Download Installation manual
Transcript
Jaw chuck B-Top. Maintenance 8.3 Maintenance schedule Maintenance tasks are described in the sections below that are required for optimal and trouble-free operation. If increased wear is detected during regular inspections, then reduce the required maintenance intervals according to the actual indications of wear. Contact the manufacturer, [see the service address on the back] if you have questions concerning maintenance tasks and intervals. Interval Maintenance task After each 8 hours With high load and with use of coolant: Grease the clamping device For heavy pollution complete cleaning [see »Cleaning«]. After each 20 hours With normal load and with use of coolant: Grease the clamping device For heavy pollution complete cleaning [see »Cleaning«]. After 1000–1500 hours Completely disassemble and clean the clamping device [see section »Cleaning«]. 40 Order Hotline +49 [0]7144. 907-333