Download Life Pod Shelters FP-4 Installation Guide

Transcript
This drawing was
created by Dougherty
Maunufacturing.
Ownership,
Authorship and
Copyright rights are
owned by Dougherty
Manufacturing. This
drawing cannot be
reproduced in whole or
in part without the
written consent of
Dougherty
Manufacturing.
Dougherty Manufacturing
1601 Tionia Rd.
New Smyrna Bch, FL 32168
TEL: 386.957.5464
FAX: 386.957.5465
Shelter must be buried to grade line with at least
40" of soil gently sloping away from hatch.
GRADE
Drawn By T.E.Z.
USE RATCHET
STRAP TO
PULL TIGHT
CABLE
CLAMP x (2)
DOUGHERTY
MANUFACTURING
APPROX.
1,000 lbs.
24
APPROX.
1,000 lbs.
12
23 3
16
FP-4
ANCHORING
SYSTEM
42
12
3
41 3
16
7-1-14
N.T.S.
1