Setpoint entry of the testing chamber temperature control is limited to maximum 50°C and minimum 0°C. Setpoint entry of the compressed-air humidifier temperature control is limited to maximum 80°C and minimum 0°C. The temperature controller features a PID system. His systemconditional control behaviour guarantees accurate control of the testing chamber temperature and prevents excessive overshoot of the testing ____________________________________________________________________________________________ Gebr. Liebisch GmbH & Co. KG - P.O. Box 140606 - D-33626 Bielefeld - Fon +49 (0)521 9 46 47-0 Fax +49 (0)521 9 46 47-90 - E-Mail: [email protected] - www.liebisch.com -17chamber temperature during the heating-up phase. The set testing chamber temperature is reached after approximately 1 hour. l l l l l l Set the atomizing changeover switch 'Continuous/Ventilation' to the 'Continuous' position. Set the changeover switch 'Periodic/Continuous Operating Mode' to the 'Continuous' position (optional equipment). Set the selector switch 'Pressure' (fig. 7) to the 'Nozzle' position (e.g. acc. table of DIN EN ISO 9227 standard). Recommended mean value: approx 1 bar. Return the selector switch 'Pressure' to the 'humidifier' position. The pressure gauge now indicates the humidifier input pressure. The air distributor in the compressed-air humidifier tank must be changed (after approx. 5,000 operating hours) when the pressure difference between the switch positions 'Humidifier' and 'Nozzle' rises to values 1 bar. Set the atomizing volume per hour on the control valve of the flow measuring and control module. Spraying process: The testing cabinet is equipped with a self-priming 2-substance nozzle operating according to the injection principle. The test solution is sucked in through the hose that is connected with the nozzle. The compressed air and test solution expand as they are emitted by the nozzle cap. The capacity and efficacy of the nozzle, and the characteristics of the spraying cone, can be influenced by adjusting the nozzle cap accordingly. The suction action is regulated and the required liquid-air mixture adjusted, by this measure and by setting the air pressure and flow rate (observe the needle valve of the flow measuring and controlling module). Increasing the pressure raises the atomizer capacity and the fineness of atomization. Flow measuring and control unit (optional): This accessory module consists of a flow meter operating according to the float principle in combination with a needle dosing valve. ____________________________________________________________________________________________ Gebr. Liebisch GmbH & Co. KG - P.O. Box 140606 - D-33626 Bielefeld - Fon +49 (0)521 9 46 47-0 Fax +49 (0)521 9 46 47-90 - E-Mail: [email protected] - www.liebisch.com -18Spraying solution consumption can be optimally regulated, dosed and controlled with the help of this module is integrated in the suction line for spraying solution and located on the right panel of the testing cabinet. With testing cabinets featuring this special facility, nozzle efficacy is adjusted only once and then checked for optimal performance. Additional or diminished spraying solution consumption then only has to be controlled by actuating the needle valve. Additional or diminished consumption can also be controlled by varying the air pressure. Setting the nozzle (with flow measuring and control module): The nozzle will be adjusted during continuous atomization. Adjust the "changeover switch humidifier pressure/nozzle pressure" into the position nozzle. a) Actuate the pressure controller and set the air pressure to approx. 1.0 bar (nozzle advance pressure). b) Open the needle valve of the flow measuring and control module. c) Release the locking ring of the nozzle by turning it anti-clockwise. d) Turn the nozzle cap to the left or right and observe the flow measuring and control module. e) The measure specified in c) has an immediate effect on the behaviour of the float. f) A rising tendency of the float indicates that the optimal flow rate is being approached. g) Turn the locking ring clockwise to fix the nozzle cap as soon as the highest flow rate is indicated. h) Set a flow rate of approx. 500 ml/h (test chamber volume 400l) on the needle valve. For a test chamber volume of 1000l the value should be approx. 500-700ml/h, and at 2000 litre chambers approx. 800-1000ml/h. To get the same results referring the volume of accumulated test solution the volume of sprayed test solution must increase by using larger test chambers. Indication: Request individual information to adjust the nozzle without flow measuring and control module. ____________________________________________________________________________________________ Gebr. Liebisch GmbH & Co. KG - P.O. Box 140606 - D-33626 Bielefeld - Fon +49 (0)521 9 46 47-0 Fax +49 (0)521 9 46 47-90 - E-Mail: [email protected] - www.liebisch.com -19Test interruption/Shutting down: Turn the selector switch ‘atomization/ventilation' to the 'ventilation' position before interrupting the test or before the end of the test. Compressed air now blows out the remaining mist in the chamber via the mist output line (takes approx. 