Download Saclay Drift Chambers - Operating instructions
Transcript
d. Close the MM/DC ethane valve in flammable gas arrival rack (if MMs detectors have also been prepared for this operation). e. Purge completely all 3 chambers with Argon : changing 4 times the chamber volumes takes 5 days for DC0/DC1 and 14 days for DC4. 4. Operation a. DCs gas flows and mixtures are controlled by PLC3 and by the bubblers in the MM/DC gas rack. b. DCs High Voltage and threshold settings are controlled by the COMPASS slow control. For Slow Control commands go in the Saclay barrack. c. Check the 3 DC bubblers twice per shift. Normal bubbling is in the range: 0.3-0.6 Hz. 5. PLC3 operation a. b. c. d. e. f. On the touch screen: select DC Push the MENU button Push the R4 box in order to enter the password. Type the password: 6535 and then push ENTER. Push the ESC button Select the R1 button (Ethane proportion). This proportion is either 0 (no flammable gas) or 45 (during data taking). Note: equalizing the fluxes may need to slightly change the 45% value. g. Change also the CF4 proportion (if needed). h. Push the ESC button and check that the both Ar and Ethane flows are equal. If not adjust the Ethane proportion 45%±2%