Download Operating Instructions MODULAR FLOW METER SYSTEM TS

Transcript
C. Operating unit
GB
2. Installation
2.1 Insert the batteries
Mounting steps:
1.
2.
3.
4.
Unscrew the battery compartment lid 20
Remove batteries from styrofoam buffer of packaging
Insert batteries, checking for correct polarity 19
Screw on the battery compartment lid 20
2.2 Turning the operating unit
The operating unit can be turned to the required position in 90°-steps.
Mounting steps:
1.
2.
3.
4.
5.
6.
7.
Remove cap
Release screws
Carefully lift the operating unit, paying attention to cable length!
Turn the operating unit to the required position
Mount the operating unit
Tighten the screws
Mount the cap
Turning the operating unit
21