10 minutes). Return the selector switch ‘atomization/ventilation' to 0. The you can open the door. 4.2 Salt mist tests with periodic atomization (e.g. DIN 50907) (optional feature) Switch on the testing cabinet by actuating the main switch (fig. 6). The green pilot lamp integrated in the main switch lights up. This activates the temperature controllers which perform a self-test. Setting the temperature controller: l Termination of the self-test is followed by the presentation of the l standard display of the normal operating mode. l The temperature controller for Heating/Testing chamber SAL controls the temperature prevailing in the testing chamber during the saline mist testing process e.g. acc. to DIN 50907. l The temperature controller for Heating/Humidifier is not required. l Indication of output states GEFRAN Out1 Out2 600 Out3 Out4 Actual value display PV Function indicators L1 L2 L3 Setpoint display SV F Autom. / manual adjustment selection Function key Setpoint setting 'Down' Setpoint setting 'Up' Fig. 9: Controller ____________________________________________________________________________________________ Gebr. Liebisch GmbH & Co. KG - P.O. Box 140606 - D-33626 Bielefeld - Fon +49 (0)521 9 46 47-0 Fax +49 (0)521 9 46 47-90 - E-Mail: [email protected] - www.liebisch.com -20Important! The temperature controller has been configured and parameterised by the manufacturer. Use of the functional key is not necessary for operation. Only use the UP and DOWN arrow keys for setpoint entry for the controller. Important! Do not actuate the UP and DOWN keys simultaneously. Increase the setpoint (arrow key 'UP'). Diminish the setpoint (arrow key 'DOWN'). The testing cabinet is usually operated at a chamber temperature of 35°C / 50°C (e.g. DIN 50907). Setpoint entry of the test compartment temperature control is limited to maximum 50°C and minimum 0°C. The temperature controller features a PID system. This system-conditional control behaviour guarantees accurate control of the testing chamber temperature and prevents excessive overshoot of the testing chamber temperature during the heating-up phase. The set testing chamber temperature is reached after approximately 1 hour. l l l Set the atomizing changeover switch 'atomization/ventilation' to the 'atomization' position. Set the changeover switch 'continuous/periodic’ Operating Mode to the 'periodic' position. The periodic operating mode timer (see fig.10) is activated and performs a brief self-test. The timer features 2 programmable outputs: Output 1 = atomizing Output 2 = pause (no atomizing) Display output 1 = No flashing dot behind the last display digit of the display. Display output 2 = Flashing dot behind the last display digit of the display. ____________________________________________________________________________________________ Gebr. Liebisch GmbH & Co. KG - P.O. Box 140606 - D-33626 Bielefeld - Fon +49 (0)521 9 46 47-0 Fax +49 (0)521 9 46 47-90 - E-Mail: [email protected] - www.liebisch.com -21The times are set with the arrow keys, e.g.: Output 1 = 5 min. atomizing Output 2 = 55 min. pause actual-value display LED display Input 1 setpoint display LED-Display Input 2 Relay output display Setpoint setting UP Setpoint setting DOWN functional key Fig. 10: Timer for periodic operation (optional) Set the selector switch 'Pressure' (fig. 7) to the 'Humidifier' position (e.g. acc. table of DIN EN ISO 9227 standard). Recommended mean value: approx. 1 bar. Set the atomizer volume per hour on the control valve of the flow measuring and controlling module. Spraying process: The testing cabinet is equipped with a self-priming 2-substance nozzle operating according to the injection principle. The test solution is sucked in through the hose that is connected with the nozzle. The compressed air and test solution expand as they are emitted by the nozzle cap. ____________________________________________________________________________________________ Gebr. Liebisch GmbH & Co. KG - P.O. Box 140606 - D-33626 Bielefeld - Fon +49 (0)521 9 46 47-0 Fax +49 (0)521 9 46 47-90 - E-Mail: [email protected] - www.liebisch.com -22The capacity and efficacy of the nozzle, and the characteristics of the spraying cone, can be influenced by adjusting the nozzle cap accordingly. The suction action is regulated and the required liquid-air mixture adjusted, by this measure and by setting the air pressure and flow rate (observe the needle valve of the flow measuring and control unit). Increasing the pressure raises the atomizer capacity and the fineness of atomization. Flow measuring and controlling module (optional): This accessory module consists of a flow meter operating according to the float principle in combination with a needle dosing valve. Spraying solution consumption can be optimally regulated, dosed and controlled with the help of this module is integrated in the suction line for spraying solution and located on the right panel of the testing cabinet. With testing cabinets featuring this special facility, nozzle efficacy is adjusted only once and then checked for optimal performance. Additional or diminished spraying solution consumption then only has to be controlled by actuating the needle valve. Additional or diminished consumption can also be controlled by varying the air pressure. Setting the nozzle (with flow measuring and control module): The nozzle will be adjusted during continuous atomization. Adjust the "changeover switch humidifier pressure/nozzle pressure" into the position nozzle. a) Actuate the pressure controller and set the air pressure to approx. 1.0 bar (nozzle advance pressure). b) Open the needle valve of the flow measuring and control module. c) Release the locking ring of the nozzle by turning it anticlockwise. d) Turn the nozzle cap to the left or right and observe the flow measuring and control module. e) The measure specified in c) has an immediate effect on the behaviour of the float. ____________________________________________________________________________________________ Gebr. Liebisch GmbH & Co. KG - P.O. Box 140606 - D-33626 Bielefeld - Fon +49 (0)521 9 46 47-0 Fax +49 (0)521 9 46 47-90 - E-Mail: [email protected] - www.liebisch.com -23f) A rising tendency of the float indicates that the optimal flow rate is being approached. g) Turn the locking ring clockwise to fix the nozzle cap as soon as the highest flow rate is indicated. h) Set a flow rate of approx. 