Download Operating Instructions - Process pressure transmitter IPT
Transcript
4 Mounting Oxygen applications Danger: Instruments in the version "Oil and grease free for oxygen" should be unpacked just before mounting. After the protective cover of the process fitting has been removed, the label "O₂" on the process fitting is visible. Contamination by oil, grease and dirt should be avoided. Danger of explosion! 4.2 Mounting instructions Mounting position IPT-1* Vers. 3.0 functions in any installation position. It is mounted according to the same directives as a manometer (DIN EN 839-2).3) Information: We recommend using lock fittings, measuring instrument holders and siphons from the line of WIKA accessories. 4.3 Mounting steps Welding the socket To mount IPT-1* Vers. 3.0, a welded socket is necessary. Use components from the line of WIKA mounting accessories. à Note the applicable welding standards (segment welding procedure) when welding the socket. Sealing/Screwing in Use the seal corresponding to the instrument: l Process fitting GD: Tesnit seal in front of the thread - or Seal the thread with teflon, hemp or a similar resistant seal material: l Process fitting GN à Screw IPT-1* Vers. 3.0 into the welded socket. Tighten the hexagon on the process fitting with a suitable wrench. Wrench size, see chapter "Dimensional drawings". Warning: The housing must not be used to screw the instrument in! Applying tightening force can damage internal parts of the housing. 12 Probable position correction see chapter "Setup steps". Process pressure transmitter IPT-1* Vers. 3.0 - metalic sensor • Profibus PA 31544-EN-081211 3)