DEMINERALIZATION UNIT1) TYPE B10DN
1.3
Preparation for initial operation
1.3.1
Setting up the connections
Connect the supply hoses as follows:
→ Fig. 1-1 Demineralization unit (page 1)
•
Fix the straight screw connection of the water inlet (2) to the on-site tap (3), size R ¾“
•
Fix the elbow screw connection of the water inlet (2) to the inlet connection piece (4) of
the demineralization cartridge (1)
•
Fix the elbow screw connection of the outlet (7) to the outlet connection piece (6) of the
demineralization cartridge
•
Fix the straight screw connection of the outlet (7) to connection piece (8) on the test system
•
Screw the conductivity meter (5) to the top of the demineralization cartridge
WARNING
For safe operation it is essential to:
– Insert the seals supplied in the hose connections
– Ensure a water pressure between 1.5 and 6 bar
WARNING
Connect the demineralization unit to a cold water tap only
•
Protect the unit against freezing and heat
NOTE
The local plumbing regulations and water board instructions must be observed
•
1.3.2
Keep the cartridge caps and use them when returning the cartridges for regeneration
Electrical connection
Insert the mains plug of the conductivity meter into an on-site socket-outlet