500 ml/h (test chamber volume 400l) on the needle valve. For a test chamber volume of 1000l the value should be approx. 500-700ml/h, and at 2000 litre chambers approx. 800-1000ml/h. To get the same results referring the volume of accumulated test solution the volume of sprayed test solution must increase by using larger test chambers. Indication: Request individual information to adjust the nozzle without flow measuring and control module. Test interruption/Shutting down: Turn the selector switch 'atomization/ventilation' to the 'ventilation' position before interrupting the test or before the end of the test. Compressed air will then blow out the remaining mist in the chamber via the mist output line (takes approx. 10 minutes). Return the selector switch 'atomization/ventilation' to 0. Then you can open the door 4.3 Testing cabinet with cycle counter/test duration (optional) Display actual value Key switch LED-Display Input 1 LED-Display Input 2 Display set point Display Relais output Set point adjustm. ‘up’ Set point Functional key adjustment ‘down’ Fig. 11: Cycle counter/Test duration (optional) ____________________________________________________________________________________________ Gebr. Liebisch GmbH & Co. KG - P.O. Box 140606 - D-33626 Bielefeld - Fon +49 (0)521 9 46 47-0 Fax +49 (0)521 9 46 47-90 - E-Mail: [email protected] - www.liebisch.com -24Operation of the cycle counter: l l l l l l After switching on the system the cycle counter is activated and performs a self-test. The LED displays ‘Input 1’ and ‘Input 2’ light up. The ‘Relay output’ display is not active. Select the test duration [h] and [min] by actuating the buttons 'Up' / 'Down'. Start the counter by turning the key to the right at 90°. The selected time elapses now. The displays ‘Input 2’ and ‘Relay output’ are out. The remaining time is displayed at ‘Display actual value’. When the selected time is remained (Countdown function), the actual value display is 0 and the green LED display ‘Relay output’ is activated. Reset / new start: Turn the key switch to vertical position and repeat the start procedure. ____________________________________________________________________________________________ Gebr. Liebisch GmbH & Co. KG - P.O. Box 140606 - D-33626 Bielefeld - Fon +49 (0)521 9 46 47-0 Fax +49 (0)521 9 46 47-90 - E-Mail: [email protected] - www.liebisch.com -25- 5 Care and maintenance 5.1 Maintenance plan What? When? Clean the testing chamber Monthly Check condition of silicone seal and inform the after-sales service if Yearly necessary Who? Operator Operator Check door seal for tightness and inform the after-sales service if necessary Monthly Operator Check the overtemperature protection function Yearly After-sales service Check function of overpressure and vacuum valves Yearly After-sales service Check the water draining quickaction coupling for tightness Monthly Operator Table 3: Maintenance plan 5.2 Cleaning the testing chamber Carefully observe any arising corrosion products and remove. 5.3 Checking the condition of the silicone seal Visually check the circumferential silicone seal of the glass base of the testing chamber. Inform the after-sales service if it is found to be mechanically or chemically damaged. 5.4 Checking the door seal for tightness Check the door seal for mechanical and chemical damage. Uniform contact pressure of the glass door must be ensured. If necessary, readjust the bracket (adjustable closure latch) to increase the contact pressure of the glass door. ____________________________________________________________________________________________ Gebr. Liebisch GmbH & Co. KG - P.O. Box 140606 - D-33626 Bielefeld - Fon +49 (0)521 9 46 47-0 Fax +49 (0)521 9 46 47-90 - E-Mail: [email protected] - www.liebisch.com -26- 5.5 Checking the performance of the vacuum valve Diminished return flow in the drain-off channel below the testing chamber door indicates a clogged drain connection or vacuum valve. 5.6 Check the quick-action couplings for tightness Check the connecting couplings (gas inlet/water drainage) that they are firmly seated in the case bushings. If necessary, carefully tighten the connecting couplings with a size 22 wrench. ____________________________________________________________________________________________ Gebr. Liebisch GmbH & Co. KG - P.O. Box 140606 - D-33626 Bielefeld - Fon +49 (0)521 9 46 47-0 Fax +49 (0)521 9 46 47-90 - E-Mail: [email protected] - www.liebisch.com -27- 6 Annex: Survey of the pictographs On (switch on or switched on) Off (switch off or switched off) Key lock operating panel Key lock lid-drive Test chamber open / close Atomizing SAL Ventilation Ventilation off KON bedewing Timer Heating test chamber KON Heating test chamber SAL Heating test chamber warm air Heating humidifier SAL Nozzle cleaning Test chamber cleaning Dosing pump test solution Temperature limiter test chamber Temperature limiter humidifier Fault of dosing pump test solution ____________________________________________________________________________________________ Gebr. Liebisch GmbH & Co. KG - P.O. Box 140606 - D-33626 Bielefeld - Fon +49 (0)521 9 46 47-0 Fax +49 (0)521 9 46 47-90 - E-Mail: [email protected] - www.liebisch.com -28- Fault of compressed air supply Flooding test chamber Low water test chamber Unlimited Pressure control Pressure measuring Compressed air operating condition Humidifier SAL, general Nozzle, general