Download Service manual

Transcript
General access and emptying hydraulic circuits
To gain access to the parts contained in the sealed
chamber it is necessary to remove the lid of the sealed
chamber.
For this purpose, remove the front and side panels of
the case, remove the screws G as indicated in Fig. 6
and remove the lid.
2.5
1
Fig. 4
Emptying the primary circuit
Close the c.h. circuit flow and return cocks H.
(Fig. 7).
Remove the screws E and remove the service
panel (Fig. 5);
To gain access to the electronic regulation PCB
remove the screws F and remove the control panel lid (Fig. 5);
5
6
J
H
F
E
H
Fig. 7 --- bottom view of the boiler
F
2
Remove the front and right panels of the boiler.
3
Open the drain tap I (Fig. 8) until the boiler is completely emptied.
4
Close drain tap again once the emptying has
been completed.
Fig. 5
2.4
Access to the sealed chamber
G
I
G
Fig. 8
2.6
Fig. 6
Emptying the d.h.w. circuit
5
Close the d.c.w. inlet cock J (Fig. 7);
6
Open one or more hot water taps until the boiler
has been completely emptied.
3