Download Operating Instructions
Transcript
Assembly of clamping ring screw joints english ATTENTION! With low flow rates and high pressures, pay attention to the gastightness of the system to avoid false dosage or gas leakage. In order to seal the system properly, proceed as follows: Mount pipe connections without stress (using compensators if necessary). Use piping with matching diameter and smooth surface. Cut off the piping at right angles and deburr. Slide coupling ring, support ring (if present) and clamping ring onto the piping in that order. Insert piping into joint as far as it will go. Union firmly tighten. Counter with a wrench on the screw-in side (do not load the device housing) and tighten by 1 ¼ turns. Electrical connections ATTENTION! To assure electromagnetic compatibility (EMC), connect the housing via as short a cable as possible (with as large a cross-section as possible) to the functional earth (FE). The GND or mass conductors of all signals of the MFC/MFM must be led in each case individually to the MFC. (If all GND signals are bridged directly at the MFC and only one conductor led to the switching cabinet, signal displacements and disturbances of the analog signals may occur (pulses, oscillations, etc.)). The MFCs/MFMs are operated with 24 V power supply. Select the connector cross-section according to the valve used and as large as possible (see Technical Data). Suitable connecting cables are to be found in Appendix A. ATTENTION! The 8-pole socket (types 8626 / 8006 / 8712 / 8702 / 8716 / 8706) only has to be tightened hand-screwed. Connect the the functional earth (FE) to the marked screw, e.g. using round pliers. 30 - MFC/MFM