Flow control Fan test chamber Illumination Test solution, general Test chamber emptying Overflooding unit bottom Filling, filling opening Flooding humidifier Low water humidifier Fault air flow ventilation ____________________________________________________________________________________________ Gebr. Liebisch GmbH & Co. KG - P.O. Box 140606 - D-33626 Bielefeld - Fon +49 (0)521 9 46 47-0 Fax +49 (0)521 9 46 47-90 - E-Mail: [email protected] - www.liebisch.com -29Annex: Spare parts list, M-SC Designation Description Item No. Y1 1131 0022 1504 Y2 1131 0022 1505 Y15 1131 0011 1001 Y10 1131 0022 1504 Y17 1131 0011 1003 Y18 1131 0011 1003 E11 1131 0000 0030 Heater grid, test.chamber (1000 litres) back Heater grid, test.chamber (2000 litres) back middle Heater grid, test.chamber (400 litres) side left Heater grid, test.chamber (1000/2000 litres) side left Heater grid, test.chamber (2000 litres) back left E11.1 1131 0000 0020 E11 1131 0000 0050 E13.2 1131 0000 0030 E11 1131 0000 0015 E12.1 1131 0000 0050 Heater grid, test.chamber (400 litres) side right Heater grid, test.chamber (1000/2000 litres) side right Heater grid, test.chamber (2000 litres) back right side Heater - Humidifier E13 1131 0000 0030 E11.2 1131 0000 0015 E13.1 1131 0000 0050 E12 1131 0000 0426 Power supply (30 W) G1 1172 0000 0009 Mains filter Z1 1171 0000 0012 Contactor - Safety circuit overtemperature K1 1181 0000 0501 2/2-way valve, continuous input 2/2-way valve, follower deionized water humidifier 2/2-way valve, follower testing solution (secondary tank) (option) 2/2-way valve, ventilation 2/2-way valve, cleaning test.chamber demi.water (option) 2/2-way valve, cleaning samples (option) Heater grid, test.chamber (400 litres) back Additional contact for K1 (22DIL 1188 0000 0512 Semi-conductor relay-heating E11 K11 1182 0000 0713 Semi-conductor relay-heating E11.1 K12 1182 0000 0713 Semi-conductor relay-heating E11.2 K13 1182 0000 0713 Semi-conductor relay-heating E12 K12 1182 0000 0713 Level-control relay - Humidifier N2 1181 0000 0547 Level-control relay - flooding unit bottom N1 1181 0000 0548 K30-K70 1181 0000 0701 Relay Compr. air monitoring 1141 0000 0302 Temp. controller Heater testing chamber SAL P11 1151 0000 1112 Temp. controller - Humidifier P12 1151 0000 1112 Switch-internal lighting (option) S10 1111 0003 0050 Main switch (12A) Q1 1111 0003 0011 ____________________________________________________________________________________________ Gebr. Liebisch GmbH & Co. KG - P.O. Box 140606 - D-33626 Bielefeld - Fon +49 (0)521 9 46 47-0 Fax +49 (0)521 9 46 47-90 - E-Mail: [email protected] - www.liebisch.com -30Cycle counter E2 Timer - operating time E3 Timer - periodic working mode Pilot lamp for overtemperature Testing chamber (red) Pilot lamp for overtemperature Humidifier (red) E4 H1 1121 0001 0102 H2 1121 0001 0102 Pilot lamp - insufficient water humidifier (red) H4 1121 0001 0102 H4.1 1121 0001 0102 Pilot lamp for fault of compr. air supply (red) H5 1121 0001 0102 Pilot lamp for overflooding unit bottom (red) H6 1121 0001 0102 Pilot lamp for fault of dosing pump (red) Pilot lamp for testing solution storage empty (red) Pilot lamp level control testing solution storage (yellow) Pilot lamp for heater Testing chamber (yellow) H9 1121 0001 0102 H57 1121 0001 0251 H57.1-H57.5 1121 0001 0151 H11 1121 0001 0101 Pilot lamp for heating humidifier (yellow) H12 1121 0001 0101 Selector switch - Continuous/ fog evacuation S20 1111 0003 0210 Lock - start duration of test S50 Safety switch - door testing chamber B40 1141 0000 0501 Internal lighting (400/1000 litres) Internal lighting (2000 litres) left, length of cable 2m Internal lighting (2000 litres) right, length of cable 4m Series device, left side (option) E1 6133 0000 0001 E1 6133 0000 0001 E1.1 6133 0000 0002 L1 1172 0000 0100 Series device, right side L1.1 1172 0000 0100 Test solution pump M1 1132 0000 0103 Float switch- storage tank testing solution (NaCl) S8 1141 0000 0403 Temp. sensor Testing chamber (PT-100) B1 1142 0000 0013 Temp. sensor Humidifier (PT-100) B2 1142 0000 0012 Filling-level probe-Level controller humidifier B4 1142 0000 0302 Temperature limiter for testing chamber F1 1181 0000 0121 Temperature limiter for humidifier F2 1181 0002 0131 Humidifier tank SAL 101 1356 0000 0002 Draining valve Humidifier 102 1324 0026 0751 Pilot lamp for overfilling humidifier (red) Non-return valve Humidifier 1324 0026 0601 Plug-in connector - Humidifier (grey) 103 1356 0000 9002 Plug-in connector - Humidifier (black) 104 1356 0000 9003 Screw union for grey 105 1356 0000 9011 Screw union for black 106 1356 0000 9012 ____________________________________________________________________________________________ Gebr. Liebisch GmbH & Co. KG - P.O. Box 140606 - D-33626 Bielefeld - Fon +49 (0)521 9 46 47-0 Fax +49 (0)521 9 46 47-90 - E-Mail: [email protected] - www.liebisch.com -31Lid - Humidifier 6356 0000 9022 O-ring seal for lid - Humidifier 1356 0000 9014 Air-conducting pipe - Humidifier (long) 1356 0000 9009 Air-conducting pipe - Humidifier (short) 1356 0000 9010 Air distributor - Humidifier Filter 1211 0000 0401 Air distributor, complete with bracket 5214 0000 0001 Pressure gauge for compressed air SAL 1214 0000 0501 Pressure controller for compressed air SAL 1214 0000 0101 Overpressure valve 1324 0002 5001 Compressed air cleaning device Changeover valve, advance pressure, for nozzle - Humidifier 2-substance nozzle 1100 0009 1214 0000 0103 1484 0022 1313 Non-return valve for suction line Replacement for continuous flow test solution filter Continuous flow test solution filter, complete 1494 0033 5006 Flow measuring and control module (DMR) Needle valve of the flow measuring and control module Steering castors 1215 0000 0001 Connector for compressed air 1414 0023 0064 Plug-in nipple 1414 0037 0001 Measuring cylinder - Mist collector 1536 0000 1001 Glass door (400 litres) 1530 0000 0003 Glass door (1000 litres) 1530 0000 0004 Glass door (2000 litres) 1540 0000 0002 Hinges for glass door 1010 3000 0102 Seal for glass door (400 litres) 6452 0000 0007 Seal for glass door (1000 litres) 6452 0000 0009 Seal for glass door (2000 litres) 6452 0000 0010 1282 0002 0404 5212 0000 0402 1282 0000 1009 1010 0000 0001 Tab. 4 Spare parts list, M-SC ____________________________________________________________________________________________ Gebr. Liebisch GmbH & Co. KG - P.O. Box 140606 - D-33626 Bielefeld - Fon +49 (0)521 9 46 47-0 Fax +49 (0)521 9 46 47-90 - E-Mail: [email protected] - www.liebisch.com -36Annex: options Dosing pump The testing unit can be equipped with an optional dosing pump. The maximum volume of test solution is factory stored on 2 l/hr. The customer specific adjustment is to set by the potentiometric controller (1) on the control panel. The controlling is infinitely variable with a range of 0 to 2 l/hr. A full rotation of a controller changes the volume by 0,2 l/hr, every adjustment can be fixed. Figure Control panel (top) / dosing pump For a new adjustment of a nozzle (for example after cleaning) it is possible, that the user had to set new values for the atomized amount of test solution. To check the values the user can control the flow measuring unit (if exists). We prefer to measure the collected volume of test solution, for example according to DIN EN ISO 9227: The collecting of a definite volume of test solution in graduated cylinders. Testing chamber light The fluorescent light on the back wall of the testing chamber can be switched on and off at any time (also during the actual test) with the interior light switch. Glass door wiper The wiper should only be used when the glass door is misted. The glass door wiper must only be turned clockwise. ____________________________________________________________________________________________ Gebr. Liebisch GmbH & Co. KG - P.O. Box 140606 - D-33626 Bielefeld - Fon +49 (0)521 9 46 47-0 Fax +49 (0)521 9 46 47-90 - E-Mail: [email protected] - www.liebisch.com Copyright by G ebr. Liebisch GmbH & Co. KG D-33649 Bielefeld Eisenstraße 34 Gebr. Liebisch GmbH & Co. KG Fon +49 / 521 / 9 46 47-0 Fax +49 / 521 / 9 46 47-90 www.liebisc h.com [email protected] om (deposited in grey) Alle Rechte sowie technische Änder ungen vorbehalten Bl. / Anz. Bl. / gesamt 1/22 8100 6150 1001 All rights and technical changes reserved Zeichnung Projekt Blatt-Nr. 1 Interior lighting Recurrent working mode Mist nozzle flushing Test chamber flushing Dosing pump test solution After-run test solution Options Terminal assignment plan Circuit wiring diagram Development plan Drawings S 1000 M-SC Type Corrosion testing unit Abteilung: GGB 12.04.00 11.10.07 K11.1 K11.2 K35 K2 K12 Ers. durch Norm geprüft T1 Pi Pietig K38 X81 Alle Rechte sowie technische Änder ungen vorbehalten K36 S 1 000 M-SC Aufbauplan Blatt: 6 Gerät: L1 X82 Eisenstraße 34, D-33649 Bielefeld N ame Bearb. Änderung Ers. für K 57 K 34 5 Bl. / Anz. 2/20 Bl. / gesamt 2/22 8100 6150 1001 All r ights and technical changes r eserved Zeichnung Projekt Blatt-Nr. 2 7 Z1 Copyr ight by G ebr . Liebisch G mbH & Co. KG Zchng. erstellt Zchng. geändert Zustand Ursprung K11 N2 e ( Test room cleaning ) ( Circuit test solution ) ( Mist nozzle cleaning ) ( Test room illumination ) ( Dosing pump test solution ) ( Visualization ) 4 N1 d -Interface relais K35 -Interface relais K36 -Interface relais K38 -Ballast L1 -Measuring transmitter T1 -Converter A11 3 K1 c b a 2 Following components exist only for corresponding equipment: ( deposited in grey ) 1 A11 G1 Abteilung: GGB 8 e d c b a 3 Pietig Pietig P12 X24 R1 X23 H9 D5T H57.5 H57.4 H57.3 H57.2 H57.1 H57 H4 H6 Zeichnung Projekt Blatt-Nr. 3 7 H2 S22 H11 X20 H4.1 Copyr ight by G ebr . Liebisch G mbH & Co. KG Eisenstraße 34, D-33649 Bielefeld Ers. durch Alle Rechte sowie technische Änder ungen vorbehalten P11 Norm geprüft X21 8100 6150 1001 H1 S20 H12 S23 S50 S 1 000 M-SC Aufbauplan Gerät: Blatt: Bl. / gesamt 3/22 All r ights and technical changes r eserved Bl. / Anz. 3/20 Abteilung: GGB 8 c b a e N ame Bearb. Änderung Ers. für Duration of test ) Duration of test ) Fault of dosing pump ) Dosing pump test solution ) Interior lighting ) Recurrent/continuous atomization ) Mist nozzle/test chamber flushing ) Plug connector ) 6 H5 e 13.06.06 11.10.07 ( ( ( ( ( ( ( ( 5 X25 d Zchng. erstellt Zchng. geändert Zustand Ursprung -Timer D5T -Key switch S50 -Control lamp H9 -Potentiometer R1 -Toggle switch S10 -Toggle switch S22 -Toggle switch S23 -Terminal strip X25 4 X22 Q1 d c b a 2 Following components exist only for corresponding option equipment: ( deposited in grey ) 1 S10 e d c b a L2 II.1 II.2 L3 III. III. N 2 10.02.00 11.10.07 N bu 1,5 PE Pi Pietig gn-ye 1,5 P bk 1,5 bk 1,5 bk 1,5 bk 1,5 bu 1,5 12A -Z1 Load N´ P´ Ers. durch Norm geprüft Mains filter PE Line Eisenstraße 34, D-33649 Bielefeld N ame Bearb. Änderung Ers. für pre fuse max. 16A Incoming supply 400/230V ~ 3/N/PE 50Hz L1 I.1 I.2 Copyr ight by G ebr . Liebisch G mbH & Co. KG Zchng. erstellt Zchng. geändert Zustand Ursprung CEE 16A -X0 Main switch 8A -Q1 1 3 -X82 bn 1,5 bu 1,5 3 wh 0,75 4 3 1 2 t 10 9 8 -X20 8 6 7 /5.6 Duration of test -S50 -D5T -X20 7 5 -G 1 + L - N PE Stromlaufplan Blatt: 2 4 1 3 S 1 000 M-SC /7.1 -K2 6 Gerät: Direct current supply 230V~/24V30W Alle Rechte sowie technische Änder ungen vorbehalten -X81 4 1 2 6 5 14 13 /5.6 -K1 4 3 Bl. / gesamt 4/22 /9.1 /9.1 /11.1 /11.1 /11.1 /11.1 /7.1 /7.1 /5.1 /7.1 /5.1 Abteilung: GGB 24V.E M.E gy 0,75 bu 0,75 L1.G N.G L1.F N.F PE L1.H L2.H L3.H N.H 8 bn 1,5 bn 1,5 bn 1,5 bu 1,5 rd 1,0 bu 1,0 8100 6150 1001 Bl. / Anz. 4/20 -X81 -X81 bn 1,0 bu 1,0 gn-ye 1,0 All r ights and technical changes r eserved Zeichnung Projekt Blatt-Nr. 4 2 1 7 e d c b a e d c b a N.F -F1 L1.F 2 X2 X1 1 10 4 2 9 20.09.99 11.10.07 11 Pi Pietig Eisenstraße 34, D-33649 Bielefeld N ame Bearb. Änderung Ers. für 4 X2 X1 3 12 2 Overtemperature humidifier 80 °C -X22 rt -H2 -X22 -X3 4 1 ϑ 1 -X3 10 -F2 2 8 Overtemperature test chamber 55 °C -X22 rt -H1 -X22 -X1 ϑ -X1 Copyr ight by G ebr . Liebisch G mbH & Co. KG Zchng. erstellt Zchng. geändert Zustand Ursprung /4.8 /4.8 1 Ers. durch Norm geprüft 3 6 X2 X1 5 2 3 Leakage monitoring -X22 rt -H6 -X22 /6.1 -N1 1 8 X2 X1 7 2 1 Flooding humidifier -X22 rt -H4.1 -X22 7 -N2 3 -S1 5 -X2 P 10 X2 3 5 7 2 A2 A1 10 6 7 9 8 Stromlaufplan 6 14 5 13 /4.7 /4.7 Blatt: 4 3 S 1 000 M-SC 2 1 Operational safety -K1 -X20 /4.4 -D5T -X20 6 Gerät: Compressed air supply 4,0 bar -X22 rt -H5 X1 9 6 1 -X2 -X22 Alle Rechte sowie technische Änder ungen vorbehalten 4 -N2 2 3 4 5 6 7 8 2 2 1 3 3 13 12 2 3 All r ights and technical changes r eserved Bl. / gesamt 5/22 8100 6150 1001 /7.1 4 Bl. / Anz. 5/20 11 1 Level controller humidifier 1 Zeichnung Projekt Blatt-Nr. 5 -B4 -X2 18 17 16 15 14 13 12 11 1 7 N.F L1.F Abteilung: GGB wh 0,75 wh 0,75 8 /6.1 /6.1 e d c b a e d c b a L1.F N.F # 1 6 5 S -B10 10.02.00 11.10.07 2 3 1 1 2 2 Pi Pietig -X1 3 Eisenstraße 34, D-33649 Bielefeld N ame Bearb. Änderung Ers. für /5.3 -X1 wh 0,75 wh 0,75 4 8 Leakage monitoring -X1 -N1 7 Copyr ight by G ebr . Liebisch G mbH & Co. KG Zchng. erstellt Zchng. geändert Zustand Ursprung /5.8 2 1 2 4 Norm geprüft Ers. durch -B11 -X1 3 -X1 5 -B12 1 2 6 5 Alle Rechte sowie technische Änder ungen vorbehalten -X1 4 1 -X25 4 3 2 -E1 Stromlaufplan Blatt: 8W Interior lighting 3 EVG 4 2.3 1.3 N 2.1 1.1 L 2 1 6 S 1 000 M-SC H03VV -F 5G0,75 Gerät: -L1 -S10 -X25 bn bk /5.8 1 gy bu Bl. / Anz. 6/20 Bl. / gesamt 6/22 8100 6150 1001 All r ights and technical changes r eserved Zeichnung Projekt Blatt-Nr. 6 7 L1.F N.F /11.1 /11.1 Abteilung: GGB 8 e d c b a e d c b a N.G PE -S20 L1.G -K2 A2 A1 4 1a 1 3 2 A L 1 20.09.99 28.11.07 5 13 4 3 /4.6 /4.6 6 /4.6 14 /4.6 2 1 1b 12 13 11 Heating safety -X20 1 0 2 -X20 -X81 -B40 -X81 /5.7 -N2 2a 2 4 Pi Pietig 6 A2 Eisenstraße 34, D-33649 Bielefeld Ers. durch Norm geprüft After-run demin. water humidifier -X10 -Y2 A1 X1 X2 5 -X10 3 Low water humidifier -X23 rt -H4 -X23 N ame Bearb. Änderung Ers. für Copyr ight by G ebr . Liebisch G mbH & Co. KG Zchng. erstellt Zchng. geändert Zustand Ursprung /4.8 /4.8 /4.8 1 2b 2 /8.3 3 5 -K35 11 12 14 T 6,3A -X500 3 11 14 L 11 After-run demin. water humidifier 45W 12 N M 1 -X12 -M3 -X12 -X23 1 5 1b 2a /8.3 7 3 Stromlaufplan 41 31 21 11 Blatt: 44 34 42 32 22 24 14 12 S 1 000 M-SC 41 34 42 7 3 A2 A1 7 Mist nozzle flushing -K38 -X23 6 Gerät: 31 32 44 21 11 22 24 14 12 Test chamber flushing A2 A1 6 1a -X23 10 2 -K35 -S23 5 Alle Rechte sowie technische Änder ungen vorbehalten After-run demin. water external -X81 6 -K38 12 4 2b 2 12 A2 3 A2 A1 2 Bl. / Anz. 7/20 -X12 6 A2 A1 5 8 N.G PE L1.G Bl. / gesamt 7/22 /9.1 /8.1 /8.1 Abteilung: GGB Mist nozzle flushing secondary -X12 -Y16.1 8100 6150 1001 Mist nozzle flushing primary -X12 -Y16 -X12 22 24 21 All r ights and technical changes r eserved Zeichnung Projekt Blatt-Nr. 7 Test chamber flushing -X10 -Y17 A1 11 6 5 -X10 -K38 22 24 21 -K35 7 e d c b a e d c b N.G 1 1a 9 Pi Pietig -X20 6 -X20 5 -X20 wh 0,75 2 3 1 10 8 6 2 3 A2 A1 2 32 34 Ers. durch Norm geprüft Atomizing test solution -X10 -Y1 -X10 /7.6 -K38 Eisenstraße 34, D-33649 Bielefeld N ame Bearb. Änderung Ers. für 7 Recurrent working mode 1 2a 2b 2 t 31 9 A2 A1 8 Test chamber ventilation -X10 -Y10 -X10 3 10W Circuit test solution -X9 N M 1 2 X2 X1 1 9 2 1 Fault of dosing pump -X23 rt -H9 -X23 -X2 5 -M9 5 -X9 L 5 6 N M 1 -X9 4 5 -T1 2 1 Stromlaufplan Blatt: 5 S 1 000 M-SC 3 2 1 6 4 5 -R1 Measuring transmitter dosing pump 12 11 10 9 6 Gerät: 0,3A Dosing pump test solution -M9 Alle Rechte sowie technische Änder ungen vorbehalten -M1 L 2 12 14 -X9 /9.4 6 8 -K36 2 1 11 -X2 3 2b 7 2a 2 4 8 /7.1 -S20 -D6T 1b -S22 1 20.09.99 11.10.07 -D6T 2 2 2a Copyr ight by G ebr . Liebisch G mbH & Co. KG Zchng. erstellt Zchng. geändert Zustand Ursprung /7.8 -S22 -X20 2b 2 2 L1.G 3 wh a /7.8 2 ccw bn 1 cw 7 Bl. / Anz. 8/20 Bl. / gesamt 8/22 8100 6150 1001 All r ights and technical changes r eserved Zeichnung Projekt Blatt-Nr. 8 s gn N.G L1.G /9.1 /9.1 Abteilung: GGB 8 e d c b a e d c b a N.G M.E PE -S8 L1.G 24V.E 20.09.99 28.11.07 6 5 6 5 4 4 2 3 2 3 2 Pi Pietig 1 1 -K57 Eisenstraße 34, D-33649 Bielefeld N ame Bearb. Änderung Ers. für Level controller reservoir test solution sw bl ws br ge gn -X203 -X3 Copyr ight by G ebr . Liebisch G mbH & Co. KG Zchng. erstellt Zchng. geändert Zustand Ursprung /7.8 /8.8 /4.8 /4.8 /8.8 1 14 12 3 Ers. durch Norm geprüft 11 10 X2 X1 9 empty -X23 rt -H57 Reservoir test solution empty A2 A1 -X23 -X24 1 -K36 A1 -X24 3 -X24 5 -X24 7 -X24 9 2 X2 reserve -X24 ge -H57.1 X1 -X24 ge -H57.2 4 X2 11 /8.4 6 X2 >50% -X24 ge -H57.3 X1 8 X2 X1 >75% -X24 ge -H57.4 Alle Rechte sowie technische Änder ungen vorbehalten 14 12 Circuit >25% test solution A2 X1 10 X2 -K34 A1 Stromlaufplan 7 Blatt: 11 S 1 000 M-SC 14 12 T 6,3 -X501 After-run test solution A2 Gerät: 100% -X24 ge -H57.5 X1 4 12 14 11 7 3 A2 A1 2 Bl. / Anz. 9/20 Bl. / gesamt 9/22 8100 6150 1001 After-run test solution -X11 -Y15 -X11 All r ights and technical changes r eserved Zeichnung Projekt Blatt-Nr. 9 After-run test solution external -X81 6 6 3 14 12 5 -K34 11 4 -K57 3 /10.1 /10.1 Abteilung: GGB N.G M.E PE L1.G 24V.E 8 e d c b a e d c M.E 1 20.09.99 11.10.07 Converter visualization 9 TCP/IP 2 -P11 Modbus RS485 -P12 9 10 Eisenstraße 34, D-33649 Bielefeld Pi Pietig Modbus RS485 9 10 Norm geprüft Temperature controller heating SAL humidifier Ers. durch Temperature controller heatings SAL test chamber wh 0,75 wh 0,75 N ame Bearb. Änderung Ers. für Copyr ight by G ebr . Liebisch G mbH & Co. KG Zchng. erstellt Zchng. geändert Zustand Ursprung /9.8 seriell Alle Rechte sowie technische Änder ungen vorbehalten 5 6 Zeichnung Projekt Blatt-Nr. 10 7 S 1 000 M-SC Stromlaufplan Gerät: 8100 6150 1001 Blatt: Bl. / gesamt 10/22 All r ights and technical changes r eserved Bl. / Anz. 10/20 Abteilung: GGB M.E 24V.E 8 e d c b -A11 4 b 10 3 a 24V.E 2 a /9.8 1 e d c b a N.F N.H 3 2 -X21 7 8 X2 X1 6 5 Pi Pietig 0,7 kW Heating SAL test chamber back wall -X5 -E11.1 -X5 T1 L1 Eisenstraße 34, D-33649 Bielefeld N ame Bearb. Änderung Ers. für -X21 ge -H11 Copyr ight by G ebr . Liebisch G mbH & Co. KG 20.09.99 11.10.07 Heating SAL test chamber side wall left 0,7 kW -X5 -E11 -X5 4 3 T1 -K11.1 L1 2 -K11 L1.F L1.H L2.H L3.H Zchng. erstellt Zchng. geändert Zustand Ursprung /4.8 /6.8 /4.8 /4.8 /4.8 /6.8 1 9 8 T1 Ers. durch Norm geprüft L1 -X21 -K11 Heating SAL test chamber side wall right 0,7 kW -X5 -E11.2 -X5 4 -K11.2 L1 3 T1 A2 A1 3 1 -K11.1 rd 0,75 L1 2 L1 -X21 -K11.2 -X21 1 24 -X5 7 11 T1 -X21 9 T1 3 12 S 1 000 M-SC Stromlaufplan Blatt: 1,0 kW Heating SAL humidifier -X5 -E12 Gerät: Temperature controller heatings SAL test chamber PT100 -B1 -X21 ge -H12 10 X2 X1 A2 -P12 T1 6 -X21 2 3 PID 1 24 23 2 Bl. / Anz. 11/20 Bl. / gesamt 11/22 8100 6150 1001 8 N.F N.H L1.F L1.H L2.H L3.H Abteilung: GGB Temperature controller heating SAL humidifier PT100 -B2 ϑ ϑ 19 1 20 -X21 All r ights and technical changes r eserved Zeichnung Projekt Blatt-Nr. 11 L1 -X21 -K12 wh 0,75 ϑ 3 PI D A1 5 6 19 1 2 ϑ -K12 L1 -X21 rd 0, 75 7 wh 0,75 -P11 23 2 6 4 A2 A1 20 -X21 5 Alle Rechte sowie technische Änder ungen vorbehalten T1 A1 A2 4 e d c b a X25 /1 L1.F K1 /2 L3.H K2 /6 K11.2 /L1 K12 /L1 K2 /4 K11.1 /L1 L2.H K2 /2 K11 /L1 L1.H N.G X500 /N X10 /3 X23 /2 N.G K1 /4 K2 /A2 X9 /3 L1.G K35 /14 X23 /5 L1.G N2 /11 X20 /2 N.F X23 /4 X25 /2 N.F G1 /N X21 /1 X20 /7 N.F Z1 /N´ K1 /3 X22 /2 Ers. durch Alle Rechte sowie technische Änder ungen vorbehalten X501 /N Norm geprüft N.G X11 /3 X12 /3 Pi Pietig N.G X20 /1 T1 /2 Eisenstraße 34, D-33649 Bielefeld N ame Bearb. Änderung Ers. für Copyr ight by G ebr . Liebisch G mbH & Co. KG 20.09.99 28.11.07 K2 /14 6 Zeichnung Projekt Blatt-Nr. 12 7 8100 6150 1001 Abteilung: GGB 8 c b a S 1 000 M-SC Klemmenplan Gerät: Blatt: Bl. / gesamt 12/22 All r ights and technical changes r eserved Bl. / Anz. 12/20 e N.H X5 /3 X5 /6 e X21 /8 5 3 d Zchng. erstellt Zchng. geändert Zustand Ursprung -X81 4 4 d c b 3 N.H X5 /9 X5 /12 2 N2 /13 X500 /L a Z1 /P´ L1.F K1 /1 X1 /8 G1 /L L1.F X21 /2 X20 /8 N2 /12 1 B40 /L X20 /3 2 B40 /A 1 K34 /12 X501 /L Base plate Operation panel PE X5 /1 X5 /4 PE X1 /7 X3 /9 Copyr ight by G ebr . Liebisch G mbH & Co. KG Eisenstraße 34, D-33649 Bielefeld Ers. durch Norm geprüft PE X5 /7 X5 /10 Pi Pietig Bottom plate N ame Bearb. Änderung Ers. für PE X9 /1 X9 /4 20.09.99 11.10.07 X500 /PE 5 Alle Rechte sowie technische Änder ungen vorbehalten 4 6 Zeichnung Projekt Blatt-Nr. 13 7 8100 6150 1001 Abteilung: GGB 8 c b a S 1 000 M-SC Klemmenplan Gerät: Blatt: Bl. / gesamt 13/22 All r ights and technical changes r eserved Bl. / Anz. 13/20 e PE X10 /1 X10 /4 e X501 /PE d Zchng. erstellt Zchng. geändert Zustand Ursprung -X82 PE X10 /7 X10 /10 d c b 3 G1 /PE 2 PE X11 /1 X12 /1 a 1 Z1 /PE Load PE X12 /4 X12 /10 e d c b a 11.02.00 11.10.07 -X1 -B11 Leakage control 1 1 Pi Pietig -B12 1 -F1 4 2 55 °C Ers. durch Norm geprüft Excess temp. test chamber ϑ PE Eisenstraße 34, D-33649 Bielefeld N ame Bearb. Änderung Ers. für -B10 2 2 1 1 3 Alle Rechte sowie technische Änder ungen vorbehalten 1 1 -M9 2 3 Klemmenplan Fault dosing pump Blatt: 3 2 S 1 000 M-SC Compr. air control 4,0 bar -S1 P Gerät: Level controller humidifier -B4 2 9 8 7 6 5 4 3 2 1 10 9 8 7 6 5 4 3 2 1 2 9 8 7 6 5 4 3 -X2 2 12 1 11 10 9 8 7 6 6 5 5 4 4 3 3 2 2 1 Copyr ight by G ebr . Liebisch G mbH & Co. KG Zchng. erstellt Zchng. geändert Zustand Ursprung 1 N1/6 W1.1 H03VV -F 2x0, 75 bn -X1.1 N1/5 bu X1/1 W1.1.1 H03VV-F 2x0,75 bn X1/2 bu X1/3 W1.1.2 H03VV-F 2x0,75 bn X1/4 bu PE gn-ye W1.2 H03VV -F 4G 0,75 wh W2.1 LiYY -O 4x0,34 -X1.2 L1.F bk X3/10 bn X22/1 gy N2/6 -X2.1 N2/15 bn N2/5 gn N2/3 bk W2.2 H03VV -F 4x0, 75 bn W2.3 A05RN-F 3x0,75 -X2.2 X22/9 bn X20/9 gy T1/1 -X2.3 X23/1 bk 10 12 Bl. / Anz. 14/20 Bl. / gesamt 14/22 8100 6150 1001 All r ights and technical changes r eserved Zeichnung Projekt Blatt-Nr. 14 11 7 Abteilung: GGB 8 e d c b a e d sw bl br 3 2 2 W3.1 LiY Y-O 7x0,34 wh 1 1 7 Eisenstraße 34, D-33649 Bielefeld Pi Pietig 6 5 4 3 bn bu N ame Bearb. Änderung Ers. für 6 5 4 gn bn bk -X203.1 Copyr ight by G ebr . Liebisch G mbH & Co. KG 11.02.00 11.10.07 Level controller reservoir test solution Zchng. erstellt Zchng. geändert Zustand Ursprung -S8 ge ws gn -X203 Norm geprüft 9 Ers. durch 8 10 1 ye wh W203.1 PVC 7x0,14 c 10 9 6 5 4 3 2 24V.E gy ye b 10 9 3 K57/A1 2 8 4 X24/3 1 7 6 5 X24/5 pk gn -X3 X24/7 3 K34/A1 2 PE -X3.1 X1/9 -X3.3 11 11 N1/1 gn-ye ϑ 12 12 -F2 4 1 2 bn 85 °C Excess temp. humidifier PE W3.3 H03VV-F 4G0,75 X22/3 bk a 1 gy -X4 Klemmenplan 8 Blatt: 6 S 1 000 M-SC 5 Gerät: 4 7 3 1 2 6 5 Alle Rechte sowie technische Änder ungen vorbehalten 4 9 10 12 Bl. / Anz. 15/20 Bl. / gesamt 15/22 8100 6150 1001 All r ights and technical changes r eserved Zeichnung Projekt Blatt-Nr. 15 11 7 Abteilung: GGB 8 e d c b a e d c b a 11.02.00 11.10.07 -X5 -E11.1 Pi Pietig -E12 PE Ers. durch Norm geprüft Heating SAL Heating SAL test chamber humidifier side wall right 0,7 kW 1,0 kW -E11.2 PE Eisenstraße 34, D-33649 Bielefeld N ame Bearb. Änderung Ers. für Heating SAL Heating SAL test chamber test chamber side wall back wall left 0,7 kW 0,7 kW -E11 PE 12 11 10 9 8 7 6 5 4 3 2 1 PE 12 11 10 9 8 7 6 5 4 3 3 2 2 1 Copyr ight by G ebr . Liebisch G mbH & Co. KG Zchng. erstellt Zchng. geändert Zustand Ursprung 1 PE W5.1 Glass silk hose gn-ye -X5.1 K11/T1 bn N.H bu PE W5.2 Glass silk hose gn-ye -X5.2 K11.1/T1 bn N.H bu PE W5.3 Glass silk hose gn-ye -X5.3 K11.2/T1 bn N.H bu PE W5.4 H03VV-F 3G0,75 gn-ye -X5.4 K12/T1 bn N.H bu -X6 1 5 Alle Rechte sowie technische Änder ungen vorbehalten 4 2 7 8 Klemmenplan 6 Blatt: 5 S 1 000 M-SC 4 Gerät: 3 6 9 10 12 Bl. / Anz. 16/20 Bl. / gesamt 16/22 8100 6150 1001 All r ights and technical changes r eserved Zeichnung Projekt Blatt-Nr. 16 11 7 Abteilung: GGB 8 e d c b a e d c b a 11.02.00 11.10.07 -X9 1 1 Pi Pietig Eisenstraße 34, D-33649 Bielefeld N ame Bearb. Änderung Ers. für 230V~/0,3A -M9 N 230V~/10W PE M Dosing pump test solution -M1 L Circuit test solution PE M N Ers. durch Norm geprüft -Y1 2 1 Alle Rechte sowie technische Änder ungen vorbehalten -Y2 2 1 -Y10 2 1 PE -Y17 2 1 Klemmenplan Blatt: 7 Bl. / Anz. 17/20 Bl. / gesamt 17/22 8100 6150 1001 All r ights and technical changes r eserved Zeichnung Projekt Blatt-Nr. 17 Test chamber Test chamber ventilation flushing PE S 1 000 M-SC After-run demin. water humidifier PE Gerät: Atomizing test solution PE 12 11 10 9 8 7 6 5 4 3 2 1 6 5 4 3 2 1 L 12 11 10 9 8 7 6 -X10 5 12 4 11 3 10 2 9 1 8 6 6 5 5 4 4 3 7 3 2 2 1 Copyr ight by G ebr . Liebisch G mbH & Co. KG Zchng. erstellt Zchng. geändert Zustand Ursprung 1 PE W9.1 H03VV-F 3G0,75 gn-ye -X9.1 K36/14 bn N.G bu PE W9.2 A 05RN-F 3x0,75 gn-ye -X9.2 X10/2 bn N.G bu PE W10.1 P VC 3G0, 75 gn-ye -X10.1 X20/5 1 N.G 2 PE W10.2 P VC 3G0, 75 gn-ye -X10.2 N2/13 1 N.G 2 PE W10.3 P VC 3G0, 75 gn-ye -X10.3 X20/6 1 N.G 2 PE W10.4 P VC 3G0, 75 gn-ye -X10.4 K35/24 1 N.G 2 Abteilung: GGB 8 e d c b a e d c b a 11.02.00 11.10.07 -X11 -Y15 2 Pi Pietig Eisenstraße 34, D-33649 Bielefeld N ame Bearb. Änderung Ers. für After-run test solution PE 1 Ers. durch Norm geprüft -Y16 2 Alle Rechte sowie technische Änder ungen vorbehalten 2 S 1 000 M-SC Klemmenplan Blatt: Mist nozzle flushing secondary -Y16.1 PE 1 Gerät: Mist nozzle flushing primary PE 1 -M3 1 M N 7 Bl. / Anz. 18/20 Bl. / gesamt 18/22 8100 6150 1001 All r ights and technical changes r eserved Zeichnung Projekt Blatt-Nr. 18 After-run demin. water humidifier 230V~/45W PE L 12 11 10 6 5 4 3 2 1 3 2 9 1 8 12 7 11 -X12 10 12 6 11 5 10 4 9 3 8 6 2 7 5 1 6 4 3 5 3 2 4 2 1 Copyr ight by G ebr . Liebisch G mbH & Co. KG Zchng. erstellt Zchng. geändert Zustand Ursprung 1 PE W11.1 P VC 3G0, 75 gn-ye -X11.1 K34/12 1 N.G 2 PE W12.1 P VC 3G0, 75 gn-ye -X12.1 K38/24 1 N.G 2 PE W12.2 P VC 3G0, 75 gn-ye -X12.2 K38/24 1 N.G 2 PE W12.4 H03VV-F 3G0,75 gn-ye -X12.4 N2/13 bn N.G bu Abteilung: GGB 8 e d c b a e d c b -X20 N. G 20.09.99 11.10.07 2 L1.G 1 X81 /2 3 -S20 1 1a 1b 4 2 7 7 -S22 1 1a 1b 6 5 2a 2b 6 X10 /2 9 t 7 t -D6T 8 6 10 9 7 10 9 -D5T 10 9 Pi Pietig 8 10 L1.F 8 X2 /7 Eisenstraße 34, D-33649 Bielefeld N ame Bearb. Änderung Ers. für Copyr ight by G ebr . Liebisch G mbH & Co. KG Zchng. erstellt Zchng. geändert Zustand Ursprung -X20 X10 /8 5 Ers. durch Norm geprüft -X21 K11 /A1 K12 /A1 5 5 K11. 2 /A 2 4 4 7 6 6 ge rt rt rt rt X2 X1 S 1 000 M-SC Klemmenplan Gerät: Blatt: Bl. / Anz. 19/20 Bl. / gesamt 19/22 8100 6150 1001 All r ights and technical changes r eserved Zeichnung Projekt Blatt-Nr. 19 -H5 X2 X1 9 8 -H4.1 X2 X1 7 6 9 8 -H6 X2 X1 5 4 7 6 -H2 X2 X1 3 2 5 4 -H1 rt 1 3 2 -H12 -X22 1 -H11 X2 10 10 -P12 X2 9 8 X1 9 8 7 -P11 ge X1 7 K12 /A2 20 19 23 24 ϑ P I D 20 19 23 24 ϑ P I D 3 3 K11 /T1 Alle Rechte sowie technische Änder ungen vorbehalten 2 1 N. F 2 L1.F 1 N. H Temperature controller heatings SAL test chamber 4 N. H Temperature controller heating SAL humidifier 3 X7 /10 Heating SAL test chamber 2 6 -X22 Heating SAL humidifier 1 K12 /T1 5 N. F 4 X3 /12 a 3 N. F Overtemperature test chamber 2 N1 /2 Overtemperature humidifier K2 /A 1 Atomizing test solution Test chamber ventilation N. F Leakage monitoring N. F Continuous/recurrent atomization N2 /2 1 Duration of test N. F Flooding humidifier K1 /A 1 Recurrent working mode X2 /6 Compressed air supply 8 Abteilung: GGB 10 10 N. F -X21 e d c b a e d c b rt X2 X1 13.06.06 11.10.07 -H4 X2 X1 3 2 -H9 1 3 2 5 5 N. G 4 4 1 rt -H57 X2 Eisenstraße 34, D-33649 Bielefeld Pietig Pietig 7 X1 8 7 9 9 8 K38 /A1 1a 1b -S23 6 6 N ame Bearb. Änderung Ers. für L1.G Copyr ight by G ebr . Liebisch G mbH & Co. KG rt -X23 Zchng. erstellt Zchng. geändert Zustand Ursprung -X23 X2 /9 1 M.E 10 10 Ers. durch Norm geprüft 3 -X24 -X24 ge 3 2 ge 4 ge ge -X25 1.1 1.3 1 1 Alle Rechte sowie technische Änder ungen vorbehalten S 1 000 M-SC Klemmenplan Gerät: Blatt: -S10 X2 10 10 -H57.5 X2 9 8 X1 9 8 6 -H57.4 X2 7 6 X1 7 6 5 -H57.3 X2 5 4 X1 5 M.E -H57.2 X2 3 M.E X1 X3 /3 2 X3 /4 -H57.1 ge 1 X1 K57 /12 1 M.E 4 2 2.3 4 4 5 5 7 8 8 9 9 Bl. / gesamt 20/22 8100 6150 1001 7 7 Bl. / Anz. 20/20 6 6 All r ights and technical changes r eserved Zeichnung Projekt Blatt-Nr. 20 3 2 2.1 3 N. F a N. G Fault of dosing pump X3 /5 Reservoir test solution reserve N2 /13 Low water humidifier M.E Reservoir test solution >25% K35 /A1 Test chamber flushing X3 /6 Reservoir test solution >50% 2 Mist nozzle flushing M.E Reservoir test solution >75% K57 /14 Reservoir test solution empty L1.F Reservoir test solution 100% L1 / L 1 -X25 Interior lighting L1 / N Abteilung: GGB 10 10 8 e d c b a